BLD-Energy code compliance | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | PASS |
Jim Storey
|
|
|
Nathan Phone #: ###-####
|
BLD-Framing/Rough-in | 2/19/2020 | 2/20/2020 | 2/20/2020 | A | FAIL |
Mike Jordan
|
|
|
Call ahead - Nathan Phone #: ###-####. Ok to insulate. Needs to complete lateral bracing.
|
BLD-Wall Bracing | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | PASS |
Mike Jordan
|
|
|
shear // Nathan Phone #: ###-####
|
BLD-Wall Bracing | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | FAIL |
Mike Jordan
|
|
|
Nathan - call in advance Phone #: ###-####. Install blocking and nail. Nail all missed areas.
|
BLD-Wall Bracing | 1/9/2020 | 1/10/2020 | 1/10/2020 | P | CANC |
Mike Jordan
|
|
|
Nathan Phone #: ###-####
|
BLD-Foundation | 12/16/2019 | 12/17/2019 | 12/17/2019 | A | CANC |
Mike Jordan
|
|
|
Call ahead // Nathan Phone #: ###-####
|
BLD-Foundation | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | PART |
Mike Jordan
|
|
|
stem wall- Nate Phone #: ###-####
|
BLD-Foundation | 11/26/2019 | 11/27/2019 | 11/27/2019 | P | CANC |
Mike Jordan
|
|
|
Nathan- foundation wall inspection Phone #: ###-####
|
BLD-Concrete | 11/25/2019 | 11/26/2019 | 11/26/2019 | A | CANC |
Mike Jordan
|
|
|
Nathan Phone #: ###-####
|
BLD-Footing | 11/26/2019 | 11/26/2019 | 11/26/2019 | A | PART |
Mike Jordan
|
|
|
Nathan Phone #: ###-####. Ok to place concrete this afternoon.
|
BLD-Footing | 11/22/2019 | 11/25/2019 | 11/25/2019 | A | NR |
Mike Jordan
|
|
|
Nathan Phone #: ###-####. Needs to place reinforcement for garage. Bottom of footing is frozen. Form work below the required 34 F. to place concrete.
|
OVERRIDE | | | 11/12/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 11/12/2019 | | 11/12/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/12/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/12/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 11/12/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/12/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 8/20/2019 | 8/20/2019 | 8/20/2019 | A | PASS |
Jeff Lowe
|
|
|
no ADU proposed with permit
|
Routing Walk-In (BLD) | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/20/2019 | | 8/20/2019 | | FAIL |
Brian McGowan
|
|
|
insufficient drawings
|
1st review completed | | | 8/20/2019 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 8/20/2019 | | | |
|
|
|
|