FIRE-Conference | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | DONE |
Troy Cobbley
|
|
|
Jim Ferguson and I spoke about the corrections needed as per my last inspection.
|
BLD-Conference | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | DONE |
Tell Riley
|
|
|
Merinda Phone #: ###-####//discussed changing round door knobs for single action lever type//locking doors will unlock from inside with turn of lever//
|
FIRE-Final Inspection | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the fire extinguisher, remove thumbturn dead bolt at main exit (keyed is ok) and provide sticker, remove round knob at main exit (single action lever type ok). Before 11 // Merinda Phone #: ###-####
|
BLD-Final | 9/4/2019 | 9/6/2019 | 9/5/2019 | A | CANC |
Tell Riley
|
|
|
Before 11 // Merinda Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/4/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 8/27/2019 | 8/27/2019 | 8/30/2019 | | PASS |
Javier Guzman
|
|
|
08/30 L2 >Hawthorn Counseling LLC Occ eval paper
|
Routing - PLAN CHECK | 8/28/2019 | | 8/30/2019 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 8/30/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/30/2019 | | DONE |
|
|
|
met
|
Print Occupancy Form | | | 8/30/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/30/2019 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2019 | | DONE |
|
|
|
Left voicemail for Merinda to inform her that the permit is ready to pick up.
|
Case Summary (BLD) | | | 8/29/2019 | | DONE |
Javier Guzman
|
|
|
|
Routing - Addressing | 8/27/2019 | | 8/28/2019 | | PASS |
Doug Chausow
|
|
|
Suite B
|
Routing - PUBLIC WORKS | | | 8/28/2019 | | PASS |
|
|
|
|
Intake Approval | | | 8/27/2019 | | PASS |
Javier Guzman
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/27/2019 | | DONE |
|
|
|
|
Application received | | 8/27/2019 | | | |
|
|
|
|