Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-03329
StatusFinaled
Name MARCUS BEZUHLY
Site Address 205 N 10TH ST Unit: STE 110
Project NameEdge Brewing Co
Customer Number 
ePlanReviewNo
Description
(EDGE BREWING CO - SUITE #110) ** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for an existing 3,113 square foot restaurant tenant space. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. This tenant space was last occupied by “WILLOW CREEK GRILL” under BLD17-00770. New construction is note allowed under this permit. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  9/24/2019 DONE
BLD-Final9/19/20199/20/20199/20/2019PPASS
DetailsBrandon Shaw
MARCUS Phone #: ###-####
DOC - Permit Finaled9/20/20199/20/20199/20/2019PPASS
DetailsBrandon Shaw
FIRE-Final Inspection9/19/20199/20/20199/20/2019APASS
DetailsJim Page
Previously noted items have been corrected, no fire sprinkler modifications, no fire alarm modifications, no hood suppression system modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete, signatures provided on signature card for associated trades.

MARCUS Phone #: ###-####
FIRE-Final Inspection9/13/20199/16/20199/17/2019AFAIL
DetailsTroy Cobbley
Provide certification for the hood suppression system, provide annual inspections for the fire extinguishers, lower the fire extinguisher on the main floor, repair the two exit signs/emergency lights, provide occupant load sign

Call ahead // Tony Phone #: ###-####
BLD-Final9/17/20199/17/20199/17/2019ACANC
DetailsDave Hannah
Call ahead // Tony Phone #: ###-####
BLD-Final9/12/20199/16/20199/17/2019PCANC
DetailsDave Hannah
Call ahead // Tony Phone #: ###-####
FIRE-Final Inspection9/12/20199/13/20199/13/2019PCANC
DetailsJim Page
Rescheduled for 16SEPT2019 for the AM per conversation with point of contact, this request is cancelled.

Call ahead // Tony Phone #: ###-####
Issue PAID IN FULL permit  9/10/2019 DONE
Plan assigned to (JHB)8/29/20198/29/20199/6/2019 PASS
DetailsJoe Bruce
528 - Edge Brewing
Routing PW Environmental8/30/2019 9/6/2019 PASS
Details
Routing - PLAN CHECK9/6/2019 9/6/2019 PASS
DetailsJoe Bruce
1st review completed  9/6/2019 DONE
DetailsJoe Bruce
PLANS/APPL TAKEN TO FRONT DESK  9/6/2019 DONE
Case Summary (BLD)  9/6/2019 DONE
DetailsJoe Bruce
Permit Ready to Issue  9/6/2019 DONE
met
Print Occupancy Form  9/6/2019 DONE
Telephone call  9/6/2019 DONE
Spoke with Marcus to inform him the permit is ready to pick up. He informed me a co worker might come to pick the permit instead of him.
Routing PW Solid Waste9/5/2019 9/5/2019 PASS
DetailsEvan Carpenter
Routing - Addressing8/28/2019 8/30/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/28/2019 8/30/2019 PASS
DetailsAngela Hardy
Plans ACCEPTED BY PLAN TECH  8/28/2019 DONE
Intake Approval  8/28/2019 PASS
DetailsJoe Bruce
Recd Pcfee & Taken To Pln CK  8/28/2019 DONE
First Notice 10/4/2019   
First Notice9/20/20199/20/2019   
DetailsBrandon Shaw
Application received 8/28/2019