Temporary Occupancy | 7/9/2020 | 10/7/2020 | 7/9/2020 | | DONE |
Brittany Hill
|
|
|
|
FIRE-Alarm Testing | 7/2/2020 | 7/2/2020 | 7/8/2020 | P | DONE |
Jim Page
|
|
|
Alarm testing and life safety completed for phase 1 completed on 02JULY2020.
Fire Alarm couldn''t get their inspection in until pm today so I''m moving this inspection from am to pm. ALso, Fire sprinkler and Structural are scheduled for PM as well Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
PubWorks Temp Occupancy Appr | 7/6/2020 | 7/6/2020 | 7/6/2020 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval Temp | 7/6/2020 | 7/6/2020 | 7/6/2020 | | DONE |
Josh Wilson
|
|
|
Temp occ ok for Phase I per the approved phasing plan.
|
BLD-Final | 7/2/2020 | 7/2/2020 | 7/2/2020 | P | PART |
Brandon Shaw
|
|
|
Phase I complete, TCO is approved...
|
FIRE-Final Inspection | 7/2/2020 | 7/2/2020 | 7/2/2020 | P | PART |
Jim Page
|
|
|
Fire sprinkler and fire alarm inspections for TCO phase 1 complete, fire extinguishers for phase 1 are placed. Final life fire safety inspection for TCO phase 1 complete, signatures provided on temporary line for phase 1.
Fire Alarm couldn''t get their inspection in until pm today so I''m moving this inspection from am to pm. ALso, Fire sprinkler and Structural are scheduled for PM as well Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Final | 7/1/2020 | 7/2/2020 | 7/2/2020 | P | CANC |
Brandon Shaw
|
|
|
Buidling B final See phasing plan approved by the city on 6-15 Call when on site Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
FIRE-Final Inspection | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | CANC |
Jim Page
|
|
|
Building B fire sprinkler final See approved phasing plan approved by the city on 6-15 Call Brandon when on site Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
BLD-Grading Inspection | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | CANC |
Brandon Shaw
|
|
|
This is inspection for TCO for Building B. Landscaping will be completed in phase 2 as submitted and apporved in the phasing plan on 6-15. All ADA stalls are striped and sidewalk is in Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
FIRE-Final Inspection | 6/30/2020 | 7/1/2020 | 7/1/2020 | P | CANC |
Troy Cobbley
|
|
|
This is Fire Life Safety inspection for Building B Phase 1 as shown on the phasing plan. Phasing Plan was submitted, reviewed and approved on 6-15. We would like to have this inspection done after 3pm but realize requesting a time is not garaunteed. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
Print Occupancy Form | | | 6/30/2020 | | DONE |
|
|
|
|
Telephone call | | | 6/30/2020 | | DONE |
|
|
|
Per Carl W - OK to issue TCO.
Jack Reynolds called. It appears tenant wants to get a TCO for Building B. The intent is to move staff who are already occupying Building A into Building B, and then remodeling Building A. Seeking clarification from Christina and Carl W.
|
BLD-Ceiling Grid Inspection | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | PASS |
Jim Storey
|
|
|
See Phasing plan approved by plan review in agency comments section. Ceiling grid inspection for building B. Inspection for cover at ceiling grid. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Energy code compliance | 4/20/2020 | 4/20/2020 | 4/20/2020 | P | PASS |
Brandon Shaw
|
|
|
Brandon Reynolds I''m back from Vaca and see only a partial on energy code compliance. Jimmie was on site last and I''m not sure what got inspected and what didn''t. Drywallers are here and hanging one side. Please give me a call when on site and we can verbally review. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Wall cover | 4/20/2020 | 4/20/2020 | 4/20/2020 | P | CANC |
Brandon Shaw
|
|
|
Looking for approval to cover walls both sides. All MEP inspections are complete. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
BLD-Energy code compliance | 3/27/2020 | 3/30/2020 | 3/30/2020 | A | PART |
Brandon Shaw
|
|
|
Building B Exterior Wall Insulation Inspection for Energy code compliance.
|
BLD-Wall cover | 3/19/2020 | 3/20/2020 | 3/20/2020 | P | PASS |
Jim Storey
|
|
|
Inspection to cover one side of walls in building B. Phone #: ###-#### Inspection requested via web by Jimmie Miller interior walls only
|
BLD-Wall cover | 3/17/2020 | 3/19/2020 | 3/19/2020 | P | DEFR |
Jim Storey
|
|
|
Inspection to cover one side of walls in building B. Phone #: ###-#### Inspection requested via web by Jimmie Miller
|
BLD-Framing/Rough-in | 3/12/2020 | 3/16/2020 | 3/16/2020 | P | PART |
Brandon Shaw
|
|
|
Nailing inspeciton on Ped walkway between building B and A. I dont believe it''s a shearwall but we''ll want to make sure inspector doesn''t want to see roof or walls before they are covered with roofing and stucco Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Wall cover | 3/11/2020 | 3/17/2020 | 3/12/2020 | P | CANC |
Brandon Shaw
|
|
|
Framing interior wall inspection for cover. Building B Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
BLD-Framing/Rough-in | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PART |
Brandon Shaw
|
|
|
This is to inspect the walls and roof which werent complete the last time Brandon was on site. Inpsect walls, Nail pattern and holdowns on walls and roof from Grid 3, East.
|
Telephone call | | | 2/27/2020 | | DONE |
|
|
|
email fees for plan mod to jesse.walker@cshqa.com
|
CHANGE STATUS TO (ISS) | | | 2/27/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/26/2020 | | |
|
|
|
|
Plan assigned to (CJW) | 2/10/2020 | 2/10/2020 | 2/26/2020 | | PASS |
Carl Westfall
|
|
|
plan mod (delta dental) (routed to staff)
|
Plan Reviewer's activity | | | 2/26/2020 | | PASS |
|
|
|
Plan mod approved
|
Permit Ready to Issue | | | 2/26/2020 | | DONE |
|
|
|
DO NOT ISSUE- plan mod
MET
***NEED REVISED VALUE*** PLAN MOD
|
Routing - PLANNING | 2/18/2020 | | 2/26/2020 | | PASS |
David Moser
|
|
|
See DRH19-00054 and DRH20-00014
|
Routing - Design Review | 2/18/2020 | | 2/26/2020 | | PASS |
Josh Wilson
|
|
|
Ok per DRH20-00014
|
Routing PW Environmental | 2/24/2020 | | 2/25/2020 | | PASS |
Zach Conde
|
|
|
|
Routing - PLAN CHECK | 2/20/2020 | | 2/24/2020 | | PASS |
Carl Westfall
|
|
|
Back from the permits desk and routing started. Plan mod review approved.
|
Routing PW Drainage | 2/18/2020 | | 2/24/2020 | | PASS |
Brian Murphy
|
|
|
PLAN MOD
|
Routing - PUBLIC WORKS | 2/18/2020 | | 2/24/2020 | | PASS |
Candy A. Nichols
|
|
|
PLAN MOD-NO NEW PLUMBING
|
Routing - PLAN CHECK | 2/14/2020 | | 2/18/2020 | | DONE |
Carl Westfall
|
|
|
Plan mod plan intake review passed. Sent to permits desk for fees.
|
BLD-Framing/Rough-in | 2/13/2020 | 2/14/2020 | 2/14/2020 | A | PART |
Brandon Shaw
|
|
|
No framing, exterior shear... Ok to cover, see plans fot area inspected...
|
Plan Modification Accepted | | | 2/14/2020 | | DONE |
|
|
|
Workflow received
|
BLD-Framing/Rough-in | 2/12/2020 | 2/13/2020 | 2/13/2020 | P | CANC |
Jim Storey
|
|
|
CANCEL ON 2-13-20 AND RESC Brandon Phone #: ###-####
|
Plan Modification Accepted | | | 2/10/2020 | | DONE |
|
|
|
Delta Dental of Idaho would like to add a standby generator in the event of a power outage. The generator will be fully screened in a CMU enclosure. the materials will match the new building Building B and the onsite garbage enclosure
|
BLD-Conference | 1/31/2020 | 2/6/2020 | 2/5/2020 | A | CANC |
Brandon Shaw
|
|
|
Requesting to meet with electrical, building and fire life saety inspectors at 10am to review building Occupency plan. On site. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
FIRE-Conference | 1/31/2020 | 2/6/2020 | 2/5/2020 | A | CANC |
Jim Page
|
|
|
Requesting to meet with electrical, building and fire life saety inspectors at 10am to review building Occupency plan. On site. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
BLD-Foundation | 12/9/2019 | 12/10/2019 | 12/10/2019 | A | PASS |
Brandon Shaw
|
|
|
Pending special inspection... Work in progress...
|
BLD-Footing | 11/27/2019 | 12/2/2019 | 12/2/2019 | A | PART |
Brandon Shaw
|
|
|
Pending special inspection... Work in progress...
|
Issue PAID IN FULL permit | | | 11/15/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/15/2019 | | DONE |
|
|
|
|
Telephone call | | | 11/14/2019 | | DONE |
|
|
|
send email to GC to- dominickf@cmcompany.com inform them that they need to contact ACHD regarding fees
|
OVERRIDE | | | 11/13/2019 | | |
|
|
|
|
Plan assigned to (CJW) | 9/5/2019 | 10/16/2019 | 11/13/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 10/09/19 (New Building - 25 days) (eplan - 128 sheets) Delta Dental of Idaho - Building A/B (routed to staff)
|
Routing - PLAN CHECK | 11/13/2019 | | 11/13/2019 | | PASS |
Carl Westfall
|
|
|
Issue resolved with a document and a phone call
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/13/2019 | | DONE |
|
|
|
DO NOT ISUUE WITHOUT BLD19-04140
met
*ACHD
MET-
GC
Revised Certificate of Value
|
Routing Off Site - STRUCTURAL | 11/5/2019 | | 11/13/2019 | | PASS |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Routing - FIRE | 11/5/2019 | 11/5/2019 | 11/12/2019 | | PASS |
Mark Stumbaugh
|
|
|
11/13 Resubmittal Delta Dental
|
Routing - Design Review | 11/5/2019 | | 11/7/2019 | | PASS |
Josh Wilson
|
|
|
two parking spaces turned into loading zones OK JGW
|
Routing PW Sewer Rating | 11/5/2019 | | 11/6/2019 | | PASS |
Morgan Webb
|
|
|
A shower removed
|
Routing - MECHANICAL | 11/5/2019 | | 11/6/2019 | | PASS |
Troy James
|
|
|
HVAC changes
|
Routing - PLUMBING | 11/5/2019 | | 11/6/2019 | | PASS |
Daryl Spivey
|
|
|
Redesign of shower rooms
|
Routing - PLAN CHECK | 10/31/2019 | | 11/5/2019 | | FAIL |
Carl Westfall
|
|
|
One item not resolved. See the plan review report. Email sent to the Architect.
|
Plan resubmittals received | | | 10/31/2019 | | DONE |
|
|
|
Resubmitted late on a Thursday night. Plans Examiner was out of the office until Tuesday. There was no time to route the drawings before he left.
|
Route to Impact Fee Review | 10/21/2019 | 10/24/2019 | 10/22/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals requested | | | 10/21/2019 | | DONE |
|
|
|
|
Routing - FIRE | 9/5/2019 | 10/16/2019 | 10/18/2019 | | FAIL |
Mark Stumbaugh
|
|
|
10/16 (502) Delta Dental of Idaho Addition
|
1st review completed | | | 10/18/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/18/2019 | | 10/16/2019 | | FAIL |
Carl Westfall
|
|
|
|
Routing - Design Review | 9/18/2019 | | 10/2/2019 | | PASS |
Josh Wilson
|
|
|
Ok per DRH19-00054
|
Routing Off Site - STRUCTURAL | 9/18/2019 | | 9/24/2019 | | FAIL |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Routing - PLANNING | 9/18/2019 | | 9/20/2019 | | PASS |
David Moser
|
|
|
See DRH19-00054
|
Routing - MECHANICAL | 9/18/2019 | | 9/20/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Street Lights | 9/18/2019 | | 9/19/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 9/18/2019 | | 9/19/2019 | | PASS |
DeAnn Brown
|
|
|
New building to connect to existing sewer stub
|
Routing PW Solid Waste | 9/18/2019 | | 9/18/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 9/18/2019 | | 9/18/2019 | | PASS |
Brian Murphy
|
|
|
GRADING PLAN APPROVED
|
Routing - Addressing | 9/18/2019 | | 9/18/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/18/2019 | | 9/18/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 9/18/2019 | | 9/18/2019 | | PASS |
Michael Zawacki
|
|
|
Site prep inspection required.
|
Routing - PLUMBING | 9/18/2019 | | 9/18/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 9/5/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 9/3/2019 | | FAIL |
Javier Guzman
|
|
|
Previous request not addressed (I have tried viewing in different internet browser with no success, it is the responsible person in charge to upload these mechanical plans so that they are viewable. contact the mechanical firm and coordinate how to make the stamp viewable on all the mechanical plans)
Provide and upload the following for prescreen:
•All the uploaded mechanical plans engineering stamp is blackened and will not show the engineers information, number, signature, date when printed revise so the engineering stamp is not blackened.
|
Intake Approval | | | 8/30/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following for prescreen:
• Provide a signed and approved by PDS Subdivision Staff Verification of Legal Lot or Parcel form (form uploaded is not signed)
• Provide site specific fire flow at hydrants letter from Suez Water or other public water provider
• Provide DR/Planning & Zoning letters of approval.
• Provide Drainage System Operation & Maintenance Plan Agreement (appendix J from Public Works Stormwater Manual) Must be completely filled out and notarized prior to submittal.
• Provide an Erosion & Sediment Control (ESC) Narrative, Narrative must be designed for the specific project and be prepared and signed by a plan designer certified by Boise City.
• Provide on checklist location of the commissioning plan
• All the uploaded mechanical plans engineering stamp is blackened and will not show the engineers information, number, signature, date when printed revise so the engineering stamp is not blackened.
|
Application received | | | 8/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 29 2019 9:13AM
|