Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD19-02968
StatusIssued
Name LIZA MARIA RODRIGUEZ JIMENEZ
Site Address 2111 N 20TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
***PLAN MODIFICATION FOR STRUCTURAL ENGINEERING TO ADD HEADERS, RIDGE BEAMS AND SPREAD FOOTING*** Permit for a remodel, to include: Adding a one story addition to existing home. Includes new footing and foundation, back covered patio, engineered truss system. - All work per plans, notes, engineering, & local code. Separate electrical, plumbing & mechanical permits required. **RDP**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/11/20206/11/20206/17/2020 PASS
DetailsTony Young
BLD-Aging Inspection6/10/20206/10/20206/11/2020 PASS
DetailsTony Young
BLD-Energy code compliance1/27/20201/28/20201/28/2020APASS
DetailsBob Archibald
Liza Phone #: ###-####
BLD-Framing/Rough-in1/21/20201/21/20201/21/2020PPASS
DetailsTony Young
Liza Phone #: ###-####// house and garage ok
Routing - MECHANICAL12/31/2019 12/31/2019 PASS
DetailsTroy James
Revised manual j report.
BLD-Framing/Rough-in10/8/201910/9/201910/9/2019ANR
DetailsTony Young
Lisa Phone #: ###-####
BLD-Wall Bracing10/8/201910/9/201910/9/2019APASS
DetailsTony Young
Lisa Phone #: ###-####
BLD-Footing9/3/20199/4/20199/4/2019APART
DetailsTony Young
10 am pour // Liza Phone #: ###-####,, ok after adding rebar per engineering in large basement point load footing
BLD-Footing9/3/20199/3/20199/3/2019PNR
DetailsTony Young
Liza Phone #: ###-####
BLD-Conference8/26/20198/27/20198/27/2019APEND
DetailsTony Young
footing ?s pending engineer direction on interior basement footing
BLD-Foundation8/21/20198/21/20198/21/2019PPASS
DetailsDave Hannah
Liza Phone #: ###-####
BLD-Framing/Rough-in8/20/20198/21/20198/21/2019APART
DetailsTony Young
Liza Phone #: ###-####,, walk through frame conf only with Rob Patrick plans reviewer,, foundation for garage and addition ok
Plan assigned to (RDP)8/19/20198/19/20198/19/2019 DONE
DetailsRob Patrick
Routing Walk-In (BLD)8/19/20198/19/20198/19/2019ADONE
DetailsRob Patrick
Plan Modification Accepted  8/19/2019 DONE
aplan mod accepted by BLH-assigned to Rob P
Routing - PLAN CHECK8/19/2019 8/19/2019 PASS
DetailsRob Patrick
Permit Ready to Issue  8/19/2019 DONE
CHANGE STATUS TO (ISS)  8/19/2019 DONE
Inspection Record Card- Bld  8/19/2019 DONE
BLD-Footing8/15/20198/16/20198/16/2019APASS
DetailsTony Young
Liza Phone #: ###-####,, set backs ok now,, ok to pour
BLD-Conference8/13/20198/14/20198/14/2019APART
DetailsTony Young
Lisa; Phone #: ###-####,, needs to move garage to meet set backs
BLD-Conference8/13/20198/13/20198/13/2019APART
DetailsTony Young
conference requested per Tony ,, set back ?s,, need to have setbacks on garage,, soils ok per site visit from Bob A.
BLD-Footing8/12/20198/12/20198/12/2019PNR
DetailsTony Young
Liza Phone #: ###-####,, needs compaction test on added road mix,, need to verify setbacks,, see the actual plan
Plan assigned to (RDP)8/5/20198/5/20198/6/2019 DONE
DetailsRob Patrick
08/09 Walk-In PAPER
Routing - MECHANICAL8/6/2019 8/6/2019 PASS
DetailsChad Schwendiman
Routing - PLAN CHECK8/6/2019 8/6/2019 PASS
DetailsRob Patrick
1st review completed  8/6/2019 DONE
DetailsRob Patrick
Inspection Record Card- Bld  8/6/2019 DONE
DetailsRob Patrick
Case Summary (BLD)  8/6/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  8/6/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  8/6/2019 DONE
Telephone call  8/6/2019 DONE
Called to leave message but VM was full. Email him that the permit is ready what a list of fees.
Issue PAID IN FULL permit  8/6/2019 DONE
Routing Walk-In (Zoning)8/5/20198/5/20198/5/2019APASS
DetailsTed Vanegas
DRH19-00274
Routing Walk-In (BLD)8/5/20198/5/20198/5/2019AFAIL
DetailsRob Patrick
Took in as Level 2.
Application received 8/5/2019