BLD-Final | 3/4/2020 | 3/5/2020 | 3/5/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 3/5/2020 | 3/5/2020 | 3/5/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 379
|
BLD-Final | 2/28/2020 | 3/2/2020 | 3/2/2020 | A | NR |
Brandon Shaw
|
|
|
Need trades...
|
PubWorks Occupancy Approval | 1/24/2020 | 1/24/2020 | 1/24/2020 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Other | 12/6/2019 | 12/6/2019 | 12/6/2019 | P | PASS |
Brandon Shaw
|
|
|
soffit // Les Phone #: ###-####
|
BLD-Wall Bracing | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Foundation | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 9/18/2019 | 9/18/2019 | 9/18/2019 | A | NR |
Brandon Shaw
|
|
|
Need soil subgrade submitted and approved by PW...
|
PubWorks Subgrade Approval | 9/18/2019 | 9/18/2019 | 9/18/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 9/15/2019 | 9/16/2019 | 9/16/2019 | P | CANC |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
Issue PAID IN FULL permit | | | 9/4/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/4/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/3/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 8/16/2019 | 8/16/2019 | 9/3/2019 | | DONE |
Rob Patrick
|
|
|
09/04 sfd L2 eplan
|
Routing - PLAN CHECK | 8/16/2019 | | 9/3/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 9/3/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/3/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 9/3/2019 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 8/16/2019 | | 8/26/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - Addressing | 8/16/2019 | | 8/20/2019 | | PASS |
Laura Hunter
|
|
|
|
Route to Impact Fee Review | 8/16/2019 | 8/19/2019 | 8/19/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 8/16/2019 | 8/16/2019 | 8/19/2019 | | PASS |
Lee G Meredith
|
|
|
08/29-2394 S Trapper Pl. RES ePlan LGM
Sprinklers are not required.
|
Routing - MECHANICAL | 8/16/2019 | | 8/19/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/16/2019 | | 8/16/2019 | | PASS |
Sue Cummings
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/16/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/16/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/16/2019 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 8/16/2019 | | 8/16/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 8/16/2019 | | 8/16/2019 | | PASS |
Michael Zawacki
|
|
|
Harris North, foothills home.
|
Intake Approval | | | 8/9/2019 | | FAIL |
|
|
|
Please provide original building permit number the existing retaining wall was approved with prior to acceptance of the permit for building permit review. -MMJ ###-####
|
Application received | | | 8/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 6 2019 10:55AM
|