Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-02945
StatusIssued
Name MCALVAIN CONSTRUCTION INC
Site Address 600 W FRONT ST
Project NameThe Vanguard - Type IA Podium
Customer NumberBLD19-02946
ePlanReviewYes
Description
**2 PERMITS UNDER EPLAN BLD19-02945** (THE VANGUARD - TYPE IA PODIUM) Note: This project to be constructed under City Code 9-3 Special Design Standards for Type V Construction code. // 02-18-20 DEFERRED SUBMITTAL FOR GEOPIERS. JAR // Permit to demolish the existing building and construct a 21,547 sq ft, 3-story Type IA podium of a new 56,538 sq ft 8-story mixed-use multifamily residential project with ground floor retail and structured parking. The Type VA residential building above podium is constructed under BLD19-02946. Work to include: demolition of the existing 7,676 sq ft building; grading and sitework for the new structure; construction of concrete foundation, structural steel, and PT concrete slab; installation of interior non-bearing walls and bearing walls to create 22 individual dwelling units; new plumbing, electrical, mechanical, insulation, windows, doors, and interior finishes in compliance with Chapter 8 of the 2015 IBC. Special inspections required per the attached Form 310. Special Inspection survey required to verify low point of grade at beginning of construction, building height of top floor at framing stage and at final construction. Deferred submittals as listed on G0.01. Approval contingent upon adhering to the approved plans on file and attached engineering. This building will be sprinklered with a fully compliant NFPA 13 and NFPA fire alarm system to comply with the 5 story wood construction ordinance, allowable area increase, and story increase. **JAR**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing3/19/20203/20/20203/26/2020APEND
DetailsDave Hannah
Dannie McMurray Phone #: ###-#### Inspection requested via web by Dannie McMurray ok after spec inspection sign offs
OVERRIDE  2/18/2020  
Plan assigned to (JAR)2/11/20202/11/20202/18/2020 DONE
DetailsJulie Romig
02/18 - The Vanguard Deferred Submittal - Structural review of piers
PLANS/APPL TAKEN TO FRONT DESK  2/18/2020 DONE
Permit Ready to Issue  2/18/2020 DONE
deferral submittal approved
CHANGE STATUS TO (ISS)  2/18/2020 DONE
Routing Off Site - STRUCTURAL2/12/2020 2/14/2020 PASS
DetailsJulie Romig
KPFF - Deferred Submittal
Print Occupancy Form  2/11/2020 DONE
Issue PAID IN FULL permit  2/11/2020 DONE
Plan Modification Accepted  2/11/2020 DONE
Per Angie Brosiou, deferred submittal
OVERRIDE  2/10/2020  
Telephone call  2/10/2020 DONE
Emailed Torry to inform them that not all the fees have been paid for both permits. Once all the fees have been paid we can issue the permits.
Permit Ready to Issue  2/10/2020 DONE
**TWO PERMITS**
MET- NEED
GC
Revised Certificate of Value
Plan assigned to (JAR)8/19/20198/19/20192/7/2020 DONE
DetailsJulie Romig
1st Rev Comp - 3rd Comp - 600 W Front Type IA Podium
Routing - Design Review2/7/2020 2/7/2020 PASS
DetailsJosh Wilson
Routing - PLAN CHECK2/7/2020 2/7/2020 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  2/7/2020 DONE
Routing - FIRE11/25/201911/25/201912/9/2019 PASS
DetailsErika Akin
Attached comments to case
Routing - PLAN CHECK11/25/2019 12/9/2019 FAIL
DetailsJulie Romig
Routing - PLUMBING12/9/2019 12/9/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - MECHANICAL12/6/2019 12/6/2019 PASS
DetailsChad Schwendiman
Routing PW Street Lights11/25/2019 12/2/2019 PASS
DetailsTom Marshall
Routing Off Site - STRUCTURAL11/25/2019 11/30/2019 PASS
DetailsJulie Romig
Routing PW Drainage11/25/2019 11/26/2019 PASS
DetailsBrian Murphy
Routing PW Sewer Design11/25/2019 11/26/2019 PASS
DetailsDeAnn Brown
Plan resubmittals received  11/25/2019 DONE
Received resubmittal in ePlan.
Routing - FIRE10/21/201910/21/201911/14/2019 FAIL
DetailsErika Akin
Attached comments to case and emailed architect
Routing - PLAN CHECK10/21/2019 11/14/2019 FAIL
DetailsJulie Romig
Routing - MECHANICAL10/21/2019 10/29/2019 PASS
DetailsChad Schwendiman
No generator has been specified at this time. The vent length will need to be field verified.
Routing Off Site - STRUCTURAL10/21/2019 10/28/2019 FAIL
DetailsJulie Romig
KPFF
Routing PW Drainage10/21/2019 10/28/2019 FAIL
O/M OWNER APDX J/ACHD/ITD
Routing - PLUMBING10/21/2019 10/25/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC
Routing PW Sewer Design10/21/2019 10/25/2019 FAIL
DetailsDeAnn Brown
Sewer design redlines sent directly via email. Resubmit updated/approved sewer extension plans.
Routing - Design Review10/21/2019 10/23/2019 FAIL
DetailsJosh Wilson
1. Need executed ITD air rights agreement.
Routing PW Street Lights10/21/2019 10/22/2019 FAIL
DetailsTom Marshall
Route to Impact Fee Review10/1/201910/4/201910/7/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  10/1/2019 FAIL
DetailsJulie Romig
Routing - PLAN CHECK8/19/2019 10/1/2019 FAIL
DetailsJulie Romig
Routing - FIRE8/19/20198/19/20199/27/2019 FAIL
DetailsErika Akin
Attached comments to case and emailed architect
Routing PW Drainage8/21/2019 9/11/2019 FAIL
DetailsBrian Murphy
NEED ACHD OK 2 YEAR STORM USED FOR ROOF APENDX J
Routing Off Site - STRUCTURAL8/19/2019 9/4/2019 FAIL
DetailsJulie Romig
KPFF
Routing PW Solid Waste8/21/2019 8/30/2019 PASS
DetailsEvan Carpenter
Building staff to move solid waste containers to service location.
Routing - Design Review8/19/2019 8/30/2019 FAIL
DetailsJosh Wilson
1. Need executed ITD air rights agreement. 2. Need executed ACHD air rights agreement.
Routing - MECHANICAL8/19/2019 8/28/2019 FAIL
DetailsChad Schwendiman
Change marks on plans, uploaded mechanical plan review report and emailed it to the applicant.
Routing PW Environmental8/21/2019 8/27/2019 PASS
DetailsRick Christenson
Grease Interceptor shown. GW line needs to be available for future commercial kitchen/coffee shop use.
Routing - PUBLIC WORKS8/19/2019 8/27/2019 PASS
DetailsMorgan Webb
Routing PW Street Lights8/21/2019 8/23/2019 FAIL
DetailsTom Marshall
Routing PW Sewer Design8/21/2019 8/23/2019 FAIL
DetailsDeAnn Brown
Sewer extension plans have not been reviewed and approved by City of Boise Public Works. Please submit pdf of sewer extension plans for review to DeAnn Brown.
Routing - Erosion and Sediment8/19/2019 8/21/2019 PASS
DetailsMichael Zawacki
Site prep inspection required.
Routing - Addressing8/19/2019 8/21/2019 PASS
DetailsDoug Chausow
Routing - PLANNING8/19/2019 8/20/2019 PASS
DetailsDavid Moser
See DRH19-00096
Routing - PLUMBING8/19/2019 8/19/2019 PASS
DetailsDaryl Spivey
1) Provide suds relief as required 711.1
2) May install DCVA on service instead of RPBP. If RP is used provide adequate drainage. 4 in. Floor sink not adequate drainage.
3) Per plan and ISPC.
Intake Approval  8/14/2019 PASS
Application received  8/2/2019 DONE
Application submitted via PDS Online on Aug 2 2019 1:32PM
Routing - Design Review11/25/2019   FAIL
1. Modified elvations require Design Review approval 2. ITD air rights required.