Permit Information
Permit NumberBLD19-03032
StatusIssued
Name MARK GUHO CONSTRUCTION COMPANY
Site Address 3035 E BARBER VALLEY DR
Project NamePivot KA
Customer Number 
ePlanReviewYes
Description
(PIVOT KA) //6-18-2020 PLAN MODIFICATION TO ADUST TRASH ENCLOSURE LOCATION, ADJUST SITE CURBING AND PARKING STALL, SITE LANSCAPE ADUSTMENTS, REVISED GRADING PLAN, UTILITIES PLAN AND SITE PLAN. Jg// To construct a 10,182 sq. ft. one story commercial building for use as assembly exercise gym and related site improvements. Approval is contingent upon adhering to the approved plans on file, DRH19-00161, attached engineering and plan review report. Scope of work includes: site work, construction of concrete slab on grade and concrete foundation, stud framed exterior envelope walls with EFIS stucco and masonry veneer, pre-engineered open-web roof trusses, single roof membrane, electrical work, mechanical work and plumbing work. Note: Special inspection is required, see attached 310 form. This building will be fully Fire Sprinklered with an approved Fire Alarm system. System shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation8/12/20208/12/20208/12/2020PPART
DetailsBrandon Shaw
Pending special inspection...
BLD-Footing8/5/20208/6/20208/6/2020APART
DetailsBrandon Shaw
Pending special inspections...
CHANGE STATUS TO (ISS)  7/2/2020 DONE
OVERRIDE  6/30/2020  
Routing - FIRE6/18/20206/18/20206/30/2020 PASS
DetailsMark Stumbaugh
06/26 Plan Mod Pivot KA ePan MAS
Plan assigned to (JG)6/12/20206/12/20206/30/2020 PASS
DetailsJavier Guzman
06/26 Plan Mod Pivot KA ePan, fire
Permit Ready to Issue  6/30/2020 DONE
plan mod approved
DO NOT RE ISSUE
Routing PW Solid Waste6/22/2020 6/26/2020 PASS
DetailsEvan Carpenter
Routing - PLAN CHECK6/18/2020 6/26/2020 PASS
DetailsJavier Guzman
Routing - Design Review6/18/2020 6/24/2020 PASS
DetailsJosh Wilson
Routing PW Flood Plain6/22/2020 6/23/2020 PASS
DetailsJason C. Taylor
Project is outside Special Flood Hazard Area, no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
Routing PW Street Lights6/22/2020 6/23/2020 PASS
DetailsTom Marshall
Routing PW Sewer Design6/22/2020 6/22/2020 PASS
DetailsDeAnn Brown
Routing PW Drainage6/22/2020 6/22/2020 PASS
DetailsBrian Murphy
minor grading modifications ok
Routing - PUBLIC WORKS6/18/2020 6/22/2020 PASS
DetailsMorgan Webb
please route to whomever else in PW needs to re-review project
Plan Modification Accepted  6/12/2020 DONE
Modifications to trash enclosure
Plan Reviewer's activity  6/12/2020 DONE
DetailsJavier Guzman
Failed Prescreen
For prescreen review provide and upload the following:
• Provide a completed plan modification application, application can be found on our website at https://www.cityofboise.org/departments/planning-and-development-services/building/building-permits/commercial-construction-500/522-plan-modification/
OVERRIDE  3/5/2020  
Plan assigned to (JG)9/4/20199/4/20193/5/2020 PASS
DetailsJavier Guzman
3rd rev comp, 502 Pivot KA Barber Valley
PLANS/APPL TAKEN TO FRONT DESK  3/5/2020 DONE
Permit Ready to Issue  3/5/2020 DONE
NEED
ACHD

MET
RP
GC FORM
REVISED VALUE
Issue PAID IN FULL permit  3/5/2020 DONE
Print Occupancy Form  3/5/2020 DONE
Routing PW Sewer Design3/4/2020 3/4/2020 PASS
DetailsDeAnn Brown
Routing - PLAN CHECK1/23/2020 2/10/2020 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL1/23/2020 2/10/2020 PASS
DetailsJavier Guzman
Signed off in ePlan by Stapley engineers
Routing PW Sewer Design1/23/2020 1/31/2020 FAIL
DetailsDeAnn Brown
Revisions to the sewer design and easement document completion still needed. Coordinating directly with Rob Sunderlage and Tucker Anderson.
Routing Off Site - STRUCTURAL12/17/2019 12/30/2019 FAIL
DetailsJavier Guzman
failed in ePlan by Stapley Engineering
Routing - PLAN CHECK12/17/2019 12/30/2019 FAIL
DetailsJavier Guzman
Routing - FIRE12/17/201912/17/201912/20/2019 PASS
DetailsMark Stumbaugh
MAS Resub Pivot KA
Routing - PLUMBING12/17/2019 12/20/2019 PASS
DetailsDan Ediger
See reline note. Per ISPC and plans
Routing - MECHANICAL12/17/2019 12/18/2019 PASS
DetailsTroy James
Routing PW Sewer Design12/17/2019 12/17/2019 FAIL
DetailsDeAnn Brown
Sewer extension plans were not submitted to Boise Public Works. Make changes show in changemarks and submit updated sheets directly to DeAnn Brown.
Route to Impact Fee Review10/15/201910/18/201910/17/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  10/15/2019 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK9/4/2019 10/15/2019 FAIL
DetailsJavier Guzman
Routing - FIRE8/30/20199/4/201910/11/2019 FAIL
DetailsMark Stumbaugh
10/10 - 502 Pivot KA Barber Valley
Routing Off Site - STRUCTURAL9/4/2019 10/11/2019 FAIL
DetailsJavier Guzman
failed in ePlan by Stapley Engineering
Routing PW Drainage9/4/2019 9/13/2019 PASS
DetailsBrian Murphy
Routing - Design Review9/4/2019 9/11/2019 PASS
DetailsJosh Wilson
Ok per DRH19-00161
Routing - PLANNING9/4/2019 9/10/2019 PASS
DetailsBrent Moore
Routing PW Flood Plain9/4/2019 9/9/2019 PASS
DetailsJason C. Taylor
Approved LOMR 13-10-1085A on File. No floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
Routing - PLUMBING9/4/2019 9/6/2019 PASS
DetailsDan Ediger
See Redline notes.
Per plans and ISPC
Routing PW Environmental9/4/2019 9/6/2019 PASS
DetailsRick Christenson
Routing - Addressing9/4/2019 9/6/2019 PASS
DetailsDoug Chausow
BUILDING ADDRESS: 3083 E Barber Valley Rd
Routing - PUBLIC WORKS9/4/2019 9/6/2019 PASS
DetailsAngela Hardy
Routing PW Street Lights9/4/2019 9/5/2019 PASS
DetailsTom Marshall
Routing PW Sewer Design9/4/2019 9/5/2019 FAIL
DetailsDeAnn Brown
Sewer extension plans have not been submitted to Boise Public Works for review and approval. Coordinate review with DeAnn Brown.
Routing - MECHANICAL9/4/2019 9/5/2019 FAIL
DetailsTroy James
See eplan. Emailed corrections to Tucker with Babcock design.
Routing PW Solid Waste9/4/2019 9/5/2019 PASS
DetailsEvan Carpenter
Routing - Erosion and Sediment9/4/2019 9/4/2019 PASS
DetailsMichael Zawacki
RP needed. Site is in area with high water table, dewatering may be needed.
Site prep inspection required.
Some errors in location on swppp, please correct for on site binder.
Intake Approval  8/30/2019 PASS
DetailsBrian Murphy
Intake Approval  8/28/2019 FAIL
DetailsBrian McGowan
The required Recorded Document must be provided prior to accepting the Prescreen.
Intake Approval  8/22/2019  
DetailsBrian McGowan
Please address or provide the following information for your Prescreen to be approved:

1. No Sheet E101 was provided for the Street Lights.
2. I could not find the Fire Hydrant locations on CS101.
3. Appendix J needs to be signed by a City Official.
4. I could not locate the Drainage Sytems O and M Plan
5. No Sheet G101 was uploaded.
6. No Sheet E103 was uploaded.
7. No Sheet E502 was uploaded.
8. No Sheet E301 was uploaded.
9. No Sheets E201, E501, E401, E100, E 601, E602 were uploaded.
Application received  8/8/2019 DONE
Application submitted via PDS Online on Aug 8 2019 1:57PM