Permit NumberBLD19-02990
StatusFinaled
Name IDAC LLC
Site Address 1206 N 13TH ST
Project NameAdamson Garage
Customer Number 
ePlanReviewNo
Description
MODIFICATION - REMOVED FOOTING FROM UNDER GARAGE DOOR **jab** Permit for a detached garage. Work to include: 16"x8" footings, 24"x6" stem wall, slab on grade floor, 2x4 exterior walls, pre-engineered roof trusses with asphalt shingles - Projections on south side require 1 hour rating as they are less than 36" from adjacent structure. All work per plans, notations, local codes & ordinances. Plans indicate no electrical, plumbing, or mechanical work **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/20/20207/21/20207/21/2020APASS
DetailsTony Young
Not sure if historical got their approval done?
And i can''t find the site plans
Please call me at least 1 hour before arrival or if we need to reschedule
Thank you Phone #: ###-#### Inspection requested via web by Chris Homeyer
DOC - Permit Finaled7/21/20207/21/20207/21/2020PPASS
DetailsTony Young
Zoning Approval7/21/20207/21/20207/21/2020 DONE
DetailsTed Vanegas
BLD-Final7/20/20207/20/20207/20/2020ADEFR
DetailsJim Storey
Not sure if historical got their approval done?
And i can''t find the site plans
Please call me at least 1 hour before arrival or if we need to reschedule
Thank you Phone #: ###-#### Inspection requested via web by Chris Homeyer to 415 am 7/21
BLD-Final6/25/20206/25/20206/25/2020ANR
DetailsTony Young
Stucco finish and final Phone #: ###-#### Inspection requested via web by Chris Homeyer,, needs historical,, will also need plans and see inside
BLD-Framing/Rough-in11/4/201911/5/201911/5/2019APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Chris Homeyer// no electrical proposed at this time
BLD-Other11/1/201911/1/201911/1/2019PCANC
DetailsTony Young
If you could call or text 15 min before so I can meet you there Phone #: ###-#### Inspection requested via web by Chris Homeyer// sceduled per contractor,, 1 hour soffit
BLD-Wall cover10/31/201911/1/201911/1/2019ANR
DetailsTony Young
If you could call or text 15 min before so I can meet you there Phone #: ###-#### Inspection requested via web by Chris Homeyer// sceduled per contractor,, 1 hour soffit
BLD-Other10/30/201910/31/201910/31/2019ANR
DetailsTony Young
If you could call or text 15 min before so I can meet you there Phone #: ###-#### Inspection requested via web by Chris Homeyer// sceduled per contractor,, 1 hour soffit
BLD-Framing/Rough-in10/29/201910/30/201910/30/2019APART
DetailsTony Young
If you could call or text 15 min before so I can meet you there Phone #: ###-#### Inspection requested via web by Chris Homeyer,, needs soffit inspection,, nail of brace walls,, no plans for electrical at this time
BLD-Foundation9/10/20199/10/20199/10/2019PPART
DetailsDave Hannah
rebar ok
BLD-Foundation9/9/20199/9/20199/10/2019PCANC
DetailsDave Hannah
Rebar Inspection for stem wall Phone #: ###-#### Inspection requested via web by Chris Homeyer
BLD-Footing9/3/20199/4/20199/4/2019APASS
DetailsBrandon Shaw
Work in progress...
Routing Walk-In (BLD)8/30/20198/30/20198/30/2019ADONE
DetailsJosh Bogle
questions on approved plans
Routing - PLAN CHECK8/30/2019 8/30/2019 PASS
DetailsJosh Bogle
applicant clarified foundation intentions
Case Summary (BLD)  8/30/2019 DONE
DetailsJosh Bogle
Permit Ready to Issue  8/30/2019 DONE
CHANGE STATUS TO (ISS)  8/30/2019 DONE
BLD-Footing8/28/20198/29/20198/29/2019ANR
DetailsTony Young
plans are taped to porta John , if you want give me a 15 min heads up and I. Can Be there 208 703 6272 thanks Phone #: ###-#### Inspection requested via web by Chris Homeyer.. needs to meet back up area of 22'
BLD-Footing8/28/20198/28/20198/28/2019PFAIL
DetailsBrandon Shaw
No City approved plan or permit on site...
Routing Walk-In (BLD)8/7/20198/7/20198/7/2019APASS
DetailsMichael Hanson
Routing - PLAN CHECK8/7/2019 8/7/2019 PASS
DetailsMichael Hanson
1st review completed  8/7/2019 DONE
DetailsMichael Hanson
Plan assigned to (M_H)8/7/2019 8/7/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  8/7/2019 DONE
DetailsMichael Hanson
Inspection Record Card- Bld  8/7/2019 DONE
DetailsMichael Hanson
Case Summary (BLD)  8/7/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  8/7/2019 DONE
Issue PAID IN FULL permit  8/7/2019 DONE
Routing Walk-In (Zoning)8/6/20198/6/20198/6/2019APASS
DetailsKayCee Babb
DRH19-00294
Routing Walk-In (BLD)8/6/20198/6/20198/6/2019AFAIL
DetailsJenny Nelson
No contact with applicant
1st review completed  8/6/2019 DONE
DetailsJenny Nelson
Application received 8/6/2019