First Notice | 7/30/2020 | 7/30/2020 | 8/11/2020 | | DONE |
Jim Storey
|
|
|
mailed 8-14-2020
|
Zoning Approval | 8/5/2020 | 8/5/2020 | 8/5/2020 | | PASS |
Katelyn Menuge
|
|
|
|
FIRE-Final Inspection | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | CANC |
Jim Page
|
|
|
Life safety signed off on 02JULY2020 for this permit, this request is cancelled.
Rod- */Screened*/ Phone #: ###-####
|
BLD-Final | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | PASS |
Jim Storey
|
|
|
Need Life Safety ; Bld Final Phone #: ###-#### Inspection requested via web by Rod Baxter
|
DOC - Permit Finaled | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | PART |
Brandon Shaw
|
|
|
Temp C of O is approved...
|
FIRE-Final Inspection | 7/2/2020 | 7/2/2020 | 7/2/2020 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags, knox box is located by fire sprinklerriser, fire pump room. Final life fire safety inspection for core and shell complete, signature provided on permit sign off card.
|
BLD-Other | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | CANC |
Brandon Shaw
|
|
|
TCO/Life Safety Call Rod Baxter when you get onsite Please Phone #: ###-#### Inspection requested via web by Rod Baxter
|
Inspection Record Card- Bld | | | 7/1/2020 | | DONE |
|
|
|
|
Zoning Approval Temp | 6/25/2020 | 6/25/2020 | 6/25/2020 | | PASS |
Katelyn Menuge
|
|
|
BND20-00103
|
BLD-Framing/Rough-in | 5/18/2020 | 5/19/2020 | 5/19/2020 | A | PASS |
Jim Storey
|
|
|
call Rod Baxter upon arrival to site. Phone #: ###-#### Inspection requested via web by Rod Baxter
|
BLD-Energy code compliance | 4/20/2020 | 4/21/2020 | 4/21/2020 | A | PASS |
Jim Storey
|
|
|
Verify R-Value of 30 at Roof. Rod Baxter Phone #: ###-#### Inspection requested via web by Rod Baxter revised iecc report. ok
|
OVERRIDE | | | 4/9/2020 | | |
|
|
|
|
Plan assigned to (CDM) | 3/26/2020 | 3/26/2020 | 4/9/2020 | | PASS |
Carl D Madsen
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 4/9/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/27/2020 | | 4/9/2020 | | PASS |
Carl D Madsen
|
|
|
Plan Mod
|
Permit Ready to Issue | | | 4/9/2020 | | DONE |
|
|
|
Plan Mod Met
|
Routing - FIRE | 3/27/2020 | 3/27/2020 | 4/3/2020 | | PASS |
Mark Stumbaugh
|
|
|
Plan mod MAS
|
Routing - PLUMBING | 3/27/2020 | | 3/30/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Telephone call | | | 3/27/2020 | | DONE |
|
|
|
306- updated in documents 3/27/2020
|
Plan Modification Accepted | | | 3/26/2020 | | DONE |
|
|
|
A list of items were attached to the plan mod application. (G0003, G004,A101,A102,A201,A202,A311,A312,A601,A801,S101,S102,S103,S104,S123,S124,S201,S203,S204,S205,MH101B,MH201,E101,E201 and E401)
|
BLD-Energy code compliance | 3/17/2020 | 3/18/2020 | 3/18/2020 | P | FAIL |
Jim Storey
|
|
|
Inspection at Roofing Insulation Phone #: ###-#### Inspection requested via web by Rod Baxter r 38 min required.
|
BLD-Wall Bracing | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | PASS |
Jim Storey
|
|
|
Joist Welding Inspection , Tilt Panel Welding Inspection Phone #: ###-#### Inspection requested via web by Rod Baxter// pannel base welds and joist welding in progress.
|
BLD-Footing | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Rod Baxter north end rebar ok wip si pending.
|
BLD-Footing | 2/5/2020 | 2/7/2020 | 2/6/2020 | A | CANC |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rod Baxter Inspection cancelled from web by: Rod Baxter
|
BLD-Footing | 2/4/2020 | 2/5/2020 | 2/5/2020 | P | CANC |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rod Baxter Inspection cancelled from web by: Rod Baxter
|
BLD-Foundation | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | CANC |
Jim Storey
|
|
|
Tilt Panel Inspection. Phone #: ###-#### Inspection requested via web by Rod Baxter
|
BLD-Footing | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PASS |
Jim Storey
|
|
|
Interior Spread Footings Phone #: ###-#### Inspection requested via web by Rod Baxter si on site pending reports rebar pass
|
Issue PAID IN FULL permit | | | 11/8/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/8/2019 | | DONE |
|
|
|
|
Inspector's copy Bld permit | | | 11/8/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/8/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 10/30/2019 | | |
|
|
|
|
Routing - PLANNING | 10/30/2019 | | 10/30/2019 | | PASS |
Leon Letson
|
|
|
|
Permit Ready to Issue | | | 10/30/2019 | | DONE |
|
|
|
ALL MET
GC
Revised Certificate of Value
ACHD see letter attachement to case of what fee owe
|
Plan assigned to (CDM) | 8/28/2019 | 8/28/2019 | 10/29/2019 | | PASS |
Carl D Madsen
|
|
|
Boise Gateway Bldg New
|
Routing Off Site - STRUCTURAL | 10/21/2019 | | 10/29/2019 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/29/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/21/2019 | | 10/29/2019 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Sewer Design | 10/22/2019 | | 10/22/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Drainage | 10/22/2019 | | 10/22/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - Design Review | 10/21/2019 | | 10/22/2019 | | PASS |
Katelyn Menuge
|
|
|
Check with PW Solid waste regarding internal trash room requirements.
|
Routing PW Street Lights | 10/21/2019 | | 10/21/2019 | | PASS |
Tom Marshall
|
|
|
|
Route to Impact Fee Review | 10/10/2019 | 10/13/2019 | 10/11/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 10/10/2019 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/28/2019 | | 10/9/2019 | | FAIL |
Carl D Madsen
|
|
|
Kpff
|
Routing - PLAN CHECK | 8/28/2019 | | 10/9/2019 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 8/28/2019 | | 10/9/2019 | | FAIL |
Leon Letson
|
|
|
ROS19-00086 must be completed prior to sign-off by Planning
|
Routing - FIRE | 8/28/2019 | 8/28/2019 | 9/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
10/08-Boise Gateway IP Building 1 502
|
Routing PW Drainage | 9/9/2019 | | 9/9/2019 | | FAIL |
Brian Murphy
|
|
|
NEED AIRPORT OK ON POND/BIRDS
|
Routing PW Sewer Design | 8/29/2019 | | 9/5/2019 | | FAIL |
DeAnn Brown
|
|
|
Sewer extension plans have not been reviewed and approved by City of Boise Public Works.
|
Routing - MECHANICAL | 8/28/2019 | | 9/4/2019 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 8/28/2019 | | 9/3/2019 | | FAIL |
Katelyn Menuge
|
|
|
See Changemarks. Also need solid waste enclosure, ROS finalized and cross-access to the south
|
Routing - Erosion and Sediment | 8/28/2019 | | 9/3/2019 | | PASS |
Michael Zawacki
|
|
|
Please refewr to esc19-01125
|
Routing PW Street Lights | 8/29/2019 | | 8/30/2019 | | FAIL |
Tom Marshall
|
|
|
Need a streetlight plan.
|
Routing PW Solid Waste | 8/29/2019 | | 8/30/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Environmental | 8/29/2019 | | 8/30/2019 | | PASS |
|
|
|
|
Routing - Addressing | 8/28/2019 | | 8/30/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/28/2019 | | 8/29/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLUMBING | 8/28/2019 | | 8/29/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Intake Approval | | | 8/28/2019 | | PASS |
|
|
|
|
Application received | | | 8/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 23 2019 2:03PM
|
Second Notice | | 8/21/2020 | | | |
|
|
|
|