BLD-Aging Inspection | 7/15/2020 | 7/15/2020 | 7/15/2020 | | CANC |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 7/14/2020 | 7/14/2020 | 7/15/2020 | | PEND |
Tell Riley
|
|
|
finals are complete, possible occupancy has not been requested??
|
BLD-Final | 2/28/2020 | 3/2/2020 | 3/2/2020 | A | PASS |
Jim Storey
|
|
|
Santego Phone #: ###-####
|
FIRE-Final Inspection | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, spoke with Michael Hanson about round type door hardware on the east door as well as exit signage removal. Based on occupant load one exit is required, door hardware on east door will remain. Exit sigange has been removed as well due to not being required. Final life fire safety inspection is complete, signature provided on permit sign off card.
Santiago Phone #: ###-####
|
FIRE-Final Inspection | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for notes of the corrections needed. Per plan review only one exit is required.
Santiago Phone #: ###-####
|
BLD-Final | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | NR |
Tell Riley
|
|
|
santiago Phone #: ###-####//needs fire life safety prior to final inspection and occupancy///
|
Plan Reviewer's activity | | | 2/4/2020 | | DONE |
Michael Hanson
|
|
|
Ok to remove the illuminated exit signs as occupant load is 6. Main door sign stating "This door to remain unlocked while space is occupied" is required.
|
BLD-Final | 1/7/2020 | 1/8/2020 | 1/8/2020 | P | CANC |
Tell Riley
|
|
|
Santiago Phone #: ###-#### //
|
BLD-Energy code compliance | 11/17/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Tell Riley
|
|
|
lock box code 3085 Phone #: ###-#### Inspection requested via web by Santiago Hernandez//need to insulate above garage door//ok after insulation added//ADA blocking installed//
|
BLD-Framing/Rough-in | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PART |
Tell Riley
|
|
|
Santiago Phone #: ###-####/frame ok-need to add ADA backing//need mechanical rough in inspection prior to insulating//pending mechanical rough in pass//
|
(F) Reprint permit | | | 10/31/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/31/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/30/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/30/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/29/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 10/29/2019 | | DONE |
|
|
|
All met
NEED
ACHD fees or receipt
GC
Revised Certificate of Value
|
Plan assigned to (M_H) | 9/20/2019 | | 10/29/2019 | | DONE |
Michael Hanson
|
|
|
3rd review completed - 10/02 #518 L2 ePlan - Greens 'N Things TI
|
Routing - PLAN CHECK | 10/21/2019 | | 10/21/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 10/18/2019 | | 10/18/2019 | | FAIL |
Michael Hanson
|
|
|
corrections required for the last two changemarks to be resolved (accessible ramp and landing at interior door, lighting in small warehouse).
|
Plan Reviewer's activity | | | 10/18/2019 | | DONE |
Michael Hanson
|
|
|
I left you a voicemail detailing the corrections required for the last two changemarks to be resolved (accessible ramp and landing at interior door, lighting in small warehouse). Please listen to that voicemail and call me if you have further questions, otherwise I should be able to approve once those two items are resubmitted and resolved.
|
Routing - PLAN CHECK | 10/11/2019 | | 10/11/2019 | | FAIL |
Michael Hanson
|
|
|
Changemarks were not resolved.
|
Route to Impact Fee Review | 10/2/2019 | 10/5/2019 | 10/2/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 10/2/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 9/20/2019 | | 10/2/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
Routing - FIRE | 9/20/2019 | 9/20/2019 | 9/30/2019 | | PASS |
Erika Akin
|
|
|
10/02 L2 Greens 'N Things TI ePlan
|
Routing - Design Review | 9/20/2019 | | 9/24/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - MECHANICAL | 9/20/2019 | | 9/24/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Addressing | 9/20/2019 | | 9/24/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/20/2019 | | 9/20/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 9/19/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 9/12/2019 | | FAIL |
Michael Hanson
|
|
|
Provide the following:
Completed 518 checklist (not the application this is a separate form that you fill out and upload)
|
Intake Approval | | | 9/9/2019 | | FAIL |
Michael Hanson
|
|
|
Provide the following:
Completed 518 checklist
Completed 304 form
Missing items on the G001 cover sheet (vicinity map, key plan)
Missing the floor plan on A101
|
Application received | | | 8/16/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 16 2019 4:44PM
|