Routing - MECHANICAL | 12/10/2019 | | 12/11/2019 | | PASS |
Troy James
|
|
|
plan mod - manual J
|
Telephone call | | | 12/11/2019 | | DONE |
|
|
|
accidentally added plan mod - manual J to this project. Should have been BLD19-03841
|
Plan Modification Accepted | | | 12/10/2019 | | DONE |
|
|
|
plan mod - manual J submitted by Benny Arreola of AB Heating and Cooling
|
OVERRIDE | | | 10/1/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 9/16/2019 | 9/16/2019 | 10/1/2019 | | PASS |
Josh Bogle
|
|
|
09/20 addition, paper - 1st done
|
CHANGE STATUS TO (ISS) | | | 10/1/2019 | | |
|
|
|
per josh b "had to add some language to tie it to another permit. please move to issue status"
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/1/2019 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/30/2019 | | DONE |
Josh Bogle
|
|
|
added new permit # to description
|
BLD-Foundation | 9/15/2019 | 9/16/2019 | 9/16/2019 | P | PART |
Tell Riley
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell //wall partialy set//WIP//
|
Routing Walk-In (BLD) | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | FAIL |
Josh Bogle
|
|
|
braced walls not code compliant
|
Routing Walk-In (Zoning) | 9/16/2019 | 9/16/2019 | 9/16/2019 | A | PASS |
Ethan Mansfield
|
|
|
plan mod - NO ADU ALLOWED WITH THIS PERMIT. Must pave or other hard surface for driveway access off of alley for two-car garage.
|
Plan Modification Accepted | | | 9/16/2019 | | DONE |
|
|
|
Submitting for the whole garage
|
BLD-Footing | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PART |
Tell Riley
|
|
|
Dion Phone #: ###-####//need to add rebar on north side per engineering detail// west setback--pier footings will not meet 5 foot setbacks per zoning///ok to pour areas not in conflict with setbacks//
|
BLD-Footing | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | FAIL |
Tell Riley
|
|
|
Setbacks will need to be approved by zoning--plans show 8 foot eastside setback measures roughly 6 foot 4 inches//please establish west propert line to verify setbacks//rebar will need to be installed and tied per engineering//call for re-inspection//
|
Routing Walk-In (BLD) | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Josh Bogle
|
|
|
|
BLD-Footing | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | DEFR |
Mike Jordan
|
|
|
Dion Phone #: ###-####
|
Permit Ready to Issue | | | 9/11/2019 | | DONE |
|
|
|
need RP
|
Telephone call | | | 9/11/2019 | | DONE |
|
|
|
called Brad to let know foundation only permit is ready and that we need the RP
|
Issue PAID IN FULL permit | | | 9/11/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/10/2019 | 9/10/2019 | 9/10/2019 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 8/14/2019 | 8/14/2019 | 9/10/2019 | | PASS |
Josh Bogle
|
|
|
08/20 addition, paper - 1st done
|
Routing - MECHANICAL | 9/10/2019 | | 9/10/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 9/10/2019 | | 9/10/2019 | | PASS |
Josh Bogle
|
|
|
Foundation Only permit, at owner's risk
|
Inspection Record Card- Bld | | | 9/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/10/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Routing Walk-In (BLD) | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | FAIL |
Jenny Nelson
|
|
|
Took plans and engineering in as resubmittals for JAB as he has done a couple reviews already.
|
Routing Walk-In (BLD) | 8/27/2019 | 8/27/2019 | 8/27/2019 | A | FAIL |
Josh Bogle
|
|
|
see a-mail to Sara et al
|
Plan resubmittals received | | | 8/26/2019 | | DONE |
|
|
|
footings on foundation plan, shear wall info, code compliance corrected, 1 hr wall.
|
Routing - PLAN CHECK | 8/16/2019 | | 8/19/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 8/19/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 8/14/2019 | | 8/16/2019 | | FAIL |
Troy James
|
|
|
Emailed corrections to building energy
|
Routing Walk-In (Zoning) | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Jeff Lowe
|
|
|
ADU under separate permit, not approved with this permit
|
Routing Walk-In (BLD) | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Josh Bogle
|
|
|
accepted as a level 2 and routed
|
Application received | | 8/14/2019 | | | |
|
|
|
|