***02/18/20 PLAN MODIFICATION TO UPDATE 2 HOUR WALL*** (12 PERMITS FILED WITH BLD19-03229) Permit for the construction of a new 1599 sq. ft., 3 story (first story 201 sq. ft., second story 746 sq. ft., third story 652 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 146 sq. ft. of covered patio/porch and a 460 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance. C-1D zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Routing - PLANNING7/7/2020 7/7/2020 FAIL
DetailsSue Cummings
This permit need CUP mod first, because you're adding to it.
Plan Modification Accepted  7/6/2020 DONE
Plan mod on BLD19-03255- paper to epla
BLD-Energy code compliance4/1/20204/2/20204/2/2020PPASS
DetailsTell Riley
Tell can you text me your Email address so I can send you the engineering on the floor joist and also from Kolby Thanks Carl Phone #: ###-#### Inspection requested via web by Carl Funk//framing corrections noted, framing was walked through with design engineer, noted changes were approved by engineer//joist were ok per LP engineer//insulation ok//
BLD-Framing/Rough-in3/29/20203/30/20203/30/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk////see corrections prior to any cover approval//need letter from engineer//ok to insulate//
BLD-Framing/Rough-in3/26/20203/27/20203/27/2020ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//used as conference with engineer of record and contractor//some engineering will need to be completed and corrections made in framing//need I joist manual for plumbing in Is//need truss engineering//
BLD-Framing/Rough-in3/26/20203/26/20203/26/2020PNR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk
Fees Due Hold3/13/2020 3/26/2020 DONE
Details
BLD-Wall Bracing3/13/20203/13/20203/13/2020APASS
DetailsTell Riley
Sheetrock fire walls Phone #: ###-#### Inspection requested via web by Carl Funk
Routing - MECHANICAL3/12/2020 3/12/2020 PASS
DetailsTroy James
Resubmitted manual j report
BLD-Wall Bracing3/11/20203/11/20203/11/2020PCANC
DetailsTell Riley
Firewall bracing with email from Engineer Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Wall cover2/23/20202/24/20202/24/2020PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk// rated separation walls only//blocking added at floor//insualtion needs to be R20 at exterior 2x8 rated walls//some insulation has fallen, would like to see as drywall is installed//
BLD-Wall cover2/20/20202/20/20202/20/2020ANR
DetailsTell Riley
Call me on your way please Phone #: ###-#### Inspection requested via web by Carl Funk//still working on ELE// need to fix insulation//address fireblocking issue with Architect//remove siding in center unit to install 2 layers of 5/8 per detail//
CHANGE STATUS TO (ISS)  2/19/2020 DONE
OVERRIDE  2/18/2020  
Plan assigned to (RDP)2/11/20202/11/20202/18/2020 DONE
DetailsRob Patrick
02/17 Plan Mod
Routing - PLAN CHECK2/18/2020 2/18/2020 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  2/18/2020 DONE
DetailsRob Patrick
Telephone call  2/18/2020 DONE
Left Voice Message with Carl, Plan Mod is ready to be picked up. Let him know of the fees due
Permit Ready to Issue  2/18/2020 DONE
Plan Modification Accepted  2/11/2020 DONE
2 copies of Sheet A4.4.
BLD-Wall cover2/5/20202/5/20202/5/2020AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//CN posted//does not meet requirements for 2 hr assembly per plans//
BLD-Wall cover1/31/20202/3/20202/3/2020ACANC
DetailsTell Riley
Phone #: ###-#### firewall Inspection requested via web by Carl Funk
BLD-Wall cover1/30/20201/31/20201/31/2020PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Carl Funk/ needs plans
BLD-Wall Bracing1/30/20201/31/20201/31/2020PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Carl Funk,, exterior ok
BLD-Wall Bracing1/29/20201/29/20201/29/2020AFAIL
DetailsTell Riley
Tell I know I have to move two of the decks back. Have not done it yet. One has to move a couple of inches and another has to move about 12 inches. The property lines are on the other side of the fence about 18 inches on the west side of the property. We did not build the fence on the property line because it was to close to the canal. Let me know when you are gonna be there and I will meet you. Thanks Carl Phone #: ###-#### Inspection requested via web by Carl Funk/See red marks for corrections,straps, and nailing//
BLD-Wall Bracing1/7/20201/8/20201/8/2020PFAIL
DetailsTell Riley
Call Framer Yurguen Robelero ###-#### when you are on your way so he can meet you. Thanks Carl Phone #: ###-#### Inspection requested via web by Carl Funk//CN posted//need to finish shear areas on back wall//need to meet rear setbacks per plans at decks//
BLD-Wall Bracing12/16/201912/16/201912/16/2019ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//used inspection as conference//
BLD-Foundation10/14/201910/14/201910/14/2019PPART
DetailsTell Riley
Cergo Phone #: ###-####//WIP//need to install hold downs//
BLD-Footing10/10/201910/10/201910/10/2019PPART
DetailsTell Riley
Sergio Phone #: ###-####//rebar ok//maintain 15 ft rear setback when porch piers are setup--not yet set///
OVERRIDE  10/3/2019  
Inspection Record Card- Bld  10/3/2019 DONE
Telephone call  10/3/2019 DONE
spoke with carl informing permit is ready and fee amount
Issue PAID IN FULL permit  10/3/2019 DONE
Plan assigned to (RDP)8/28/2019 10/3/2019 DONE
DetailsRob Patrick
09/16 sfd L2 PAPER...Failed
Routing - PLAN CHECK10/3/2019 10/3/2019 PASS
DetailsRob Patrick
Case Summary (BLD)  10/3/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  10/3/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  10/3/2019 DONE
need to iss all 12 permits at one time
Plan resubmittals received  10/2/2019 DONE
Two copies each of structural design calcualtions stamped and taken to plan reviewer.
Plan resubmittals received  9/27/2019 DONE
Two copies of plan sheets A2.0, A2.2, A2.6, A2.7, A4.4, S2.0 and E2.1. taken to rob
1st review completed  9/25/2019 FAIL
DetailsRob Patrick
Multiple corrections
Routing - PLAN CHECK9/6/2019 9/25/2019 FAIL
DetailsRob Patrick
Multiple corrections
Routing - MECHANICAL8/28/2019 9/6/2019 PASS
DetailsTroy James
Plan resubmittals received  9/6/2019 DONE
Two copies of plan sheets A1.0 taken to Rob
Routing - Design Review9/5/2019 9/5/2019 PASS
DetailsKatelyn Menuge
Redlined facade and landscape changes.
Routing - PLANNING8/28/2019 9/4/2019 PASS
DetailsDavid Moser
Routing - PUBLIC WORKS8/28/2019 9/3/2019 PASS
DetailsMorgan Webb
CONTACT WEST BOISE SEWER DISTRICT ###-####
Routing - Addressing8/28/2019 8/30/2019 PASS
DetailsDoug Chausow
Route to Impact Fee Review8/28/20198/31/20198/29/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Plans ACCEPTED BY PLAN TECH  8/28/2019 DONE
Recd Pcfee & Taken To Pln CK  8/28/2019 DONE
Intake Approval  8/28/2019 PASS
Application received  8/22/2019 DONE
Application submitted via PDS Online on Aug 22 2019 7:32AM
Intake Approval  8/22/2019 FAIL
Hi Carl,
Per our phone conversation please upload 11 more application into the documents with the individual address. Please have the individual address on the Manual J's.
Also please have your plans showing the correct naming convention (example: A1.0_Site Plan), when you send it back in I will delete the plans that just have A1.0.pdf and on. Please let me know if you have any questions.