BLD-Final | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Tell Riley
|
|
|
Call for access Phone #: 2089417066 >> Inspection requested via mobile web by Anthony Day
|
DOC - Permit Finaled | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Blower Door Test Results | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | DONE |
Tell Riley
|
|
|
2.92 ACH 50
|
BLD-Energy code compliance | 12/16/2019 | 12/16/2019 | 12/16/2019 | P | PASS |
Mike Jordan
|
|
|
Anthony Phone #: ###-####
|
BLD-Framing/Rough-in | 12/16/2019 | 12/16/2019 | 12/16/2019 | P | PASS |
Mike Jordan
|
|
|
Anthony Phone #: ###-####
|
BLD-Framing/Rough-in | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | FAIL |
Mike Jordan
|
|
|
Anthony Phone #: ###-####. Complete lateral bracing on T15 trusses. Install the missing MSTA 24 straps at RV bay per the engineering. Provide engineering showing the HDU 4 holdownsx at RV bay are sufficient in leiu of the STDH14. Install the missing STDH10 straps at back patio. Install theSTG224 straps at top plate to beam at back patio. Correction notice posted. Ok to insulate.
|
BLD-Framing/Rough-in | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | NR |
Mike Jordan
|
|
|
Anthony Phone #: ###-####. Mech rough in inspection has failed.
|
BLD-Wall Bracing | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PART |
Mike Jordan
|
|
|
Anthony Phone #: ###-####. missing holdowns at RV bay and rear columns. Ok to tyvek except for those areas.
|
BLD-Foundation | 10/23/2019 | 10/24/2019 | 10/24/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD-Footing | 10/22/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
Issue PAID IN FULL permit | | | 10/16/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/16/2019 | | DONE |
|
|
|
|
Telephone call | | | 10/16/2019 | | |
|
|
|
Emailed permits to be signed to- dallin@tresidio.com and katie@tresidio.com
Eplan will need to be released
|
OVERRIDE | | | 9/23/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 8/27/2019 | 8/27/2019 | 9/23/2019 | | DONE |
|
|
|
09/09 sfd L1 ePlan. 2nd review, failed planning. 1st complete 09/09, need engineering for covered patio, failed planning
|
Routing - PLANNING | 9/23/2019 | | 9/23/2019 | | PASS |
Ethan Mansfield
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 9/23/2019 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 9/20/2019 | | 9/20/2019 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 9/9/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 8/27/2019 | | 9/9/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Route to Impact Fee Review | 8/27/2019 | 8/30/2019 | 8/28/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 8/27/2019 | | 8/28/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Addressing | 8/27/2019 | | 8/28/2019 | | PASS |
Doug Chausow
|
|
|
|
Application received | | | 8/27/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 27 2019 11:29AM
|
Intake Approval | | | 8/27/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/27/2019 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 8/27/2019 | | 8/27/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 8/27/2019 | | | | FAIL |
|
|
|
Please ensure that building on S. Side does not encroach into side yard setback.
|
Routing - PLANNING | 9/17/2019 | | | | FAIL |
|
|
|
Building cannot encroach into setback (see left side as you face building from Kimball)
|