Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-03023
StatusFinaled
Name MOHAMMED NOOMAN
Site Address 2273 S VISTA AVE Unit: STE 160
Project NameGolden Touch Barbershop 160
Customer Number 
ePlanReviewNo
Description
(GOLDEN TOUCH BARBERSHOP - SUITE 160) Permit for a minor remodel of an existing 1,201 sq ft tenant suite previously occupied by Head Start for a new barbershop tenant. Work to include: demolition of interior non-bearing partition walls at entry vestibule; demolition of millwork; removal of existing sinks; new bathroom door; replacing existing lavatory with new hairwash sink. This building is fully Fire Sprinklered with quick response heads. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/1/201912/30/2019 DONE
mailed 1-1-20
Second Notice 11/8/201911/26/2019 DONE
mailed 12-2-19
First Notice 9/15/201910/29/2019 DONE
mailed 11-1
BLD-Final9/5/20199/5/20199/5/2019PPASS
DetailsJim Storey
Mohammed Phone #: ###-####. PLEASE BEFORE 3PM if possible has to go to work
Permanent Occupancy  9/5/2019 DONE
FIRE-Final Inspection8/27/20198/28/20198/28/2019APASS
DetailsTroy Cobbley
Life safety passed. Call half hour before to meet // Mohammed Phone #: ###-####
BLD-Conference8/23/20198/23/20198/23/2019PFAIL
DetailsJim Storey
Call for access- Mohammed Phone #: ###-####
Issue PAID IN FULL permit  8/23/2019 DONE
Route to Impact Fee Review8/21/20198/24/20198/22/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Permit Ready to Issue  8/22/2019 DONE
ALL MET
Need GC
Need rev cert of val (tenant is GC)
Need checklist signed and scanned
please make sure impact fees has signed off
Print Occupancy Form  8/22/2019 DONE
Telephone call  8/22/2019 DONE
Called the applicant to let him know that his permit is ready and that we need a GC form and a Rev Val. He informed me that he is doing the work himself. I told him that he would need a letter from the parcel owner allowing him to do the work. He said that he is aware of that and has a letter.
Plan assigned to (JAR)8/8/20198/8/20198/21/2019 DONE
DetailsJulie Romig
08/21 - L2 Golden Touch Barbershop
Routing - PLAN CHECK  8/21/2019 PASS
DetailsJulie Romig
Case Summary (BLD)  8/21/2019 DONE
1st review completed  8/21/2019 DONE
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  8/21/2019 DONE
Routing - PLUMBING8/8/2019 8/9/2019 PASS
DetailsDan Ediger
Per plans and ISPC
Routing - PUBLIC WORKS8/8/2019 8/9/2019 PASS
DetailsAngela Hardy
Routing - Addressing8/9/2019 8/9/2019 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN CHECK  8/8/2019 DONE
Recd Pcfee & Taken To Pln CK  8/8/2019 DONE
Intake Approval  8/8/2019 PASS
Application received 8/8/2019