BLD-Final | 4/9/2020 | 4/9/2020 | 4/9/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 4/9/2020 | 4/9/2020 | 4/9/2020 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 4/9/2020 | 4/9/2020 | 4/9/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Photos of the landscaping and a video of the drainage connection have been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 4/8/2020 | 4/8/2020 | 4/8/2020 | A | NR |
Brandon Shaw
|
|
|
|
BLD-Final | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Other | 1/3/2020 | 1/6/2020 | 1/6/2020 | A | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Other | 1/3/2020 | 1/6/2020 | 1/6/2020 | A | CANC |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Energy code compliance | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick. Noted that denoted hardware on sheet S1.1 has not yet been installed.
|
BLD-Framing/Rough-in | 12/24/2019 | 12/27/2019 | 12/27/2019 | A | FAIL |
Brandon Shaw
|
|
|
Provide Truss Engineering... See pg S1.1 for missing hardware... OK to insulate...
|
BLD-Wall Bracing | 12/2/2019 | 12/2/2019 | 12/2/2019 | P | FAIL |
Brandon Shaw
|
|
|
Renail 2nd floor shear panels, see red crayon...
|
BLD-Foundation | 10/9/2019 | 10/9/2019 | 10/9/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 10/7/2019 | 10/7/2019 | 10/7/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 10/4/2019 | 10/4/2019 | 10/4/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 9/26/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/26/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/13/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 8/19/2019 | 8/19/2019 | 9/13/2019 | | DONE |
Jenny Nelson
|
|
|
09/05 sfd L2 ePlan. 1st review complete 8/23, failed hillside
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 9/13/2019 | | DONE |
|
|
|
met
|
Routing PW Grading-Hillside | 9/11/2019 | | 9/11/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing PW Grading-Hillside | 8/21/2019 | | 8/23/2019 | | FAIL |
Melissa Jannusch
|
|
|
plan modification to be submitted moving wall to lower lot or removing wall.
|
1st review completed | | | 8/23/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 8/19/2019 | | 8/23/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing - FIRE | 8/19/2019 | 8/19/2019 | 8/21/2019 | | PASS |
Lee G Meredith
|
|
|
08/30-6094 E FoxGrove Dr. 404 LGM
Sprinklers are not required.
|
Routing - PUBLIC WORKS | 8/19/2019 | | 8/21/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 8/19/2019 | | 8/21/2019 | | PASS |
Michael Zawacki
|
|
|
|
Route to Impact Fee Review | 8/19/2019 | 8/22/2019 | 8/20/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 8/19/2019 | | 8/20/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Addressing | 8/19/2019 | | 8/20/2019 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 8/19/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/19/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 8/19/2019 | | 8/19/2019 | | PASS |
Sue Cummings
|
|
|
|
Application received | | | 8/15/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 15 2019 11:09AM
|