Second Notice | | 1/9/2020 | 1/10/2020 | | DONE |
|
|
|
This permit finaled on the web by Charlene Meadows
|
First Notice | | 11/30/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
CHANGE STATUS TO (ISS) | | | 11/20/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/20/2019 | | DONE |
|
|
|
|
Permanent Occupancy | | | 11/20/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 11/15/2019 | | |
|
|
|
|
Plan assigned to (M_H) | 11/5/2019 | | 11/15/2019 | | DONE |
Michael Hanson
|
|
|
11/15 plan mod - maclife w/d
|
Routing - PLAN CHECK | 11/15/2019 | | 11/15/2019 | | PASS |
Michael Hanson
|
|
|
1 hour plan mod fee
|
Permit Ready to Issue | | | 11/15/2019 | | DONE |
|
|
|
DO NOT ISSUE- plan mod approved
|
Route to Impact Fee Review | 11/5/2019 | 11/8/2019 | 11/6/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan Modification Accepted | | | 11/5/2019 | | DONE |
|
|
|
plan mod submitted by Doug Cooper of McKibben Cooper Architects. Existing water heater/service sink closet is to remain (permit set shows it to be removed with water heater relocated). Room 102 casework is to be a 3' sink base with sink (permit set shows 8' upper and lower cabinets). Sheets A2.0, A8.0
|
Temporary Occupancy | 11/1/2019 | 1/30/2020 | 11/1/2019 | | DONE |
Brittany Hill
|
|
|
need to turn in and complete plan mod for Mechanical on plans before getting Perm. Occ.
|
BLD-Final | 10/29/2019 | 10/31/2019 | 10/31/2019 | A | PASS |
Mike Jordan
|
|
|
Call on the way // Josh Phone #: ###-####. Ok for perm occ. No card on site to sign. Per contractor no mech work done.
|
FIRE-Final Inspection | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Call for access- Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Mike Jordan
|
|
|
Josh Phone #: ###-####. Interior steel stud framed walls only ok. Also noted that tenant may want to install glass block block were roll up door is located. This will require a plan mod. to plan review for review and possible engineering. This was noted to contractor on site.
|
Issue PAID IN FULL permit | | | 9/26/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/26/2019 | | DONE |
|
|
|
|
Routing - FIRE | 8/28/2019 | 8/28/2019 | 9/24/2019 | | PASS |
Mark Stumbaugh
|
|
|
09/24-MACLIFE TI 520
|
1st review completed | | | 9/24/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 9/24/2019 | | DONE |
|
|
|
Met (walk in)
NEED
GC FORM
REVISED VALUE
|
Plan assigned to (M_H) | 8/28/2019 | | 9/24/2019 | | DONE |
Michael Hanson
|
|
|
09/24 #520 L3 ePlan - MacLife
|
Routing - PLAN CHECK | 8/28/2019 | | 9/24/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing - PLANNING | 8/28/2019 | | 8/29/2019 | | PASS |
David Moser
|
|
|
|
Routing - Addressing | 8/28/2019 | | 8/29/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/28/2019 | | 8/29/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 8/28/2019 | | PASS |
|
|
|
|
Application received | | | 8/26/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 26 2019 4:56PM
|