Permit Information
Permit NumberBLD19-02998
StatusFinaled
Name HOBSON FABRICATING CORP
Site Address 4788 S ORCHARD ST
Project NameValley Regional Transit Detect
Customer NumberBLD17-03210 HVAC & ELECTRICAL
ePlanReviewYes
Description
(VALLEY REGIONAL TRANSIT DISTRICT - EQUIPMENT ROOM ADDITION) Permit for a 144 sq ft addition to house equipment approved under separate permit, BLD17-03210. Refer to BLD17-03210 for Electrical, Gas Detection, & HVAC Systems. Work to include: new concrete slab, exterior metal framed walls and roof, new exterior door. There will be no hazardous material storage in the equipment room. Special inspections required for concrete anchors per the attached Form 310. This building is fully Fire Sprinklered for building area increase with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **jar**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/12/20205/12/2020 DONE
This permit finaled on the web by Amanda Farnsworth
Third Notice 4/8/20205/7/2020 DONE
mailed 5-8-2020
Second Notice 3/15/20204/3/2020 DONE
mailed 4-6-2020
First Notice2/19/20202/19/20203/5/2020 DONE
DetailsJim Storey
mailed 3-6-20
BLD-Final2/18/20202/19/20202/19/2020APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
DOC - Permit Finaled2/19/20202/19/20202/19/2020PPASS
DetailsJim Storey
BLD-Final2/14/20202/14/20202/19/2020PCANC
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
FIRE-Final Inspection2/12/20202/13/20202/13/2020APASS
DetailsTroy Cobbley
Life safety passed.

Ryan Phone #: ###-####
BLD-Final2/10/20202/10/20202/11/2020PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
BLD-Final2/7/20202/10/20202/11/2020ANR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
BLD-Final12/17/201912/18/201912/18/2019ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
BLD-Final12/16/201912/17/201912/17/2019ANR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
BLD-Other11/14/201911/15/201911/15/2019APASS
DetailsJim Storey
Rebar Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
Issue PAID IN FULL permit  10/31/2019 DONE
(F) Reprint permit  10/31/2019 DONE
Print Occupancy Form  10/31/2019 DONE
Telephone call  10/30/2019 DONE
emailed Chad Slichter, Architect asking why there was such a discrepancy between the initial value and the value submitted by the GC (emailed to me by Chad) and he said that the 306 submitted is the value the GC provided him. see docs folder
Telephone call  10/30/2019 DONE
spoke with ted (project manager) informing him we need to know who the RP will be for the esc. Informed him what would need to be done since the names provided were not in our system as taking the class before
OVERRIDE  10/25/2019  
Permit Ready to Issue  10/25/2019 DONE
met: Chris Knudson taking class on 11-6-2019 Need RP

these have been met:
ACHD
Need GC
Need Revised Value
Routing - FIRE10/15/201910/15/201910/24/2019 PASS
DetailsMark Stumbaugh
10/29 (Resub) VRT
Plan assigned to (JAR)8/22/20198/27/201910/24/2019 DONE
DetailsJulie Romig
10/16 - (5 days) - 2nd Rev - 1st Rev Comp - 502 VRT Equipment Room Addition
Plan Reviewer's activity  10/24/2019  
DetailsJulie Romig
Emailed architect - need complete Form 310
PLANS/APPL TAKEN TO FRONT DESK  10/24/2019 DONE
Routing - PLAN CHECK10/15/2019 10/24/2019 PASS
DetailsJulie Romig
Route to Impact Fee Review10/2/201910/5/201910/2/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
1st review completed  10/2/2019 FAIL
DetailsJulie Romig
Routing - PLAN CHECK8/22/2019 10/2/2019 FAIL
DetailsJulie Romig
Routing - FIRE8/22/20198/27/201910/1/2019 FAIL
DetailsMark Stumbaugh
10/02 - 502 VRT Equipment Room Addition for Hotsy Boiler
Routing Off Site - STRUCTURAL8/27/2019 9/7/2019 PASS
DetailsJulie Romig
AHJ
Routing - PLANNING8/22/2019 8/28/2019 PASS
DetailsKarla Nelson
Addition for an allowed use, meets setbacks
Routing - Addressing8/22/2019 8/28/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/22/2019 8/27/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment8/22/2019 8/27/2019 PASS
DetailsMichael Zawacki
Intake Approval  8/22/2019 PASS
DetailsBrian McGowan
Intake Approval  8/8/2019 FAIL
DetailsBrian McGowan
Please address the following for your Prescreen to be approved:
1. Structural calculations.
2. Soils and Geotech Report OR an Idaho Licensed Engineer to declare the default seismic site class and soils bearing per IBC.
3. Verification of Legal Lot or Parcel.
4. The SUEZ Site Specific Fire Flow Letter NOT your request letter for it.
5. Planning and Zoning approval letters.
6. Site Plan with the required information and dimensions.
7. ESC Waiver letter or grading and drainage plans as required.
8. Floor Plan of the building you are attaching this to.
9. Provide Energy Code Compliance since it is a new structure.
Application received  8/6/2019 DONE
Application submitted via PDS Online on Aug 6 2019 4:43PM