BLD-Final | 4/20/2020 | 4/21/2020 | 4/21/2020 | A | PASS |
Tony Young
|
|
|
Garage key code 3283 Phone #: ###-#### Inspection requested via web by David Wipper
|
DOC - Permit Finaled | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Blower Door Test Results | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | DONE |
Tony Young
|
|
|
Garage key code 3283 Phone #: ###-#### Inspection requested via web by David Wipper// 3,7
|
PubWorks Occupancy Approval | 4/14/2020 | 4/14/2020 | 4/14/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage (including roof drainage connection to the subdivision system and stabilization) is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 4/9/2020 | 4/10/2020 | 4/10/2020 | P | NR |
Tony Young
|
|
|
Garage key code 3283 Phone #: ###-#### Inspection requested via web by David Wipper// needs hillside pass,, needs letter of ok for cable rail
|
BLD-Final | 4/9/2020 | 4/10/2020 | 4/9/2020 | A | CANC |
Tony Young
|
|
|
garage key code 3283 Phone #: ###-#### >> Inspection requested via web by David Wipper Inspection cancelled from web by: David Wipper
|
BLD-Wall cover | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Mike Jordan
|
|
|
Larry - soffit inspection Phone #: ###-####
|
BLD-Other | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | PART |
Mike Jordan
|
|
|
sofit // Larry Phone #: ###-####. Work in progress. needs to call again when almost completed.
|
BLD-Energy code compliance | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | PASS |
Mike Jordan
|
|
|
Larry Phone #: ###-####. Ok to cover downstairs.
|
BLD-Framing/Rough-in | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Tony Young
|
|
|
Larry Phone #: ###-####// frame made ok// ok to insulate
|
BLD-Framing/Rough-in | 1/17/2020 | 1/17/2020 | 1/17/2020 | P | PART |
Tony Young
|
|
|
Larry Phone #: ###-####,, ok to insulate after doing fixes in the basement areas,, ok to cover upstairs,, upstairs insulation ok
|
BLD-Framing/Rough-in | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | PART |
Tony Young
|
|
|
Larry Phone #: ###-####// c/n posted
|
BLD-Wall Bracing | 12/20/2019 | 12/23/2019 | 12/23/2019 | A | PASS |
Tony Young
|
|
|
Larry Phone #: ###-####,, exterior ok after adding minor nailing and finishing straps
|
Routing - MECHANICAL | 12/23/2019 | | 12/23/2019 | | PASS |
Troy James
|
|
|
New manual j report
|
BLD-Foundation | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | PART |
Tony Young
|
|
|
Victor Phone #: ###-####.. work in progress,, ok
|
BLD-Footing | 11/4/2019 | 11/5/2019 | 11/5/2019 | A | PASS |
Tony Young
|
|
|
Victor Phone #: ###-####,, upper area ok,, work in progress,, will drill into existing
|
PubWorks Subgrade Approval | 11/4/2019 | 11/4/2019 | 11/4/2019 | | DONE |
Melissa Jannusch
|
|
|
*UPPER HALF & DECK*
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 10/15/2019 | 10/16/2019 | 10/16/2019 | A | PART |
Mike Jordan
|
|
|
wall // Victor Phone #: ###-####
|
BLD-Footing | 10/9/2019 | 10/10/2019 | 10/10/2019 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by David Wipper basement ok
|
PubWorks Subgrade Approval | 10/1/2019 | 10/1/2019 | 10/1/2019 | | DONE |
Melissa Jannusch
|
|
|
*LOWER LEVEL ONLY* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 9/13/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 8/16/2019 | 8/16/2019 | 9/13/2019 | | DONE |
Jenny Nelson
|
|
|
09/03 sfd L2 ePlan. 1st complete 08/19, need more info soffit detail, waiting for addressing and hillside
|
Inspection Record Card- Bld | | | 9/13/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/13/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 9/13/2019 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 9/13/2019 | | 9/13/2019 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 8/23/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 8/16/2019 | | 8/23/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - Addressing | 8/16/2019 | | 8/20/2019 | | PASS |
Laura Hunter
|
|
|
|
Route to Impact Fee Review | 8/16/2019 | 8/19/2019 | 8/19/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLAN CHECK | 8/16/2019 | | 8/19/2019 | | FAIL |
Jenny Nelson
|
|
|
Soffit detail
|
Routing - MECHANICAL | 8/16/2019 | | 8/19/2019 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 8/16/2019 | 8/16/2019 | 8/16/2019 | | PASS |
Lee G Meredith
|
|
|
No sprinklers required.
|
Routing - PLANNING | 8/16/2019 | | 8/16/2019 | | PASS |
Sue Cummings
|
|
|
"Reduce the driveway width in front 20ft. setback then widen it beyond that.
|
Routing - PUBLIC WORKS | 8/16/2019 | | 8/16/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 8/16/2019 | | 8/16/2019 | | PASS |
Michael Zawacki
|
|
|
Site prep inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 8/16/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/16/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/16/2019 | | DONE |
|
|
|
|
Application received | | | 8/13/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 13 2019 8:59AM
|