Permit Information
Permit NumberBLD19-03169
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 2677 E RHYOLITE CT
Project NameSteve Swanson PV
Customer Number 
ePlanReviewYes
Description
MODIFICATION - PANEL WATTAGE CHANGE 10/7/19 **jab** Permit for 280sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 18 panels in 1 array. No work needed to the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/25/201910/28/201910/28/2019PPASS
DetailsJim Storey
Mierins Rozentals is the on site contact Phone #: ###-#### Inspection requested via web by BRS Permitting
DOC - Permit Finaled10/28/201910/28/201910/28/2019PPASS
DetailsJim Storey
CHANGE STATUS TO (ISS)  10/8/2019 DONE
Plan assigned to (JAB) Josh10/3/201910/3/201910/7/2019 PASS
DetailsJosh Bogle
Routing - PLAN CHECK10/4/2019 10/7/2019 PASS
DetailsJosh Bogle
Permit Ready to Issue  10/7/2019 DONE
plan mod
Routing - PLANNING10/4/2019 10/4/2019 PASS
DetailsTiffany Carson-Herker
Routing - PLANNING10/4/2019 10/4/2019 PASS
DetailsSue Cummings
Still good
Plan Modification Accepted  10/3/2019 DONE
Changing the type of panel
Plan assigned to (JAB) Josh8/19/20198/19/20199/6/2019 PASS
DetailsJosh Bogle
08/23 PV, ePlan - 1st done
PLANS/APPL TAKEN TO FRONT DESK  9/6/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  9/6/2019 DONE
Issue PAID IN FULL permit  9/6/2019 DONE
Plan Reviewer's activity  9/4/2019 DONE
DetailsJosh Bogle
deleted two spec sheets pre Isaiah
1st review completed  8/23/2019 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK8/19/2019 8/23/2019 FAIL
DetailsJosh Bogle
see notes in ePlan
Application received  8/19/2019 DONE
Application submitted via PDS Online on Aug 19 2019 1:37PM
Intake Approval  8/19/2019 PASS
Recd Pcfee & Taken To Pln CK  8/19/2019 DONE
no fees paid at intake
Routing - PLANNING8/19/2019 8/19/2019 PASS
DetailsSue Cummings