Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-03325
StatusFinaled
Name EMPIRE SOLAR GROUP LLC
Site Address 9480 W CASCADE ST
Project NameFackrell 6.51 kW Solar PV
Customer Number 
ePlanReviewYes
Description
MODIFICATION OF WIRING LAYOUT 10-7-19 **jab** Permit for 368sq' of roof-mounted, grid-tied Photo-voltaic panels with optimizers; 21 panels in 4 arrays. No work needed to the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/28/201910/28/201910/28/2019PDONE
DetailsMike Jordan
Jordan Phone #: ###-####
DOC - Permit Finaled10/28/201910/28/201910/28/2019PPASS
DetailsMike Jordan
Change Expiration Date Only  10/10/2019 DONE
permit was mistakenly re-issued on 10/9/19, corrected issue and exp date to original issue date
Inspection Record Card- Bld  10/9/2019 DONE
CHANGE STATUS TO (ISS)  10/9/2019 DONE
Permit Ready to Issue  10/8/2019 DONE
plan mod approved
fees dues
Plan assigned to (JAB) Josh9/30/20199/30/201910/7/2019 PASS
DetailsJosh Bogle
10/04 PV mod, ePlan
Routing - PLAN CHECK10/1/2019 10/7/2019 PASS
DetailsJosh Bogle
1/2hr PR fee
Plan Modification Accepted  9/30/2019 DONE
plan mod accepted in e plan-assigned to JAB-changes to line and electrical
Issue PAID IN FULL permit  9/5/2019 DONE
Inspection Record Card- Bld  9/5/2019 DONE
CHANGE ISSUED DATE  9/5/2019 DONE
permit was mistakenly re-issued on 10/9/19, corrected issue date to original issue date
Plan assigned to (JAB) Josh8/28/20198/28/20199/4/2019 PASS
DetailsJosh Bogle
Routing - PLAN CHECK8/28/2019 9/4/2019 PASS
DetailsJosh Bogle
1st review completed  9/4/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  9/4/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  9/4/2019 DONE
Need
GC Form (number provided on application is not the RCE/RCT number)
Telephone call  9/4/2019 DONE
emailed ashleigh informing her that we will need the rce/rct number. nothing came up in the search for 026803 (on application) for either
Telephone call  9/4/2019 DONE
Sent email to permits@empiresolargroup.com:
Good afternoon –

I see that you have paid the fees for the subject permit. Thank you! However, we cannot issue this permit without a General Contractor’s Declaration form (form 302 – attached here) as the RCE/RCT listed on your application is not registered with the Idaho Bureau of Occupational Licenses (https://secure.ibol.idaho.gov/eIBOLPublic/LPRBrowser.aspx). Only someone registered in the state of Idaho or the parcel owner can pull a building permit.

Please let me know if you have any questions -
Application received  8/28/2019 DONE
Application submitted via PDS Online on Aug 28 2019 1:27PM
Plans ACCEPTED BY PLAN TECH  8/28/2019 DONE
Intake Approval  8/28/2019 PASS
Recd Pcfee & Taken To Pln CK  8/28/2019 DONE
Routing - PLANNING8/28/2019 8/28/2019 PASS
DetailsSue Cummings