BLD-Energy code compliance | 7/13/2020 | 7/14/2020 | 7/14/2020 | A | DONE |
Tony Young
|
|
|
Insulation Inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
BLD-Framing/Rough-in | 6/16/2020 | 6/19/2020 | 6/19/2020 | A | PASS |
Dave Hannah
|
|
|
Framing Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
Routing - MECHANICAL | 6/10/2020 | | 6/10/2020 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Framing/Rough-in | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | PASS |
Brandon Shaw
|
|
|
Soffit inspection
|
BLD-Wall Bracing | 4/24/2020 | 4/24/2020 | 4/24/2020 | P | PASS |
Tony Young
|
|
|
shear inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk// exterior ok
|
BLD-Foundation | 1/28/2020 | 1/28/2020 | 1/28/2020 | P | PASS |
Dave Hannah
|
|
|
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | PASS |
Tony Young
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Conference | 1/15/2020 | 1/16/2020 | 1/16/2020 | P | PART |
Tony Young
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro,, ok after adding rebar,, recieved the ok on soils now
|
PubWorks Subgrade Approval | 1/16/2020 | 1/16/2020 | 1/16/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Telephone call | | | 12/30/2019 | | DONE |
|
|
|
emailed Conner Construction to let them know that they must pay all of the fees due before we can issue the permit.
|
Issue PAID IN FULL permit | | | 12/30/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/30/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/27/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 8/20/2019 | 8/20/2019 | 9/27/2019 | | DONE |
Rob Patrick
|
|
|
09/06 sfd L2 ePlan...09/04 Failed...Good to go after FIre and Grading Review
|
Routing - PLAN CHECK | 9/27/2019 | | 9/27/2019 | | FAIL |
Rob Patrick
|
|
|
Failed for Fire comments
|
Routing - PLAN CHECK | 9/27/2019 | | 9/27/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 9/27/2019 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 9/25/2019 | | 9/25/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Plan Reviewer's activity | | | 9/24/2019 | | |
|
|
|
Spoke with Melissa and she has routed this to Morgan.
|
1st review completed | | | 9/4/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLAN CHECK | 8/20/2019 | | 9/4/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing PW Grading-Hillside | 8/22/2019 | | 8/27/2019 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Routing - PUBLIC WORKS | 8/20/2019 | | 8/22/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - FIRE | | | 8/22/2019 | | PASS |
Lee G Meredith
|
|
|
08/30-1136 E Highland View Dr. LGM
Fire Sprinklers required.
9-20-19 Resubmittal did not include sprinklers and design has not changed in a way that eliminates the need for sprinklers.
9-27-19 Informed by Ron Johnson that elevated deck area over non usable space is not to be included in total fire area calculation. Fire area reduced to under 6200 sf. This elliminates the need for fire sprinklers.
|
Route to Impact Fee Review | 8/20/2019 | 8/23/2019 | 8/21/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 8/20/2019 | | 8/21/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 8/20/2019 | | 8/21/2019 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 8/20/2019 | | 8/20/2019 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/20/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/20/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/20/2019 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 8/20/2019 | | 8/20/2019 | | PASS |
Michael Zawacki
|
|
|
Site RP is development RP
|
Intake Approval | | | 8/16/2019 | | FAIL |
|
|
|
FAIL PER MELISSA. MAY HAVE TO DO A SECOND REVIEW PER MELISSA'S COMMENT (HAD ALL WE NEEDED). QUESTIONS ASK BRITTANY
CAT II Hillside permit. Old plans are uploaded with this application please upload the updated drawings that were approved under CFH19-00049. Once the correct grading and drainage plans are uploaded the permit can be accepted for building permit review MMJ ###-####
|
Application received | | | 8/13/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 13 2019 2:30PM
|