Permanent Occupancy | | | 9/24/2019 | | DONE |
|
|
|
|
BLD-Final | 9/19/2019 | 9/20/2019 | 9/20/2019 | P | PASS |
Brandon Shaw
|
|
|
MARCUS Phone #: ###-####
|
DOC - Permit Finaled | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, no fire sprinkler modifications, no fire alarm modifications, no hood suppression system modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete, signatures provided on signature card for associated trades.
MARCUS Phone #: ###-####
|
FIRE-Final Inspection | 9/13/2019 | 9/16/2019 | 9/17/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide certification for the hood suppression system, provide annual inspections for the fire extinguishers, lower the fire extinguisher on the main floor, repair the two exit signs/emergency lights, provide occupant load sign
Call ahead // Tony Phone #: ###-####
|
BLD-Final | 9/17/2019 | 9/17/2019 | 9/17/2019 | A | CANC |
Dave Hannah
|
|
|
Call ahead // Tony Phone #: ###-####
|
BLD-Final | 9/12/2019 | 9/16/2019 | 9/17/2019 | P | CANC |
Dave Hannah
|
|
|
Call ahead // Tony Phone #: ###-####
|
FIRE-Final Inspection | 9/12/2019 | 9/13/2019 | 9/13/2019 | P | CANC |
Jim Page
|
|
|
Rescheduled for 16SEPT2019 for the AM per conversation with point of contact, this request is cancelled.
Call ahead // Tony Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/10/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 8/29/2019 | 8/29/2019 | 9/6/2019 | | PASS |
Joe Bruce
|
|
|
528 - Edge Brewing
|
Routing PW Environmental | 8/30/2019 | | 9/6/2019 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/6/2019 | | 9/6/2019 | | PASS |
Joe Bruce
|
|
|
|
1st review completed | | | 9/6/2019 | | DONE |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2019 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/6/2019 | | DONE |
Joe Bruce
|
|
|
|
Permit Ready to Issue | | | 9/6/2019 | | DONE |
|
|
|
met
|
Print Occupancy Form | | | 9/6/2019 | | DONE |
|
|
|
|
Telephone call | | | 9/6/2019 | | DONE |
|
|
|
Spoke with Marcus to inform him the permit is ready to pick up. He informed me a co worker might come to pick the permit instead of him.
|
Routing PW Solid Waste | 9/5/2019 | | 9/5/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing - Addressing | 8/28/2019 | | 8/30/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/28/2019 | | 8/30/2019 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/28/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/28/2019 | | PASS |
Joe Bruce
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/28/2019 | | DONE |
|
|
|
|
First Notice | | 10/4/2019 | | | |
|
|
|
|
First Notice | 9/20/2019 | 9/20/2019 | | | |
Brandon Shaw
|
|
|
|
Application received | | 8/28/2019 | | | |
|
|
|
|