Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-03042
StatusIssued
Name BARROW DESIGN & CONSTRUCTION LLC
Site Address 1105 N LIBERTY ST
Project NameLiberty Lake Clubhouse
Customer Number 
ePlanReviewYes
Description
(LIBERTY LAKE CLUBHOUSE) **This building has a fire alarm system FIR01-00205** Permit is to remodel an existing 4,297 sq. ft. clubhouse assembly building and a new 118 sq. ft. entry foyer addition. Approval is contingent upon adhering to the approved plans on file, plan review report and attached engineering. Work to include: removal of select exterior concrete sidewalk, removal of exterior column furring, removal of select exterior walls, removal of select exterior and interior door/doorframe, removal of select exterior and interior windows, removal of exterior brick wainscot and select vinyl finishes, removal of select interior nonbearing walls, removal of select millwork, removal of select floor finish, removal of select exterior and interior ceiling, construction of interior non-bearing walls to create, select new interior concrete slab and exterior concrete sidewalk, select new concrete footing, framing, select new column furring, select new exterior doors and windows, new exterior stone and stucco finish, select new interior wall infill, select new millwork, select new gypsum ceiling, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. Note: Special inspection required, see 310 form attached. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/7/20208/10/20208/10/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by robert barrow
BLD-Conference7/31/20208/3/20208/3/2020PDONE
DetailsMike Jordan
Bob *screened* Phone #: ###-####
BLD-Footing6/30/20207/1/20207/1/2020APEND
DetailsMike Jordan
bob Phone #: ###-####. Engineer to sign off on epoxy, no special inspection. Aslo need RFI for column pad footings and aditional letter from engineer waiving special inspection on concrete.
Plan Reviewer's activity  6/10/2020 DONE
DetailsJoe Bruce
Spoke with Bob Barrow regarding the installation of visqueen plastic over exsiting smoke detectors during construction. Since building will not be occupied during construction this is okay per 2015 IFC 901.7. **JHB**
Issue PAID IN FULL permit  4/22/2020 DONE
Print Occupancy Form  4/22/2020 DONE
Telephone call  3/25/2020 DONE
email fees to barrowdc@ymail.com
Meeting  3/24/2020 DONE
Met- printed fees and emailed//cannot print fees to send to GC will try later today-
Telephone call  2/6/2020 DONE
email forward to Joe for extension request see DOC_Email
Extend Review Timeline  2/6/2020 DONE
1st approved 180 day extension per joe. see documents
Meeting  2/5/2020 DONE
sent email to Jon, justin and joe, informing permit will expire at 5 today 2/5/2020 and may send in an extension request or let me know if the project is no longer going to be done
Telephone call  2/5/2020 DONE
extension requestion sent in by justin padleski
Plan assigned to (JG)8/20/20198/20/201910/16/2019 PASS
DetailsJavier Guzman
2nd rev L3 Liberty Lake Clubhouse ePlan, pend eng
Routing Off Site - STRUCTURAL10/9/2019 10/16/2019 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers
PLANS/APPL TAKEN TO FRONT DESK  10/16/2019 DONE
Permit Ready to Issue  10/16/2019 DONE
All met- Need GC
Need Rev Val
Routing - PLAN CHECK10/9/2019 10/11/2019 PASS
DetailsJavier Guzman
Route to Impact Fee Review9/19/20199/22/20199/20/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE8/20/20198/20/20199/19/2019 PASS
DetailsMark Scharfen
Attached comments to case
1st review completed  9/19/2019 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK8/20/2019 9/16/2019 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL8/20/2019 9/14/2019 FAIL
DetailsJavier Guzman
Failed in ePlan by AHJ Engineers
Routing - PUBLIC WORKS8/20/2019 8/21/2019 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment8/20/2019 8/21/2019 PASS
DetailsMichael Zawacki
TI, no ESC needed
Routing - PLANNING8/20/2019 8/20/2019 PASS
DetailsDavid Moser
see DRH19-00273
Routing - Addressing8/20/2019 8/20/2019 PASS
DetailsDoug Chausow
Routing - Design Review8/20/2019 8/20/2019 PASS
DetailsKatelyn Menuge
DRH19-00273
Intake Approval  8/16/2019 PASS
Intake Approval  8/14/2019 FAIL
DetailsBrian McGowan
Please address the following items in order to process your prescreen:
1. Provide a completed Form #310 for Special Inspections.
2. Sheets A101.1, A101.2, A601 and ID100 do not provide the required stamping space in the lwer right hand corner for the City of Boise Approval Stamp. Please revise the sheet layout.
Application received  8/9/2019 DONE
Application submitted via PDS Online on Aug 9 2019 9:55AM