First Notice | 11/25/2019 | 11/25/2019 | 12/30/2019 | | DONE |
Mike Jordan
|
|
|
mailed 1-1-20
|
BLD-Final | 11/22/2019 | 11/25/2019 | 11/25/2019 | P | PASS |
Mike Jordan
|
|
|
Call for access- Lyold Phone #: ###-####
|
DOC - Permit Finaled | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PASS |
Mike Jordan
|
|
|
Sticker placed aboved door and rear door hardware has been changed out to single action lever type.
|
FIRE-Final Inspection | 11/22/2019 | 11/25/2019 | 11/25/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Call for access- Lyold Phone #: ###-####
|
Inspection Record Card- Bld | | | 11/4/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/4/2019 | | DONE |
|
|
|
|
Routing - FIRE | 11/1/2019 | 11/1/2019 | 11/1/2019 | | PASS |
Erika Akin
|
|
|
Permit changed to a vanilla; no occupancy without future TI. Prior review by MS not applicable. PDS Fire Inspector to verify basic life safety for tenant space.
|
Plan assigned to (JG) | 8/15/2019 | 8/15/2019 | 11/1/2019 | | PASS |
Javier Guzman
|
|
|
2nd rev, 08/21 L1 DISASTER KLEENUP ePlan, pend fire
|
Plan Reviewer's activity | | | 11/1/2019 | | DONE |
Javier Guzman
|
|
|
Project changed to a vanilla (No occupancy allowed under this permit. future tenant shall apply for certificate of occupancy prior to occupying the space.)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/1/2019 | | DONE |
|
|
|
ALL MET
Need GC
Need Revised Value
|
Routing - PLAN CHECK | 11/1/2019 | | 11/1/2019 | | PASS |
Javier Guzman
|
|
|
|
Route to Impact Fee Review | 8/23/2019 | 8/26/2019 | 8/23/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 8/23/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 8/15/2019 | 8/15/2019 | 8/22/2019 | | FAIL |
Mark Scharfen
|
|
|
08/22 L1 DISASTER KLEENUP review complete. Uploaded and emailed to architect rev_fire 08.22.2019.pdf
|
Routing - PLAN CHECK | 8/15/2019 | | 8/21/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 8/15/2019 | | 8/20/2019 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 8/15/2019 | | 8/16/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING
|
Intake Approval | | | 8/15/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 8/13/2019 | | FAIL |
Brian McGowan
|
|
|
Please address the following items in order for your Prescreen to be approved.
1. Provide a wall section showing how the ceiling is providing the required energy compliance in "Open to Structure" ceiling area, and at the acoustical panel area or gypsum board ceiling area where the walls have been removed. A section/detail may be needed.
2. How is the separation between tenant spaces being dealt with at Open to Structure areas.
|
Intake Approval | | | 8/9/2019 | | FAIL |
Brian McGowan
|
|
|
Please address the following items in order for your Prescreen to be approved.
1. What type of damage was done? Photographs are required for damage repair permits.
2. Please provide ceiling notes/details. (walls being removed, how is the ceiling being repaired)
3. Note 27 is called out at several doorway openings.
|
Application received | | | 8/8/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 8 2019 3:41PM
|