BLD-Final | 5/1/2020 | 5/4/2020 | 5/4/2020 | A | PASS |
Tony Young
|
|
|
Sreened- Josiah Phone #: ###-####
|
DOC - Permit Finaled | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | DONE |
Tony Young
|
|
|
Sreened- Josiah Phone #: ###-####// 3.8
|
BLD-Final | 4/28/2020 | 4/29/2020 | 4/29/2020 | A | PART |
Tony Young
|
|
|
Josiah Phone #: ###-####// conf walk through,, needs fire caulking, f/p pass,, ADU is on seperate permit,, needs handrail, guardrail including open risers, address posted
|
BLD-Energy code compliance | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Tony Young
|
|
|
Nate Phone #: ###-####
|
BLD-Framing/Rough-in | 1/6/2020 | 1/7/2020 | 1/7/2020 | A | PEND |
Dave Hannah
|
|
|
Nate Phone #: ###-#### ok to insulate house still needs mec corretions done and call in framing for adu
|
BLD-Wall Bracing | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to cover exterior...
|
BLD-Wall Bracing | 11/15/2019 | 11/18/2019 | 11/18/2019 | A | FAIL |
Tony Young
|
|
|
Nate Phone #: ###-####.. do per plan
|
BLD-Wall Bracing | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | NR |
Tony Young
|
|
|
Nate Phone #: ###-####
|
BLD-Foundation | 9/24/2019 | 9/25/2019 | 9/25/2019 | P | PART |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru// work in progress
|
BLD-Footing | 9/24/2019 | 9/24/2019 | 9/24/2019 | A | PART |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron// new set backs ok per N. W// work in progress,, ok
|
Telephone call | | | 9/4/2019 | | DONE |
|
|
|
Waiting to hear from Nate: Emailed Nate to verify company name because the RCE number that was provided is not coming up as Legacy Homes. Permit needs to be re-issue with the correct company name and need to re-signed.
Permit was put back as applicant name
|
Place hold on job | 9/4/2019 | | 9/4/2019 | | DONE |
Judith Amador
|
|
|
per Tisha, okay to take hold and she will contact Nate- Waiting for confirmation on who the GC is, please see Telephone acitivity.
|
Telephone call | | | 9/4/2019 | | DONE |
|
|
|
Austin called back and said that Nate works or use to work under Vandalay Homes but that Legacy Homes contracted him and they were going to try to figure out the issue with the RCE because they want the permit to be under Legacy Home.
|
(F) Reprint permit | | | 9/4/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/30/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2019 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2019 | | DONE |
|
|
|
MET- email permit to Nate at legacy to sign please release plans
|
OVERRIDE | | | 8/26/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 8/16/2019 | 8/16/2019 | 8/26/2019 | | DONE |
Jenny Nelson
|
|
|
08/23 sfd L1 ePlan. 1st complete 8/16, need fire assembly detail and ul#, egress window, attic access, mech equip in adu
|
Routing - PLAN CHECK | 8/26/2019 | | 8/26/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2019 | | DONE |
Jenny Nelson
|
|
|
|
Override - Parcel Holds | | | 8/26/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 8/26/2019 | | DONE |
|
|
|
DO NOT ISSUE WITHOUT BLD19-02993
|
Plan assigned to (RDP) | 8/6/2019 | 8/6/2019 | 8/16/2019 | | DEFR |
Rob Patrick
|
|
|
08/23 sfd L2 ePlan (2993)
|
Routing - PLAN CHECK | 8/6/2019 | | 8/16/2019 | | FAIL |
Jenny Nelson
|
|
|
|
1st review completed | | | 8/16/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - FIRE | 8/6/2019 | 8/6/2019 | 8/13/2019 | | PASS |
Lee G Meredith
|
|
|
08/19-925 N Lander 2 permits in ePlan under BLD19-02956 RES LGM
Sprinklers are not required.
|
Routing - MECHANICAL | 8/13/2019 | | 8/13/2019 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 8/6/2019 | | 8/8/2019 | | PASS |
Morgan Webb
|
|
|
|
Route to Impact Fee Review | 8/6/2019 | 8/9/2019 | 8/7/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 8/6/2019 | | 8/7/2019 | | FAIL |
Troy James
|
|
|
Emailed designer corrections
|
Routing - PLANNING | 8/6/2019 | | 8/7/2019 | | PASS |
Nicolette Womack
|
|
|
Required to pave driveway to common driveway.
|
Routing - Addressing | 8/6/2019 | | 8/7/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 8/6/2019 | | FAIL |
|
|
|
Second prescreen 8-6-19: Please have your second application reflect the information of the ADU. Right now it is showing the main home information.
|
Plans ACCEPTED BY PLAN TECH | | | 8/6/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/6/2019 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 8/6/2019 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/6/2019 | | DONE |
|
|
|
|
Meeting | | | 8/5/2019 | | DONE |
|
|
|
was in the process of prescreen review but customer needed to make changes-so drawings will be deleted and resubmitted
|
Intake Approval | | | 8/5/2019 | | FAIL |
|
|
|
need permit app for the ADU-need the floor plan to reflect that it is an ADU by showing the bedroom, closet, w/d, stove ect-then put the ADU permit # on the new SFD and the New SFD permit # on the ADU
|
Application received | | | 8/3/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 3 2019 11:52AM
|