BLD-Final | 9/25/2019 | 9/26/2019 | 9/26/2019 | A | PASS |
Mike Jordan
|
|
|
gary Phone #: ###-####
|
DOC - Permit Finaled | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Other | 9/9/2019 | 9/10/2019 | 9/10/2019 | A | PASS |
Mike Jordan
|
|
|
roof nailing // Mike Phone #: ###-####
|
BLD-Foundation | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | PASS |
Tell Riley
|
|
|
Mike- foundation Phone #: ###-####
|
Routing Walk-In (BLD) | 9/3/2019 | 9/3/2019 | 9/3/2019 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 9/3/2019 | 9/3/2019 | 9/3/2019 | | DONE |
Josh Bogle
|
|
|
changing size of beam
|
Permit Ready to Issue | | | 9/3/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/3/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 8/21/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Ethan Mansfield
|
|
|
changing size of beam
|
Routing Walk-In (BLD) | 8/21/2019 | 8/21/2019 | 8/21/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/21/2019 | | 8/21/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 8/21/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/21/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/21/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 8/21/2019 | | DONE |
|
|
|
Parcel Owner needs to sign application and then application needs to be uploaded
|
Application received | | 8/21/2019 | | | |
|
|
|
|