BLD-Final | 1/28/2020 | 1/29/2020 | 1/29/2020 | A | PASS |
Jim Storey
|
|
|
Gaty- pplease call for access Phone #: ###-####
|
DOC - Permit Finaled | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | DONE |
Jim Storey
|
|
|
Gaty- pplease call for access Phone #: ###-#### 4.62
|
BLD-Energy code compliance | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PASS |
Mike Jordan
|
|
|
Gari Phone #: ###-####
|
BLD-Framing/Rough-in | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PASS |
Mike Jordan
|
|
|
Gari Phone #: ###-####
|
BLD-Framing/Rough-in | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | FAIL |
Brandon Shaw
|
|
|
Hold downs not installed per manufacturers reccom...
|
BLD-Energy code compliance | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | FAIL |
Brandon Shaw
|
|
|
Hold downs not installed per manufacturers reccom...
|
BLD-Framing/Rough-in | 11/5/2019 | 11/6/2019 | 11/6/2019 | P | FAIL |
Mike Jordan
|
|
|
Gari Phone #: ###-####. Install h2.5 on E01 trusses. Install headers over doorway to bedroom #4 and at hallway entry(A01 interior bearing) Complete the install of hold downs for portal frame, west wall.
|
BLD-Framing/Rough-in | 11/4/2019 | 11/5/2019 | 11/5/2019 | A | NR |
Mike Jordan
|
|
|
Gari Phone #: ###-####. Mech rough in inspection has failed.
|
BLD-Wall Bracing | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PART |
Mike Jordan
|
|
|
shear // Gotti Phone #: ###-####. Ok to tyvek except for garage front.
|
BLD-Wall Bracing | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | FAIL |
Mike Jordan
|
|
|
Gari Phone #: ###-####. Install missing MSTC straps on exterior of RV bay opening. Install all missed blocking and nail. Provide engineering for fix on missing STDH-14 straps and bolts for hold downs.
|
BLD-Foundation | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PART |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD-Footing | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | PART |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|
Issue PAID IN FULL permit | | | 9/12/2019 | | DONE |
|
|
|
emailed office@tresidio.com permit to sign
|
Inspection Record Card- Bld | | | 9/12/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/5/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 8/22/2019 | 8/22/2019 | 9/5/2019 | | DONE |
Rob Patrick
|
|
|
09/04 sfd L1 ePlan...09/03 Failed for Wall Bracing...09/04 Failed
|
Routing - PLAN CHECK | 9/5/2019 | | 9/5/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 9/5/2019 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 9/4/2019 | | 9/4/2019 | | FAIL |
Rob Patrick
|
|
|
Portal Frame details are incorrect
|
1st review completed | | | 9/3/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLAN CHECK | 8/22/2019 | | 9/3/2019 | | FAIL |
Rob Patrick
|
|
|
|
Route to Impact Fee Review | 8/22/2019 | 8/25/2019 | 8/23/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 8/22/2019 | | 8/23/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/22/2019 | | 8/23/2019 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/22/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/22/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/22/2019 | | DONE |
|
|
|
|
Routing - MECHANICAL | 8/22/2019 | | 8/22/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 8/22/2019 | | 8/22/2019 | | PASS |
Jeff Lowe
|
|
|
|
Application received | | | 8/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 21 2019 4:32PM
|