BLD-Energy code compliance | 6/19/2020 | 6/19/2020 | 6/19/2020 | A | PASS |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//area behind tup insulated and VB installed//
|
BLD-Energy code compliance | 6/17/2020 | 6/17/2020 | 6/17/2020 | A | FAIL |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//need to remove tub/shower on 3rd floor to insulate and install vapor barrier//
|
BLD-Framing/Rough-in | 6/12/2020 | 6/12/2020 | 6/12/2020 | A | PASS |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//ok to insulate//see Joey onsite for correction notes//
|
BLD-Wall Bracing | 6/2/2020 | 6/2/2020 | 6/2/2020 | P | PART |
Tell Riley
|
|
|
Firewall Inspection requested via web by Carl Funk//interior gyp shear wall//ok to cover when screws have been added at blocking lines on each floor as discussed//screws per details and email from engineer for gyp shear walls//
|
BLD-Energy code compliance | 5/18/2020 | 5/18/2020 | 5/18/2020 | A | PART |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//fire wall insulation only ok//call for shear on gyp//
|
BLD-Energy code compliance | 5/15/2020 | 5/15/2020 | 5/15/2020 | P | NR |
Tell Riley
|
|
|
Insulation Firewall Inspection requested via web by Carl Funk//need to fix R21/add R21 in areas noted on walk through//
|
BLD-Framing/Rough-in | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PEND |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//fire separation only//corrections made//need rating for ele heater in separation wall(all Units)//pending ele rough//
|
BLD-Framing/Rough-in | 5/7/2020 | 5/7/2020 | 5/7/2020 | A | FAIL |
Tell Riley
|
|
|
Fire blocking firewall Phone #: ###-#### Inspection requested via web by Carl Funk/framing for fire walls ONLY//add nuts and bolts in areas noted//add studs in areas noted//add fire blocking in areas noted//see details for truss connections at fire walls//complete air seal//
|
Fees Due Hold | 3/28/2020 | | 3/29/2020 | | DONE |
|
|
|
|
Routing - MECHANICAL | 3/27/2020 | | 3/27/2020 | | PASS |
Troy James
|
|
|
Resubmitted ACCA report
|
BLD-Wall Bracing | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD-Wall Bracing | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//need to add nails, fix hold downs nails//did walk through with carl//add hold downs where needed//
|
Permit Ready to Issue | | | 2/19/2020 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/19/2020 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 2/11/2020 | 2/11/2020 | 2/18/2020 | | DONE |
Rob Patrick
|
|
|
02/17 Plan Mod
|
Routing - PLAN CHECK | 2/18/2020 | | 2/18/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/18/2020 | | DONE |
Rob Patrick
|
|
|
|
Plan Modification Accepted | | | 2/11/2020 | | DONE |
|
|
|
2 copies of Sheet A4.4.
|
BLD-Foundation | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PART |
Tell Riley
|
|
|
SERGIO- wall foundation inspection Phone #: ###-####//wip//
|
BLD-Footing | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PART |
Tell Riley
|
|
|
Sergio Phone #: ###-####//ok when bars added for 32" requirement//
|
OVERRIDE | | | 10/3/2019 | | |
|
|
|
|
Telephone call | | | 10/3/2019 | | DONE |
|
|
|
spoke with carl informing permit is ready and fee amount
|
Issue PAID IN FULL permit | | | 10/3/2019 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 8/28/2019 | | 10/3/2019 | | DONE |
Rob Patrick
|
|
|
09/16 sfd L2 PAPER...Failed
|
Routing - PLAN CHECK | 10/3/2019 | | 10/3/2019 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 10/3/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2019 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 10/3/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/3/2019 | | DONE |
|
|
|
Do not issue without the other permits - 12 in total
|
Inspection Record Card- Bld | | | 10/3/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/3/2019 | | DONE |
|
|
|
Do not issue without the other permits - 12 in total
|
Plan resubmittals received | | | 10/2/2019 | | DONE |
|
|
|
Two copies each of structural design calcualtions stamped and taken to plan reviewer.
|
Plan resubmittals received | | | 9/27/2019 | | DONE |
|
|
|
Two copies of plan sheets A2.0, A2.2, A2.6, A2.7, A4.4, S2.0 and E2.1. taken to rob
|
1st review completed | | | 9/25/2019 | | FAIL |
Rob Patrick
|
|
|
Multiple Corrections
|
Routing - PLAN CHECK | 9/6/2019 | | 9/25/2019 | | FAIL |
Rob Patrick
|
|
|
Multiple Corrections
|
Routing - MECHANICAL | 8/28/2019 | | 9/6/2019 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 9/5/2019 | | 9/5/2019 | | PASS |
Katelyn Menuge
|
|
|
Redlined facade and landscape changes.
|
Routing - PLANNING | 8/28/2019 | | 9/4/2019 | | PASS |
David Moser
|
|
|
|
Routing - PUBLIC WORKS | 8/28/2019 | | 9/3/2019 | | PASS |
Morgan Webb
|
|
|
CONTACT WEST BOISE SEWER DISTRICT ###-####
|
Routing - Addressing | 8/28/2019 | | 8/30/2019 | | PASS |
Doug Chausow
|
|
|
|
Route to Impact Fee Review | 8/28/2019 | 8/31/2019 | 8/29/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plans ACCEPTED BY PLAN TECH | | | 8/28/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/28/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/28/2019 | | PASS |
|
|
|
|
Application received | | 8/22/2019 | | | |
|
|
|
|
Application received | | 8/22/2019 | | | |
|
|
|
|