BLD-Energy code compliance | 7/14/2020 | 7/15/2020 | 7/15/2020 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clive Culpan
|
BLD-Framing/Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 | P | PASS |
Tony Young
|
|
|
Clye *screened* Phone #: ###-####// wall bracing ok also,, straps added,, ok to insulate
|
BLD-Wall Bracing | 6/10/2020 | 6/11/2020 | 6/11/2020 | A | PEND |
Tony Young
|
|
|
Wade; Phone #: ###-####// waiting on letter of ok from engineer on deleting the straps
|
BLD-Wall Bracing | 6/10/2020 | 6/10/2020 | 6/10/2020 | P | NR |
Tony Young
|
|
|
Wade; Phone #: ###-####
|
BLD-Wall Bracing | 6/8/2020 | 6/9/2020 | 6/9/2020 | A | NR |
Tony Young
|
|
|
Wade Phone #: ###-####// need to nail/ strap per plan
|
BLD-Foundation | 4/7/2020 | 4/7/2020 | 4/7/2020 | P | PART |
Tony Young
|
|
|
Chris; Phone #: ###-####,, work in progress,, ok
|
BLD-Footing | 4/3/2020 | 4/3/2020 | 4/3/2020 | P | PART |
Tony Young
|
|
|
cleared - crawlspace and garage // Chris Phone #: ###-####,, work in progress,, ok
|
PubWorks Subgrade Approval | 4/3/2020 | 4/3/2020 | 4/3/2020 | | DONE |
Melissa Jannusch
|
|
|
Crawlspace level fnds. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
CHANGE STATUS TO (ISS) | | | 4/2/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 3/31/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 3/31/2020 | | DONE |
|
|
|
DO NOT ISSUE- plan mod approved
|
Plan assigned to (J_N) | 3/18/2020 | 3/18/2020 | 3/30/2020 | | DONE |
Jenny Nelson
|
|
|
03/27 plan mod
|
Routing - PLAN CHECK | 3/23/2020 | | 3/30/2020 | | PASS |
Jenny Nelson
|
|
|
plan mod
|
Routing PW Grading-Hillside | 3/30/2020 | | 3/30/2020 | | CANC |
Melissa Jannusch
|
|
|
No changes to grading and drainge. If changes to grading and drainage are planned an updated grading and drainge plan will need to be submitted.
|
BLD-Foundation | 3/20/2020 | 3/23/2020 | 3/23/2020 | A | PART |
Tell Riley
|
|
|
Chris Phone #: ###-#### or ###-####//basement area walls only--footings already poured//not part of the plan mod//
|
Plan Modification Accepted | | | 3/18/2020 | | DONE |
|
|
|
changes to foundation and framing
|
BLD-Footing | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Footing | 3/11/2020 | 3/12/2020 | 3/12/2020 | A | NR |
Mike Jordan
|
|
|
Chris Phone #: ###-####. Needs geo tech report submitted and approved.
|
PubWorks Subgrade Approval | 3/12/2020 | 3/12/2020 | 3/12/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 2/25/2020 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/25/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/25/2020 | | DONE |
|
|
|
plan mod approved- DO NOT RE ISSUE
|
Plan assigned to (J_N) | 2/12/2020 | 2/12/2020 | 2/24/2020 | | DONE |
Jenny Nelson
|
|
|
Plan Modification to Footings and Foundation
|
Routing - Erosion and Sediment | 2/13/2020 | | 2/24/2020 | | PASS |
Michael Zawacki
|
|
|
|
Routing PW Grading-Hillside | 2/13/2020 | | 2/21/2020 | | PASS |
Melissa Jannusch
|
|
|
plan mod approved
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLANNING | 2/13/2020 | | 2/14/2020 | | PASS |
Karla Nelson
|
|
|
Passed per CFH19-00072
|
Routing - PUBLIC WORKS | 2/13/2020 | | 2/13/2020 | | PASS |
Candy A. Nichols
|
|
|
plan mod
|
Routing - PLAN CHECK | 2/13/2020 | | 2/13/2020 | | PASS |
Jenny Nelson
|
|
|
|
Plan Modification Accepted | | | 2/12/2020 | | DONE |
Jenny Nelson
|
|
|
Clive from Culpan and Co. Submitting for plan modifications for Foundation and Footing sizes
|
Issue PAID IN FULL permit | | | 1/23/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 12/19/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 9/25/2019 | 9/25/2019 | 12/19/2019 | | DONE |
Jenny Nelson
|
|
|
10/14 sfd L2 ePlan. 1st complete, specify exteior finishes, deck beams and joists, bedroom windows. Failed hillside
|
Routing - PLAN CHECK | 12/19/2019 | | 12/19/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 12/19/2019 | | DONE |
|
|
|
met
|
Routing PW Grading-Hillside | 11/20/2019 | | 11/27/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLAN CHECK | 11/20/2019 | | 11/22/2019 | | FAIL |
Jenny Nelson
|
|
|
Need plans uploaded correctly
|
Meeting | | | 10/29/2019 | | DONE |
|
|
|
The applicant/contractor contact asked for a different person to be the new point of contact on the permits. Clive has been added.
|
Routing - PLAN CHECK | 9/25/2019 | | 10/15/2019 | | FAIL |
Jenny Nelson
|
|
|
|
1st review completed | | | 10/15/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 9/25/2019 | | 10/9/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 9/25/2019 | | 10/3/2019 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Routing - Addressing | 9/25/2019 | | 9/27/2019 | | PASS |
Doug Chausow
|
|
|
|
Route to Impact Fee Review | 9/25/2019 | 9/28/2019 | 9/26/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 9/25/2019 | 9/25/2019 | 9/26/2019 | | PASS |
Lee G Meredith
|
|
|
Sprinklers are not required.
|
Routing - PLANNING | 9/25/2019 | | 9/26/2019 | | PASS |
Karla Nelson
|
|
|
Complies with CFH19-00072
|
Routing - PUBLIC WORKS | 9/25/2019 | | 9/25/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 9/25/2019 | | 9/25/2019 | | PASS |
Michael Zawacki
|
|
|
Site prep inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 9/25/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/25/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/25/2019 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/24/2019 | | DONE |
|
|
|
CFH approval 9-3-2019. Manual J addressed correctly.
|
Intake Approval | | | 9/6/2019 | | FAIL |
|
|
|
NEED
ZONING APPROVAL LETTER
|
Intake Approval | | | 8/21/2019 | | FAIL |
|
|
|
need P&Z approval for cat 2-need to wait until appeal perior is over
|
Plans ACCEPTED BY PLAN TECH | | | 8/19/2019 | | FAIL |
|
|
|
1.Manual J that was provided has wrong address
Project value on application is $700 left a message to applicant to verify it.
2. per Melissa- Project will require a CAT II Hillside application prior to acceptance of the building permit application. Application #114 will need to be filled out and turned in to the Planning & Zoning counter at city hall with the application fee. Once the application has been approved by P&Z please upload the approval letter and then this building permit case can be routed for approval. Melissa Jannusch ###-####.
|
Application received | | | 8/14/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 14 2019 5:32PM
|