Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-02949
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 12501 W FRANKLIN RD
Project NameInsulation Distributors
Customer Number 
ePlanReviewYes
Description
(INSULATION DISTRIBUTORS, INC. - FRANKLIN COMMERCE CENTER - EAST END OF BUILDING) (DRH18-00102) (1-22-20 PLAN MODIFICATION TO RELOCATE A TENANT DEMISING WALL, ADD AN ADDITIONAL OVERHEAD DOOR, REMOVE A PREVIOUSLY PROPOSED CONFERENCE ROOM, AND TO ESTABLISH A CERTIFICATE OF OCCUPANCY FOR A 13,682 SQUARE FOOT TENANT SPACE [1,684 SQUARE FOOT OFFICE AREA AND 11,975 SQUARE FOOT WAREHOUSE]. THE VALUE OF THE WORK HAS SIGNIFICANTLY INCREASED.) The fire sprinkler system is used for building area increase and for fire area. To construct interior tenant improvements within the East end of an existing 34,754 square foot building constructed under permit BLD18-03200. Work is to include an insulated interior nonbearing tenant demising wall, interior nonbearing walls, suspended acoustical ceilings, gypsum board ceilings, two toilet rooms accessible to the disabled, interior doors, millwork, and finishes. A separate racking permit is required for racks over 8 feet tall. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 6/22/20207/9/2020 DONE
mailed 7-9-2020
Permanent Occupancy  6/12/2020 DONE
BLD-Final4/3/20204/6/20204/6/2020APASS
DetailsMike Jordan
Gene Phone #: ###-####
FIRE-Final Inspection4/3/20204/3/20204/3/2020PPASS
DetailsTroy Cobbley
Life safety passed.


Gene Phone #: ###-####
BLD-Ceiling Grid Inspection3/5/20203/6/20203/6/2020APASS
DetailsMike Jordan
Gene Phone #: ###-####
BLD-Energy code compliance2/11/20202/12/20202/12/2020APASS
DetailsMike Jordan
Jean Phone #: ###-####
BLD-Framing/Rough-in2/6/20202/6/20202/6/2020PPASS
DetailsMike Jordan
Gene Phone #: ###-####
BLD-Framing/Rough-in1/23/20201/24/20201/24/2020ANR
DetailsJim Storey
Gene Phone #: ###-####
CHANGE STATUS TO (ISS)  1/23/2020 DONE
Plan assigned to (CJW)1/15/20201/15/20201/22/2020 PASS
DetailsCarl Westfall
plan mod (routed to staff)
Plan Reviewer's activity  1/22/2020 PASS
DetailsCarl Westfall
Plan mod approved
Permit Ready to Issue  1/22/2020 DONE
PLAN MOD
Print Occupancy Form  1/22/2020 DONE
Routing PW Environmental1/17/2020 1/21/2020 PASS
DetailsRick Christenson
Routing - PLAN CHECK1/16/2020 1/17/2020 PASS
DetailsCarl Westfall
Plan mod plan intake review approved. Plan mod review approved. Plan mod routed
Routing - Design Review1/17/2020 1/17/2020 PASS
DetailsKatelyn Menuge
Additional exterior overhead door okay.
Plan Modification Accepted  1/15/2020 DONE
add demising wall, add overhead door and remove conference room
Meeting  1/15/2020 DONE
did not add in fee for audit value for plan mod
Issue PAID IN FULL permit  12/31/2019 DONE
Inspection Record Card- Bld  12/31/2019 DONE
Telephone call  12/31/2019 DONE
emailed permit to be sign to- jnorton@jwci.com Eplan will need to be release
Plan assigned to (CJW)8/21/20198/21/20199/17/2019 PASS
DetailsJavier Guzman
(1st done) 08/30/19 (L-2 - 10 days) (eplan - 27 sheets) East End Tenant Shell Work (to staff)
Routing - Design Review9/13/2019 9/17/2019 PASS
DetailsAndrea Tuning
PLANS/APPL TAKEN TO FRONT DESK  9/17/2019 DONE
Permit Ready to Issue  9/17/2019 DONE
all met: jnorton@jwci.com

NEED
GC form
Revised Certificate of Value
Route to Impact Fee Review9/13/20199/16/20199/16/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK8/21/2019 9/13/2019 PASS
DetailsCarl Westfall
1st review completed  9/13/2019 DONE
Plan resubmittals requested  9/13/2019 DONE
Design Review did not pass it.
Plan resubmittals received  9/13/2019 DONE
Routed drawings
Routing - PLAN CHECK9/13/2019 9/13/2019 PASS
DetailsCarl Westfall
drawings routed
Routing - FIRE8/21/20198/21/20198/29/2019 PASS
DetailsMark Scharfen
08.29-Vanilla finish. Completed fire review. No occupancy on this permit. No report uploaded, minor ti.
Routing PW Environmental8/22/2019 8/27/2019 PASS
DetailsRick Christenson
Future tenant requires Pretreatment Review.
Routing - MECHANICAL8/21/2019 8/23/2019 PASS
DetailsTroy James
Routing - Addressing8/21/2019 8/22/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/21/2019 8/22/2019 PASS
DetailsMorgan Webb
Routing - Design Review8/21/2019 8/21/2019 FAIL
DetailsAndrea Tuning
Appeal period has expired.
Routing - PLUMBING8/21/2019 8/21/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING8/21/2019 8/21/2019 PASS
DetailsDavid Moser
Intake Approval  8/19/2019 PASS
DetailsJavier Guzman
Intake Approval  8/7/2019 FAIL
DetailsMichael Hanson
Provide structural engineering analysis and/or calculations for new #1000 HVAC roof top units that exceed the designed #750 shell installed roof curbs.
Application received  8/2/2019 DONE
Application submitted via PDS Online on Aug 2 2019 2:51PM