Permit Information
Permit NumberBLD19-03269
StatusFinaled
Name ESI
Site Address 9605 S EISENMAN RD
Project NameBoise Gateway IP - Building 1
Customer NumberESC19-01125 GRD19-00064
ePlanReviewYes
Description
(BOISE GATEWAY IP BUILDING 1) NO WORK ALLOWED IN ACHD ROW UNTIL ACHD APPROVED PLANS ARE ISSUED) ""PLAN MODIFICATION #1 TO ADJUST THE ROOF AND WALL INSULATION VALUES AND ADD A FIRE PUMP ROOM WITH A DRAIN."" Permit for the construction of a new 168,000 sq. ft. shell building for a future warehouse/distribution building with work to include general site work and the construction of an unlimited area tilt-up building. all work per the approved plans and the attached engineering. Energy compliance for the building envelope is under the provisions of the 2015 IECC. A separate building permit will be required to occupy this building. The additional energy efficiency for this building is reduced lighting. This building is fully fire sprinklered for unlimited area. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice7/30/20207/30/20208/11/2020 DONE
DetailsJim Storey
mailed 8-14-2020
Zoning Approval8/5/20208/5/20208/5/2020 PASS
DetailsKatelyn Menuge
FIRE-Final Inspection7/29/20207/30/20207/30/2020ACANC
DetailsJim Page
Life safety signed off on 02JULY2020 for this permit, this request is cancelled.

Rod- */Screened*/ Phone #: ###-####
BLD-Final7/29/20207/30/20207/30/2020APASS
DetailsJim Storey
Need Life Safety ; Bld Final Phone #: ###-#### Inspection requested via web by Rod Baxter
DOC - Permit Finaled7/30/20207/30/20207/30/2020PPASS
DetailsJim Storey
BLD-Final7/1/20207/2/20207/2/2020APART
DetailsBrandon Shaw
Temp C of O is approved...
FIRE-Final Inspection7/2/20207/2/20207/2/2020APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags, knox box is located by fire sprinklerriser, fire pump room. Final life fire safety inspection for core and shell complete, signature provided on permit sign off card.
BLD-Other7/1/20207/2/20207/2/2020ACANC
DetailsBrandon Shaw
TCO/Life Safety Call Rod Baxter when you get onsite Please Phone #: ###-#### Inspection requested via web by Rod Baxter
Inspection Record Card- Bld  7/1/2020 DONE
Zoning Approval Temp6/25/20206/25/20206/25/2020 PASS
DetailsKatelyn Menuge
BND20-00103
BLD-Framing/Rough-in5/18/20205/19/20205/19/2020APASS
DetailsJim Storey
call Rod Baxter upon arrival to site. Phone #: ###-#### Inspection requested via web by Rod Baxter
BLD-Energy code compliance4/20/20204/21/20204/21/2020APASS
DetailsJim Storey
Verify R-Value of 30 at Roof. Rod Baxter Phone #: ###-#### Inspection requested via web by Rod Baxter revised iecc report. ok
OVERRIDE  4/9/2020  
Plan assigned to (CDM)3/26/20203/26/20204/9/2020 PASS
DetailsCarl D Madsen
plan mod
CHANGE STATUS TO (ISS)  4/9/2020 DONE
Routing - PLAN CHECK3/27/2020 4/9/2020 PASS
DetailsCarl D Madsen
Plan Mod
Permit Ready to Issue  4/9/2020 DONE
Plan Mod Met
Routing - FIRE3/27/20203/27/20204/3/2020 PASS
DetailsMark Stumbaugh
Plan mod MAS
Routing - PLUMBING3/27/2020 3/30/2020 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Telephone call  3/27/2020 DONE
306- updated in documents 3/27/2020
Plan Modification Accepted  3/26/2020 DONE
A list of items were attached to the plan mod application. (G0003, G004,A101,A102,A201,A202,A311,A312,A601,A801,S101,S102,S103,S104,S123,S124,S201,S203,S204,S205,MH101B,MH201,E101,E201 and E401)
BLD-Energy code compliance3/17/20203/18/20203/18/2020PFAIL
DetailsJim Storey
Inspection at Roofing Insulation Phone #: ###-#### Inspection requested via web by Rod Baxter r 38 min required.
BLD-Wall Bracing3/2/20203/3/20203/3/2020APASS
DetailsJim Storey
Joist Welding Inspection , Tilt Panel Welding Inspection Phone #: ###-#### Inspection requested via web by Rod Baxter// pannel base welds and joist welding in progress.
BLD-Footing2/10/20202/10/20202/10/2020PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Rod Baxter north end rebar ok wip si pending.
BLD-Footing2/5/20202/7/20202/6/2020ACANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Rod Baxter Inspection cancelled from web by: Rod Baxter
BLD-Footing2/4/20202/5/20202/5/2020PCANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Rod Baxter Inspection cancelled from web by: Rod Baxter
BLD-Foundation2/3/20202/4/20202/4/2020ACANC
DetailsJim Storey
Tilt Panel Inspection. Phone #: ###-#### Inspection requested via web by Rod Baxter
BLD-Footing11/13/201911/14/201911/14/2019APASS
DetailsJim Storey
Interior Spread Footings Phone #: ###-#### Inspection requested via web by Rod Baxter si on site pending reports rebar pass
Issue PAID IN FULL permit  11/8/2019 DONE
(F) Reprint permit  11/8/2019 DONE
Inspector's copy Bld permit  11/8/2019 DONE
Inspection Record Card- Bld  11/8/2019 DONE
OVERRIDE  10/30/2019  
Routing - PLANNING10/30/2019 10/30/2019 PASS
DetailsLeon Letson
Permit Ready to Issue  10/30/2019 DONE
ALL MET
GC
Revised Certificate of Value
ACHD see letter attachement to case of what fee owe
Plan assigned to (CDM)8/28/20198/28/201910/29/2019 PASS
DetailsCarl D Madsen
Boise Gateway Bldg New
Routing Off Site - STRUCTURAL10/21/2019 10/29/2019 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  10/29/2019 DONE
Routing - PLAN CHECK10/21/2019 10/29/2019 PASS
DetailsCarl D Madsen
Routing PW Sewer Design10/22/2019 10/22/2019 PASS
DetailsDeAnn Brown
Routing PW Drainage10/22/2019 10/22/2019 PASS
DetailsBrian Murphy
Routing - Design Review10/21/2019 10/22/2019 PASS
DetailsKatelyn Menuge
Check with PW Solid waste regarding internal trash room requirements.
Routing PW Street Lights10/21/2019 10/21/2019 PASS
DetailsTom Marshall
Route to Impact Fee Review10/10/201910/13/201910/11/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  10/10/2019 DONE
Routing Off Site - STRUCTURAL8/28/2019 10/9/2019 FAIL
DetailsCarl D Madsen
Kpff
Routing - PLAN CHECK8/28/2019 10/9/2019 FAIL
DetailsCarl D Madsen
Routing - PLANNING8/28/2019 10/9/2019 FAIL
DetailsLeon Letson
ROS19-00086 must be completed prior to sign-off by Planning
Routing - FIRE8/28/20198/28/20199/30/2019 PASS
DetailsMark Stumbaugh
10/08-Boise Gateway IP Building 1 502
Routing PW Drainage9/9/2019 9/9/2019 FAIL
DetailsBrian Murphy
NEED AIRPORT OK ON POND/BIRDS
Routing PW Sewer Design8/29/2019 9/5/2019 FAIL
DetailsDeAnn Brown
Sewer extension plans have not been reviewed and approved by City of Boise Public Works.
Routing - MECHANICAL8/28/2019 9/4/2019 PASS
DetailsTroy James
Routing - Design Review8/28/2019 9/3/2019 FAIL
DetailsKatelyn Menuge
See Changemarks. Also need solid waste enclosure, ROS finalized and cross-access to the south
Routing - Erosion and Sediment8/28/2019 9/3/2019 PASS
DetailsMichael Zawacki
Please refewr to esc19-01125
Routing PW Street Lights8/29/2019 8/30/2019 FAIL
DetailsTom Marshall
Need a streetlight plan.
Routing PW Solid Waste8/29/2019 8/30/2019 PASS
DetailsEvan Carpenter
Routing PW Environmental8/29/2019 8/30/2019 PASS
Routing - Addressing8/28/2019 8/30/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/28/2019 8/29/2019 PASS
DetailsAngela Hardy
Routing - PLUMBING8/28/2019 8/29/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC
Intake Approval  8/28/2019 PASS
Application received  8/23/2019 DONE
Application submitted via PDS Online on Aug 23 2019 2:03PM
Second Notice 8/21/2020