Permit Information
Permit NumberBLD19-03250
StatusIssued
Name C & T CONSTRUCTION
Site Address 7797 W CRESTWOOD DR
Project Name9A
Customer NumberBLD19-03229, 03247 - 03257
ePlanReview 
Description
***02/18/20 PLAN MODIFICATION TO UPDATE 2 HOUR WALL*** (12 PERMITS FILED WITH BLD19-03229) Permit for the construction of a new 1589 sq. ft., 3 story (first story 189 sq. ft., second story 750 sq. ft., third story 650 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 146 sq. ft. of covered patio/porch and a 450 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance. C-1D zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall cover4/16/20204/17/20204/17/2020APASS
DetailsTell Riley
Brackets Phone #: ###-#### Inspection requested via web by Carl Funk/Simpson shoe added for stud reinforcment on studs drilled for ele wire//ok when insulation is fixed//
BLD-Energy code compliance4/10/20204/10/20204/10/2020PPART
DetailsTell Riley
do not cover new electrical/// all other areas ok, corrections made, framing was walked through with engineer, contractor and I, corrections have been made//
BLD-Wall cover4/10/20204/10/20204/10/2020AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funkcn issued to remove gyp to see framing corrections and insulation//
BLD-Energy code compliance4/1/20204/2/20204/2/2020PNR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk/need to see length of lags used in ledger areas, boxes onsite are 6" and some areas would require a 10" lag for the 3" minimum needed per plans//will check other corrections when re-schedule//
BLD-Framing/Rough-in3/29/20203/30/20203/30/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk////see corrections prior to any cover approval//need letter from engineer//ok to insulate//
BLD-Framing/Rough-in3/26/20203/27/20203/27/2020ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//used as conference with engineer of record and contractor//some engineering will need to be completed and corrections made in framing//need I joist manual for plumbing in Is//need truss engineering//
BLD-Framing/Rough-in3/25/20203/26/20203/26/2020PNR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Wall Bracing3/11/20203/11/20203/11/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk/nailing ok on firewall shear, per engineers email//
BLD-Wall Bracing3/6/20203/6/20203/6/2020PNR
DetailsTell Riley
carl - firewall nailing pattern Phone #: ###-####
Fees Due Hold3/5/2020 3/6/2020 DONE
DetailsGabe Brenner
Routing - MECHANICAL3/4/2020 3/4/2020 PASS
DetailsTroy James
Resubmitted manual j report
BLD-Wall cover3/2/20203/3/20203/3/2020APASS
DetailsMike Jordan
Fire wall insulation Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Wall cover2/23/20202/24/20202/24/2020PNR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//Still needs electrical approval for separation walls//
BLD-Wall cover2/20/20202/20/20202/20/2020ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//still working on ELE// need to fix insulation//address fireblocking issue with Architect//remove siding in center unit to install 2 layers of 5/8 per detail//
Permit Ready to Issue  2/19/2020 DONE
CHANGE STATUS TO (ISS)  2/19/2020 DONE
Plan assigned to (RDP)2/11/20202/11/20202/18/2020 DONE
DetailsRob Patrick
02/17 Plan Mod
Routing - PLAN CHECK2/18/2020 2/18/2020 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  2/18/2020 DONE
DetailsRob Patrick
Plan Modification Accepted  2/11/2020 DONE
2 copies of Sheet A4.4.
BLD-Wall cover2/5/20202/5/20202/5/2020AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//CN posted//does not meet requirements for 2 hr assembly per plans//
BLD-Wall cover1/31/20202/3/20202/3/2020ACANC
DetailsTell Riley
Phone #: ###-#### fire wall Inspection requested via web by Carl Funk
BLD-Wall cover1/30/20201/31/20201/31/2020PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Carl Funk/ needs plans
BLD-Wall Bracing1/30/20201/31/20201/31/2020PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Carl Funk,, exterior ok
BLD-Wall Bracing1/29/20201/29/20201/29/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//still need hold downs nailed correctly//
BLD-Wall Bracing1/7/20201/8/20201/8/2020PNR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//CN issued//not quite ready//
BLD-Wall Bracing12/18/201912/19/201912/19/2019APART
DetailsTell Riley
Inspection requested via web by Carl Funk//Nailing and hardware ok in most locations--some strapping needs lowered//location near fire separation wall will need tied into shear wall, waiting for engineered detail//
BLD-Wall Bracing12/18/201912/18/201912/18/2019PCANC
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Wall Bracing12/16/201912/16/201912/16/2019ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//used inspections as conference//
BLD-Foundation10/17/201910/17/201910/17/2019PPART
DetailsTell Riley
wip
BLD-Footing10/15/201910/16/201910/16/2019APASS
DetailsTell Riley
SERGIO Phone #: ###-####//setbacks and rebar ok per plans//
OVERRIDE  10/3/2019  
Inspection Record Card- Bld  10/3/2019 DONE
Telephone call  10/3/2019 DONE
spoke with carl informing permit is ready and fee amount
Issue PAID IN FULL permit  10/3/2019 DONE
Plan assigned to (RDP)8/28/2019 10/3/2019 DONE
DetailsRob Patrick
09/16 sfd L2 PAPER...Failed
Routing - PLAN CHECK10/3/2019 10/3/2019 PASS
DetailsRob Patrick
Case Summary (BLD)  10/3/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  10/3/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  10/3/2019 DONE
all 12 permits must be issued at the same time
Plan resubmittals received  10/2/2019 DONE
Two copies each of structural design calcualtions stamped and taken to plan reviewer.
Plan resubmittals received  9/27/2019 DONE
Two copies of plan sheets A2.0, A2.2, A2.6, A2.7, A4.4, S2.0 and E2.1. taken to rob
1st review completed  9/25/2019 FAIL
DetailsRob Patrick
Multiple Corrections
Routing - PLAN CHECK9/6/2019 9/25/2019 FAIL
DetailsRob Patrick
Multiple Corrections
Routing - MECHANICAL8/28/2019 9/6/2019 PASS
DetailsTroy James
Routing - Design Review9/5/2019 9/5/2019 PASS
DetailsKatelyn Menuge
Redlined facade and landscape changes.
Routing - PLANNING8/28/2019 9/4/2019 PASS
DetailsDavid Moser
Routing - PUBLIC WORKS8/28/2019 9/3/2019 PASS
DetailsMorgan Webb
CONTACT WEST BOISE SEWER DISTRICT ###-####
Routing - Addressing8/28/2019 8/30/2019 PASS
DetailsDoug Chausow
Route to Impact Fee Review8/28/20198/31/20198/29/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Plans ACCEPTED BY PLAN TECH  8/28/2019 DONE
Recd Pcfee & Taken To Pln CK  8/28/2019 DONE
Intake Approval  8/28/2019 PASS
Application received 8/22/2019   
Application received 8/22/2019