BLD-Final | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | PASS |
Brandon Shaw
|
|
|
Chad Phone #: ###-####
|
DOC - Permit Finaled | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Brandon Shaw
|
|
|
Using existing footings with post installed hardware....
|
Plan assigned to (RDP) | 8/6/2019 | 8/6/2019 | 8/12/2019 | | DONE |
Rob Patrick
|
|
|
Route to Hill side per Jason T.
|
Routing - PLAN CHECK | 8/6/2019 | | 8/12/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 8/12/2019 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 8/12/2019 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 8/12/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/12/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 8/12/2019 | | DONE |
|
|
|
|
Telephone call | | | 8/12/2019 | | DONE |
|
|
|
called Chad to let know permit is ready and how much is owed
|
Issue PAID IN FULL permit | | | 8/12/2019 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 8/6/2019 | | 8/9/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 8/7/2019 | | 8/9/2019 | | PASS |
Melissa Jannusch
|
|
|
IF NEW FOOTINGS. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing Walk-In (Zoning) | 8/6/2019 | 8/6/2019 | 8/6/2019 | A | PASS |
Jeff Lowe
|
|
|
contingent on 30-foot defensible space being maintained
|
Routing Walk-In (BLD) | 8/6/2019 | 8/6/2019 | 8/6/2019 | A | CANC |
Rob Patrick
|
|
|
Neeed to take in for Hillside review.
|
Routing - Addressing | 8/6/2019 | | 8/6/2019 | | PASS |
Doug Chausow
|
|
|
|
Application received | | 8/6/2019 | | | |
|
|
|
|