First Notice | 12/31/2019 | 12/31/2019 | 2/7/2020 | | DONE |
Mike Jordan
|
|
|
mailed 2-10-20
|
BLD-Final | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | PASS |
Mike Jordan
|
|
|
Matt Phone #: ###-####
|
DOC - Permit Finaled | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, space is a vanilla finish so no fire extinguishers, final life fire safety inspection for vanilla TI complete, as stated in the project description, no occupancy allowed under this permit.
Matt Phone #: ###-####
|
VOIDED CHANGE STATUS | | | 12/27/2019 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 12/27/2019 | | DONE |
|
|
|
meant to change status not void
|
Plan assigned to (JG) | 12/18/2019 | 12/18/2019 | 12/23/2019 | | PASS |
Javier Guzman
|
|
|
Plan mod- leave the existing opening between Suite 102 and suite 104. Infill will occur at the a later date when tenant for the space are identified
|
Routing - PLAN CHECK | 12/23/2019 | | 12/23/2019 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 12/23/2019 | | DONE |
|
|
|
Need PLAN MOD
Revised cert of Value from GC (plan mod app states the values is affected)
|
Route to Impact Fee Review | 12/18/2019 | 12/21/2019 | 12/19/2019 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Plan Modification Accepted | | | 12/18/2019 | | DONE |
|
|
|
Plan mod- leave the existing opening between Suite 102 and suite 104. Infill will occur at the a later date when tenant for the space are identified
|
FIRE-Final Inspection | 12/9/2019 | 12/10/2019 | 12/10/2019 | A | FAIL |
Troy Cobbley
|
|
|
Infill the wall between tenants or resubmit plans as discussed.
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PART |
Mike Jordan
|
|
|
Matt Phone #: ###-####. Interior steel stud framed walls and hardlids for new restroom. Mech. permit required for vent. fans in restroom and inspected prior to cover.
|
Inspection Record Card- Bld | | | 10/31/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/31/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 9/11/2019 | 9/11/2019 | 9/18/2019 | | PASS |
Javier Guzman
|
|
|
09/16 L1 Suite 104 - Vanilla ePlan
|
Routing - PLAN CHECK | 9/11/2019 | | 9/18/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 9/11/2019 | | 9/18/2019 | | PASS |
Doug Chausow
|
|
|
sign off in ePlan by Doug C
|
1st review completed | | | 9/18/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/18/2019 | | DONE |
|
|
|
ALL MET
Need GC
Need Rev Val
|
Routing - PUBLIC WORKS | 9/11/2019 | | 9/11/2019 | | PASS |
Morgan Webb
|
|
|
WEST BOISE SEWER DISTRICT
|
Intake Approval | | | 9/10/2019 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 8/26/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 26 2019 6:21AM
|