Letter of compliance/Occupancy | | | 4/13/2020 | | DONE |
|
|
|
|
BLD-Final | 4/9/2020 | 4/10/2020 | 4/10/2020 | A | PASS |
Brandon Shaw
|
|
|
screened - residence unoccupied since September - call for access // Nick Phone #: ###-####
|
DOC - Permit Finaled | 4/10/2020 | 4/10/2020 | 4/10/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Other | 4/3/2020 | 4/6/2020 | 4/6/2020 | A | PEND |
Brandon Shaw
|
|
|
Provide ES REPORT...
|
BLD-Framing/Rough-in | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PASS |
Brandon Shaw
|
|
|
Soffit boxes...
|
BLD-Framing/Rough-in | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PART |
Brandon Shaw
|
|
|
Interior only, OK to insulate...
|
Plan assigned to (RDP) | 9/19/2019 | 9/19/2019 | 9/19/2019 | | DONE |
Rob Patrick
|
|
|
|
Routing Walk-In (BLD) | 9/19/2019 | 9/19/2019 | 9/19/2019 | A | DONE |
Rob Patrick
|
|
|
|
Plan Modification Accepted | | | 9/19/2019 | | DONE |
|
|
|
per rob
|
Routing - PLAN CHECK | 9/19/2019 | | 9/19/2019 | | PASS |
Rob Patrick
|
|
|
Please add 1 hour of review time.
|
Inspection Record Card- Bld | | | 9/19/2019 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 9/19/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 9/19/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/19/2019 | | DONE |
|
|
|
|
BLD-Conference | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | DONE |
Brandon Shaw
|
|
|
As per phone conversation with contractor, trades are pulling permits as required...
|
Routing Walk-In (BLD) | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/21/2019 | | 8/21/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 8/21/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/21/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/21/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 8/21/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/21/2019 | | DONE |
|
|
|
|
Application received | | 8/21/2019 | | | |
|
|
|
|
Routing - PLAN CHECK | 9/19/2019 | | | | |
Rob Patrick
|
|
|
|