BLD-Energy code compliance | 8/7/2020 | 8/10/2020 | 8/10/2020 | A | PASS |
Brandon Shaw
|
|
|
late morning- Dave *screened* Phone #: ###-####
|
BLD-Framing/Rough-in | 8/6/2020 | 8/7/2020 | 8/7/2020 | P | PASS |
Tell Riley
|
|
|
Dave - */Screened*/ Phone #: ###-####//ok to insulate//
|
BLD-Framing/Rough-in | 8/5/2020 | 8/6/2020 | 8/6/2020 | P | FAIL |
Tell Riley
|
|
|
Dave - */Screened*/ Phone #: ###-####//need to add nails to hangers//see truss docs for 2 ply girder nailing//CN posted//permit details show required plumbing and mechanical permits, they have not been issued or inspected//
|
BLD-Foundation | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | PART |
Tell Riley
|
|
|
rebar // Dave ...... screened Phone #: ###-####//WIP//pend all special inspections//
|
BLD-Footing | 6/23/2020 | 6/24/2020 | 6/24/2020 | A | PART |
Tell Riley
|
|
|
Screened // as late as possible .....Dave Phone #: ###-####//contractor stated building was marked in place prior to demo, new building is lined based on those markings//appears to meet the site plan, in line with drawings for existing water piping and plumbing//footings per plans//pending all special inspections that are required//
|
CHANGE STATUS TO (ISS) | | | 5/7/2020 | | DONE |
|
|
|
plan mod done
|
OVERRIDE | | | 5/5/2020 | | |
|
|
|
|
Plan assigned to (M_H) | 4/22/2020 | | 5/5/2020 | | DONE |
Michael Hanson
|
|
|
05/05 plan mod - well house
|
Routing - PLAN CHECK | 5/5/2020 | | 5/5/2020 | | PASS |
Michael Hanson
|
|
|
PLAN MOD REVIEW FEE = 1 HOUR
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2020 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 5/5/2020 | | DONE |
|
|
|
Plan mod approved
met emailed gc Michael Albarran
Need
Revised Value (522 app states its changed due to the plan mod)
|
Plan Modification Accepted | | | 4/22/2020 | | DONE |
|
|
|
plan mod request per MIchael Albarran from MCClendon Engineering. Demolish all foundation, slab, all walls, and complete roof. Construction new foundation, slab, walls, and roof. Sheets: A 1.0, A 1.1, A2.0, 81.0, 82.0, 83.0, 84.0, 84.1
|
Issue PAID IN FULL permit | | | 4/8/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/8/2020 | | DONE |
|
|
|
|
Telephone call | | | 4/8/2020 | | DONE |
|
|
|
eplan needs to be release
|
Extend Review Timeline | | | 2/6/2020 | | DONE |
|
|
|
1st approved 180 day extension per joe. see doucments
|
Meeting | | | 2/5/2020 | | DONE |
|
|
|
sent email to will and roger that permit will expire today 2/5/2020 and may send in a request for an extension or to let me know if the project is no longer going to be done
|
Telephone call | | | 2/5/2020 | | DONE |
|
|
|
extension request sent in by ron manning
|
OVERRIDE | | | 1/14/2020 | | |
|
|
|
|
Routing - Design Review | 1/14/2020 | | 1/14/2020 | | PASS |
KayCee Babb
|
|
|
Per DRH19-00386
|
Permit Ready to Issue | | | 1/14/2020 | | DONE |
|
|
|
ALL MET- iccitravis@gmail.com
Need
GC Form
Revised Cert of Value (put in value but no fees, see Tisha)
MET
RP JCA
|
Plan assigned to (M_H) | 9/18/2019 | | 1/14/2020 | | DONE |
Michael Hanson
|
|
|
1st review completed - 10/21 #502 L3 ePlan - Suez well house addition
|
Plan Reviewer's activity | | | 1/3/2020 | | DONE |
Michael Hanson
|
|
|
Emailed for project status
|
Plan Reviewer's activity | | | 12/4/2019 | | DONE |
Michael Hanson
|
|
|
Emailed for project status - no response
|
Route to Impact Fee Review | 10/22/2019 | 10/25/2019 | 10/23/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 9/10/2019 | 9/18/2019 | 10/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
10/21 - 502 Suez Artic Well & Fairview Booster Well House Addition
|
1st review completed | | | 10/22/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing Off Site - STRUCTURAL | 9/18/2019 | | 10/18/2019 | | PASS |
Michael Hanson
|
|
|
Approval per ePlan C. Holliday @ AHJ
|
Routing - PLAN CHECK | 9/18/2019 | | 10/18/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing - MECHANICAL | 9/18/2019 | | 9/26/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 9/19/2019 | | 9/23/2019 | | CANC |
Melissa Jannusch
|
|
|
No Hillside review required
|
Routing - PLANNING | 9/18/2019 | | 9/21/2019 | | PASS |
David Moser
|
|
|
See DRH19-00386
|
Routing PW Drainage | 9/19/2019 | | 9/19/2019 | | PASS |
Brian Murphy
|
|
|
LESS THAN 500SQ FT
|
Routing PW Sewer Design | 9/19/2019 | | 9/19/2019 | | PASS |
DeAnn Brown
|
|
|
No sewer facilities
|
Routing - Design Review | 9/18/2019 | | 9/19/2019 | | FAIL |
KayCee Babb
|
|
|
Comply with all conditions of approval of DRH19-00386, including the provision of a cross-access agreement.
|
Routing - PUBLIC WORKS | 9/18/2019 | | 9/19/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 9/18/2019 | | 9/18/2019 | | PASS |
Michael Zawacki
|
|
|
Waiver approved
|
Routing - Addressing | 9/18/2019 | | 9/18/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLUMBING | 9/18/2019 | | 9/18/2019 | | PASS |
Daryl Spivey
|
|
|
|
Intake Approval | | | 9/10/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 8/30/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following for prescreen:
Previous request for uploading a completed 502 checklist, Planning approval letter/s and any additional items requested from the 502 checklist not addressed. (checklist can be found at https://www.cityofboise.org/media/7772/502-new-commercial-building-additions-submittal-checklist_fillable-8-6-19.pdf )
This structure is located in a design review zone. Provide the appropriate planning approvals.
Provide a completed 502 checklist wit all required documents.
|
Intake Approval | | | 8/30/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following per checklist:
• Because this is within the hillside area contact Melissa Jannusch at ###-#### to see if the following Geotech is required: (if not required provide the email transcript conversation that states not required) Provide a Soils and Geotech Report For support of the structure stamped and signed by an Idaho licensed engineer
• Provide DR/Planning & Zoning letters of approval.
• Provide a code Analysis/Building Data on front sheet of plans which includes: Code year, occupancy group(s), construction type(s), floor areas for all floors & building total floor area, building height, fire suppression system if any (specify NFPA code applicable), fire alarm or smoke control system
|
Intake Approval | | | 8/28/2019 | | FAIL |
Carl D Madsen
|
|
|
This structure is located in a design review zone. Provide the appropriate planning approvals.
Provide a completed 502 checklist wit all required documents.
|
Application received | | | 8/9/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 9 2019 1:04PM
|