BLD-Final | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Brandon Shaw
|
|
|
Call for access // Jeff Phone #: ###-####
|
DOC - Permit Finaled | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | FAIL |
Brandon Shaw
|
|
|
Per R310.1- Sill height to be no more than 44" above the finished floor... Down stairs bedrooms...
|
BLD-Blower Door Test Results | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.96
|
BLD-Energy code compliance | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Brandon Shaw
|
|
|
Jeff Phone #: ###-####336
|
BLD-Framing/Rough-in | 10/31/2019 | 11/1/2019 | 11/1/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
Routing - MECHANICAL | 10/25/2019 | | 10/25/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PART |
Brandon Shaw
|
|
|
Floor to floor straps to be installed before framing rough-in...
|
BLD-Foundation | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 9/9/2019 | 9/10/2019 | 9/10/2019 | A | PASS |
Brandon Shaw
|
|
|
bILL Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/29/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/29/2019 | | DONE |
|
|
|
|
Telephone call | | | 8/29/2019 | | |
|
|
|
MET- Jeff called in to give RCE and asked to Reprinted permit and re-send to be signed to- sagevalleybldrs@gmail.com
|
(F) Reprint permit | | | 8/29/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/29/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 8/28/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 8/15/2019 | 8/15/2019 | 8/28/2019 | | DONE |
Rob Patrick
|
|
|
08/28 sfd L1 ePlan
|
1st review completed | | | 8/28/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 8/28/2019 | | DONE |
|
|
|
All met- Jeff called and provided the RCE and was verified on the state web site and added to our system
Need GC
|
Routing - PLANNING | 8/15/2019 | | 8/20/2019 | | PASS |
Jeff Lowe
|
|
|
|
Routing - PUBLIC WORKS | 8/15/2019 | | 8/19/2019 | | PASS |
Angela Hardy
|
|
|
|
Route to Impact Fee Review | 8/15/2019 | 8/18/2019 | 8/16/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 8/15/2019 | | 8/16/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 8/15/2019 | | 8/15/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/15/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/15/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/15/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/14/2019 | | FAIL |
|
|
|
drawings need to be uploaded individually and docs in docs and drawings in drawings folders
|
Application received | | | 8/13/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 13 2019 5:56PM
|
Routing - PLAN CHECK | 8/15/2019 | | | | PASS |
Rob Patrick
|
|
|
emailed sagevalleybldrs@gmail.com to sign permit
|