Information based on query as of Tuesday, June 18, 2024.
Permit Information
Permit NumberBLD19-03353
StatusFinaled
Name EMPOWERED SOLAR LLC
Site Address 1027 S LUSK ST
Project NameBoise Bicycle Project - Solar
Customer Number 
ePlanReviewYes
Description
BOISE BICYCLE PROJECT – ROOFTOP SOLAR PANELS) //12-11-2019 PLAN MODIFICATION TO CHANGE SOLAR PANEL PLACEMENT ON THE ROOF. JG// Permit is to add 28 grid-tied rooftop (ballasted mounted) solar panels. Approval contingent upon adhering to the approved plans on file, structural engineering, and manufactures installation instructions. Work to include: installation of solar panels and associated electrical work. Note: Separate electrical permit required. This building is Not fire sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/6/2020 DONE
BLD-Final2/11/20202/11/20202/11/2020PPASS
DetailsJim Storey
Please call ahead and I can meet onsite. Thanks Phone #: ###-#### Inspection requested via web by Alex McKinley
DOC - Permit Finaled2/11/20202/11/20202/11/2020PPASS
DetailsJim Storey
CHANGE STATUS TO (ISS)  12/13/2019 DONE
Plan assigned to (JG)12/6/201912/6/201912/12/2019 PASS
DetailsJavier Guzman
12/17 plan mod Boise Bicycle Project - Solar ePlan
Routing - PLAN CHECK12/11/2019 12/12/2019 PASS
DetailsJavier Guzman
Permit Ready to Issue  12/12/2019 DONE
plan mod approved
Routing - FIRE12/11/201912/11/201912/11/2019 PASS
DetailsMark Stumbaugh
plan mod Boise Bicycle Project - Solar ePlan
Plan Modification Accepted  12/6/2019 DONE
plan mod requested by Alex McKinley from Empowered Solar. As builts for solar panel. Sheet PV2
FIRE-Final Inspection11/27/201911/27/201911/27/2019PPASS
DetailsJim Page
Final life fire safety inspection for scope of work complete, as-builts will be submitted showing solar panel reconfiguration, spacing requirements still met per building permit fire code review comments.

Can meet on site, please call with as much notice as possible. Thanks Phone #: ###-#### Inspection requested via web by Alex McKinley
Fees Due Hold10/15/2019 11/27/2019 DONE
DetailsTiffany Carson-Herker
Telephone call  10/21/2019 DONE
GC sent signed permit but the fees have not been paid so i emailed the fees du to -alex@empowered.solar
it looks lijke Gemma had also contacted them before
Telephone call  10/14/2019 DONE
Called and emailed Alex that additional fees were erroneously not assesed when they paid for the permit $159.73 is due
Plan assigned to (JG)9/5/20199/5/201910/11/2019 PASS
DetailsJavier Guzman
2nd rev, 09/24 (L3 - ePlan) BBP Solar Panels
Routing - PLAN CHECK10/8/2019 10/11/2019 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  10/11/2019 DONE
Permit Ready to Issue  10/11/2019 DONE
Need GC
Issue PAID IN FULL permit  10/11/2019 DONE
emailed the permit to be signed and sent back to alex@empowered.solar as well as the rec of payment and asked him in the email to send back to permits@cityofbboise.org
Routing - FIRE10/8/201910/8/201910/10/2019 PASS
DetailsMark Stumbaugh
Route to Impact Fee Review9/27/20199/30/201910/1/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Routing - FIRE9/5/20199/5/20199/26/2019 FAIL
DetailsMark Stumbaugh
10/02-BBP Solar Panels 520
1st review completed  9/26/2019 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK9/5/2019 9/20/2019 PASS
DetailsJavier Guzman
Routing - Design Review9/5/2019 9/11/2019 PASS
DetailsJosh Wilson
Intake Approval  9/4/2019 PASS
DetailsJavier Guzman
Prescreen approved by JG.
Intake Approval  8/30/2019 FAIL
DetailsJavier Guzman
Provide and upload the following for prescreen:
• Provide Design Review/Planning Zoning approval documents.
• Provide structural calculations stamped, signed and dated by an Idaho licensed engineer showing that the existing roof structure can support the additional gravity/dead load weight of the ballasted solar panels system. If new solar ballasted system increases the design gravity load more than 5% structurally, provide engineered plans and calculations for new elements that will strengthen, supplement, or replace existing load-carrying members as needed.
Telephone call  8/30/2019 DONE
Received revised certificate of value from applicant to include total value of project (including value of donated materials). Fee will be based on Boise City PV Policy.
Application received  8/29/2019 DONE
Application submitted via PDS Online on Aug 29 2019 1:07PM