Plan resubmittals received | | | 10/25/2019 | | DONE |
|
|
|
Applicant dropped off 2 copies of resubmittal. Sheets: A1.0, A2.1, A2.3, A4.1, S2.1, S2.2A, S2.3A, S2.4A, S2.6, S2.9, S3.0
|
BLD-Wall Bracing | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Jim Storey
|
|
|
Fernando Phone #: ###-####
|
BLD-Framing/Rough-in | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Jim Storey
|
|
|
Fernando Phone #: ###-####
|
BLD-Footing | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | PART |
Tony Young
|
|
|
Phone #: ###-####,, patio/ living addition footing ok
|
PubWorks Subgrade Approval | 9/6/2019 | 9/6/2019 | 9/6/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Conference | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | PART |
Tony Young
|
|
|
Fernando Phone #: ###-####.. ? about the gutter drain pipe next to the footing.. general look at the job,, ok,, drain pipe not affecting
|
Plan assigned to (J_N) | 8/20/2019 | 8/20/2019 | 8/26/2019 | | DONE |
Jenny Nelson
|
|
|
08/26 L2 addition, 1st complete 8/26, need engineering stamped
|
Routing - PLAN CHECK | 8/23/2019 | | 8/26/2019 | | FAIL |
Jenny Nelson
|
|
|
Engineering not stamped
|
1st review completed | | | 8/26/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 8/26/2019 | | 8/26/2019 | | PASS |
Jenny Nelson
|
|
|
|
Inspection Record Card- Bld | | | 8/26/2019 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 8/26/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 8/26/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/26/2019 | | DONE |
|
|
|
|
Telephone call | | | 8/26/2019 | | DONE |
|
|
|
spoke with fernando and gerry informing them this permit is ready. gerry paid and fernando will be in to pick up the permit
|
Routing PW Grading-Hillside | 8/20/2019 | | 8/23/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Application received | | | 8/20/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 20 2019 3:58AM
|
Routing Walk-In (Zoning) | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | FAIL |
Jenny Nelson
|
|
|
Took in as level 2 for hillside
|
Meeting | | | 8/20/2019 | | DONE |
|
|
|
applicant decided to submit in paper- Email Tisha for the eplan
|
Intake Approval | | | 8/20/2019 | | FAIL |
|
|
|
need an extra set of plans
on Hillside check, Jason came over and said it was a CAT 1 okay to take in and route to Melissa after the 2nd set of plans come in.
|