BLD-Aging Inspection | 7/17/2020 | 7/17/2020 | 7/17/2020 | | PASS |
Jim Storey
|
|
|
occ card signed on site
|
BLD-Final | 3/4/2020 | 3/5/2020 | 3/5/2020 | A | PASS |
Jim Storey
|
|
|
Bulk Nitrous Oxide Canopy near Nitrogen Plant Inspection requested via web by Wayne Berry
|
BLD-Final | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Wayne Berry landing and si report
|
FIRE-Final Inspection | 2/4/2020 | 2/5/2020 | 2/5/2020 | A | PASS |
Jim Page
|
|
|
No fire spri8nklers, no fire alarms, fire extinguishers will be mounted in discussed locations. As-builts to be completed before BLD final showing relaction of man-gate. Final life fire safety inspection for scope of work complete, signature card not avaiable at time of inspection.
2nd try...sorry I missed your call! Phone #: ###-#### Inspection requested via web by Wayne Berry
|
FIRE-Final Inspection | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | FAIL |
Jim Page
|
|
|
Called point of contact listed at 0945, left message with my contact information and stated that if a return call was not made by 1000 then I was going to proceed to next inspection. Inspection request was left open until 12:30PM with no return call, inspection request will need to be rescheduled.
life Safety Inspection Phone #: ###-#### Inspection requested via web by Wayne Berry
|
Fees Due Hold | 11/28/2019 | | 12/16/2019 | | DONE |
Gemma Flores
|
|
|
|
Route to Impact Fee Review | 11/20/2019 | 11/23/2019 | 12/4/2019 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (JAR) | 10/18/2019 | 10/23/2019 | 12/4/2019 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - 502 Micron Shade Canopy **Need Calcs, Route to AHJ**
|
Issue & PRINT to be Invoiced | | | 11/27/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/27/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 11/22/2019 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/22/2019 | | 11/22/2019 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/22/2019 | | DONE |
|
|
|
ALL MET
Need
RP
GC Form (one uploaded in Eplan is not for Micron)
Revised Cert of Value
|
Routing - PUBLIC WORKS | 10/23/2019 | | 11/21/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - FIRE | 10/18/2019 | 10/23/2019 | 11/20/2019 | | PASS |
Erika Akin
|
|
|
No comments attached. Shade canopy for N20 tube trailers. Clearance around trailers shall be at least three feet in accordance with IFC 5303.7.11. Piping system connections may encroach in the three foot clear space. Plans checked for hydrants, access, MAQs and 3' clear space.
|
Routing Off Site - STRUCTURAL | 10/23/2019 | | 11/20/2019 | | FAIL |
Julie Romig
|
|
|
AHJ - Need calculations for pre-engineered metal building (only foundation calcs were provided in ePlan).
|
1st review completed | | | 11/20/2019 | | DONE |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 10/23/2019 | | 11/20/2019 | | PASS |
Julie Romig
|
|
|
|
Routing - PLANNING | 10/23/2019 | | 10/24/2019 | | PASS |
Karla Nelson
|
|
|
|
Routing - Addressing | 10/23/2019 | | 10/24/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - Design Review | 10/23/2019 | | 10/24/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing PW Street Lights | 10/23/2019 | | 10/24/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 10/23/2019 | | 10/24/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 10/23/2019 | | 10/23/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - Erosion and Sediment | 10/23/2019 | | 10/23/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved.
|
Intake Approval | | | 10/18/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 10/8/2019 | | FAIL |
Javier Guzman
|
|
|
See prescreen coordinator comments below and email response sent 10/8/2019.
For prescreen provide and upload the following per checklist:
• Revised structural plan sheets S1 through S20 came back with no engineer signature on the engineer’s stamp, revise so the Idaho licensed engineer stamp is signed and dated.
• Revised plan sheets GN, F1, F2 and S1 through S20 came back with a sheet size of 11” x 17” and are required per checklist to be a minimum of 18” x 24” in sheet size, revise plan sheet size of plan sheets GN, F1, F2 and S1 through S20 so that they are a minimum of 18” x 24” in sheet size.
• Per ePlan submittal standards the reserve the bottom right corner for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet S1 through S20 (see blue highlighted box I have placed on sheet S1 for location of city stamp assuming the sheet is 18”h x 24”w, and ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf )
|
Intake Approval | | | 8/30/2019 | | FAIL |
Javier Guzman
|
|
|
For prescreen provide and upload the following per checklist:
• Provide DR/Planning & Zoning letters of approval.
• Per ePlan submittal standards the reserve the bottom right corner for City approval stamps. Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block on the cover sheet G0. (see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf )
• Per checklist the provided G0 cover plan sheet is required to be stamped and signed by an Idaho licensed architect and a minimum of 18” x 24” size (currently they are 11” x 17”)
• Per ePlan submittal standards the reserve the bottom right corner for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet C01,C02, C03, C10, C50, E211, GN, F1, F2 and S1 through S20 (see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf )
• Per checklist the plan sheet A211, S51, is required to be stamped and signed by an Idaho licensed architect or engineer.
|
Application received | | | 8/2/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 2 2019 1:57PM
|