Routing PW Flood Plain | 3/26/2020 | | 3/26/2020 | | FAIL |
Jason C. Taylor
|
|
|
A portion of the subject property is within the regulatory floodplain. This project must comply with the Boise Floodplain Ordinance (B.C.C. 11-08). If you have any questions, please call Jason Taylor at ###-####.
Upload Elevation Certificates. Elevation Certificate elevations need to be placed on site plan, foundation plan, and cross section plans. Jason Taylor ###-####.
|
BLD-Footing | 1/9/2020 | 1/10/2020 | 1/13/2020 | A | CANC |
Dave Hannah
|
|
|
Joe Phone #: ###-####
|
BLD-Footing | 12/19/2019 | 12/20/2019 | 12/23/2019 | A | PASS |
Dave Hannah
|
|
|
JOE Phone #: ###-####
|
BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PART |
Dave Hannah
|
|
|
Pouring at 1pm-Joe Phone #: ###-#### ok after spec inspection sign offs
|
BLD-Foundation | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PART |
Jim Storey
|
|
|
Joe Phone #: ###-#### placed w/si pending report.
|
BLD-Footing | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | PART |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Work in progress. Special inspector on site.
|
BLD-Foundation | 11/26/2019 | 11/27/2019 | 11/27/2019 | A | PASS |
Dave Hannah
|
|
|
Joe Phone #: ###-####
|
BLD-Foundation | 11/21/2019 | 11/25/2019 | 11/25/2019 | A | PASS |
Dave Hannah
|
|
|
Joe Phone #: ###-####
|
BLD-Footing | 11/19/2019 | 11/21/2019 | 11/21/2019 | P | PART |
Dave Hannah
|
|
|
joe Phone #: ###-####
|
BLD-Concrete | 11/19/2019 | 11/20/2019 | 11/21/2019 | P | PASS |
Dave Hannah
|
|
|
joe Phone #: ###-####
|
BLD-Other | 11/15/2019 | 11/19/2019 | 11/19/2019 | A | PASS |
Dave Hannah
|
|
|
pour at 2 // concrete columns // Joe Phone #: ###-####
|
BLD-Other | 11/15/2019 | 11/18/2019 | 11/18/2019 | A | PASS |
Dave Hannah
|
|
|
pour at 1 // concrete columns // Joe Phone #: ###-####
|
BLD-Footing | 11/13/2019 | 11/14/2019 | 11/18/2019 | P | PASS |
Dave Hannah
|
|
|
poured columns // Joe Phone #: ###-####
|
BLD-Concrete | 11/13/2019 | 11/14/2019 | 11/18/2019 | A | PASS |
Dave Hannah
|
|
|
poured columns // Joe Phone #: ###-####
|
BLD-Footing | 11/6/2019 | 11/7/2019 | 11/8/2019 | P | PASS |
Dave Hannah
|
|
|
Joe Phone #: ###-####
|
BLD-Conference | 10/25/2019 | 10/28/2019 | 10/29/2019 | A | DONE |
Dave Hannah
|
|
|
joe Phone #: ###-####
|
BLD-Conference | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | DONE |
Mike Jordan
|
|
|
Joe Sonic Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/16/2019 | | DONE |
|
|
|
|
Telephone call | | | 10/16/2019 | | DONE |
|
|
|
Emailed permits to be signed to- tim.callahan@opus-group.com Eplan needs to be released
|
Inspection Record Card- Bld | | | 10/16/2019 | | DONE |
|
|
|
|
Telephone call | | | 10/15/2019 | | DONE |
|
|
|
PER TISHA okay to issue without ACHD see Doc_emailed- Emailed tim.callahan@opus-group.com to inform cust that ACHD Receipt or Fees need to be paid.
|
Permit Ready to Issue | | | 10/3/2019 | | DONE |
|
|
|
ALL MET SEE EMAIL FROM 10-16-19 Need
ACHD
MET
GC Form
Revised Value
|
Plan assigned to (JAR) | 8/14/2019 | 8/14/2019 | 10/2/2019 | | DONE |
Julie Romig
|
|
|
09/30 - Reroute to DR/Add - 1st Rev Comp - **GREEN TAG** 3rd & Myrtle Footing/Foundation Only
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/17/2019 | | 10/2/2019 | | PASS |
Julie Romig
|
|
|
Do not issue until Grading Permit is issued. Bldg Review passed. Air rights and ROS finalized; route back to DR/Addressing for sign off.
|
Routing - Design Review | 9/27/2019 | | 9/30/2019 | | PASS |
Josh Wilson
|
|
|
|
Routing - FIRE | 9/17/2019 | 9/17/2019 | 9/27/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - Addressing | 9/27/2019 | | 9/27/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Drainage | 9/17/2019 | | 9/27/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - Design Review | 9/17/2019 | | 9/25/2019 | | FAIL |
Josh Wilson
|
|
|
1. Air rights agreement with ACHD required, 2. Record of Survey combining parcels must be completed
|
Routing Off Site - STRUCTURAL | 9/17/2019 | | 9/18/2019 | | PASS |
Julie Romig
|
|
|
|
Routing - Addressing | 9/17/2019 | | 9/17/2019 | | FAIL |
Doug Chausow
|
|
|
All parcels need to be consolidated into 1
|
Route to Impact Fee Review | 9/3/2019 | 9/6/2019 | 9/4/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 8/14/2019 | | 9/3/2019 | | FAIL |
Julie Romig
|
|
|
Refer to ePlanReview for required corrections.
|
Routing Off Site - STRUCTURAL | 8/14/2019 | | 9/3/2019 | | FAIL |
Julie Romig
|
|
|
Jacobs
|
1st review completed | | | 9/3/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 8/14/2019 | 8/14/2019 | 8/29/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing PW Environmental | 8/15/2019 | | 8/27/2019 | | PASS |
Rick Christenson
|
|
|
Pretreatment needs to review plans with grease abatement for listed cafe
|
Routing - Design Review | 8/14/2019 | | 8/26/2019 | | FAIL |
Josh Wilson
|
|
|
1. Air rights agreement with ACHD required, 2. Shell/core permit must be submitted prior to sign off on foundation permit
|
Routing PW Drainage | 8/15/2019 | | 8/22/2019 | | FAIL |
Brian Murphy
|
|
|
NEED GRADING PLAN APPROVAL
|
Routing PW Street Lights | 8/15/2019 | | 8/19/2019 | | PASS |
Tom Marshall
|
|
|
Streetlight plans should be on the next BLD submitted.
|
Routing - Erosion and Sediment | 8/14/2019 | | 8/16/2019 | | PASS |
Michael Zawacki
|
|
|
Please refer to ESC19-00292 attached to grading and drainage permit.
|
Routing - MECHANICAL | 8/14/2019 | | 8/16/2019 | | PASS |
Troy James
|
|
|
No mechanical to review at this time.
|
Routing - PLUMBING | 8/14/2019 | | 8/15/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 8/14/2019 | | 8/15/2019 | | PASS |
David Moser
|
|
|
SEE DRH19-00007
|
Routing - Addressing | 8/14/2019 | | 8/15/2019 | | FAIL |
Doug Chausow
|
|
|
Individual parcels need to be conolidated into 1.
|
Routing - PUBLIC WORKS | 8/14/2019 | | 8/15/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Sewer Design | 8/15/2019 | | 8/15/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Solid Waste | 8/15/2019 | | 8/15/2019 | | PASS |
Evan Carpenter
|
|
|
|
Intake Approval | | | 8/14/2019 | | PASS |
Michael Hanson
|
|
|
|
Intake Approval | | | 8/7/2019 | | FAIL |
Michael Hanson
|
|
|
1. #310 form is incomplete - Complete all fields on cover sheet including permit number, owner information, owner signature.
2. Structural sheets are missing the Idaho registered design professional stamp, signed and dated. please resubmit all structural sheets for approval with this stamp, signed and dated.
|
Application received | | | 8/2/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 2 2019 11:19AM
|