BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | DONE |
Jim Storey
|
|
|
Melissa Phone #: ###-####
|
BLD-Final | 9/5/2019 | 9/5/2019 | 9/5/2019 | P | PASS |
Jim Storey
|
|
|
|
Permanent Occupancy | | | 9/5/2019 | | DONE |
|
|
|
|
BLD-Final | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | FAIL |
Jim Storey
|
|
|
Call ahead 30 minutes (in Meridian) // Melissa Phone #: ###-#### miossing exit sign on the wrong side of exit path/ single function hardware exit path anf door to restaroom.
|
FIRE-Final Inspection | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Jim Page
|
|
|
Previously noted item has been correted, new batteries were being installed in exit lights at time of inspection. No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete, card has been signed.
Melissa Phone #: ###-####
|
FIRE-Final Inspection | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | FAIL |
Jim Page
|
|
|
Service all exit signs (total of 4) as discussed, all exit lights did not operate with test button, lost internal illumination when disconnected from AC power.
Call 30 minute ahead (in Meridian) // Melissa Phone #: ###-####
|
Plan assigned to (BJM) | 8/28/2019 | 8/28/2019 | 9/3/2019 | | DONE |
Brian McGowan
|
|
|
09/05- Occupancy
|
Routing - PLAN CHECK | 8/30/2019 | | 9/3/2019 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 9/3/2019 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/3/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/3/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/3/2019 | | DONE |
|
|
|
met
|
Print Occupancy Form | | | 9/3/2019 | | DONE |
|
|
|
|
Telephone call | | | 9/3/2019 | | DONE |
|
|
|
Spoke with Jennifer to inform her the permit is ready to pick up.
|
Issue PAID IN FULL permit | | | 9/3/2019 | | DONE |
|
|
|
|
Routing - Addressing | 8/28/2019 | | 8/30/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/30/2019 | | 8/30/2019 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/28/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/28/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/28/2019 | | PASS |
|
|
|
|
First Notice | | 9/15/2019 | | | |
|
|
|
|
Application received | | 8/28/2019 | | | |
|
|
|
|