BLD-Final | 4/14/2020 | 4/15/2020 | 4/15/2020 | A | PASS |
Tell Riley
|
|
|
HVAC final inspection ok. Hinges on garage man door adjusted. Thanks! Phone #: ###-#### Inspection requested via web by Alex Macdonald//corrections made//
|
DOC - Permit Finaled | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Blower Door Test Results | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | DONE |
Tell Riley
|
|
|
3.15 ACH 50
|
BLD-Final | 4/11/2020 | 4/14/2020 | 4/14/2020 | A | FAIL |
Tell Riley
|
|
|
Garage code 8118. Thanks! Phone #: ###-#### Inspection requested via web by Alex Macdonald//completed walk through, adjust garage man door hinges to fully close door, mechanical permit has not been finaled//
|
BLD-Energy code compliance | 2/8/2020 | 2/10/2020 | 2/10/2020 | A | PASS |
Tell Riley
|
|
|
My apologies the truss engineering was not onsite. They are now on a stud in the garage. Thanks! Phone #: ###-#### Inspection requested via web by Alex Macdoanld
|
BLD-Energy code compliance | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | FAIL |
Tell Riley
|
|
|
Insulation inspection prior to sheetrock. Phone #: ###-#### Inspection requested via web by Alex Macdoanld//need truss engineering//noted from previous inspection//
|
BLD-Framing/Rough-in | 1/30/2020 | 1/31/2020 | 1/31/2020 | P | PEND |
Brandon Shaw
|
|
|
Provide truss Engineering at next inspection... OK to insulate...
|
BLD-Other | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | PASS |
Dave Hannah
|
|
|
Inspection for fire rated soffits on the west side of home Phone #: ###-#### Inspection requested via web by Alex Macdoanld
|
BLD-Other | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | NR |
Tell Riley
|
|
|
Inspection for fire rated soffits on the west side of home. Phone #: ###-#### Inspection requested via web by Alex Macdoanld//needs soffits installed//overhang needs cut back to meet the 2 feet min setback for overhangs per the plans//
|
BLD-Wall Bracing | 11/25/2019 | 11/26/2019 | 11/26/2019 | A | PASS |
Tell Riley
|
|
|
Ready anytime Phone #: ###-#### Inspection requested via web by Alex Macdonald
|
BLD-Foundation | 10/8/2019 | 10/9/2019 | 10/9/2019 | P | PASS |
Tell Riley
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD-Footing | 10/8/2019 | 10/8/2019 | 10/8/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
OVERRIDE | | | 10/1/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 8/29/2019 | 8/29/2019 | 10/1/2019 | | DONE |
Jenny Nelson
|
|
|
09/11 sfd L1 ePlan. 3rd review, engineering still needed. 2nd reveiw, need full size sheets, covered patio engineering. 1st complete, covered patio engineering, 1 hour soffit, girder trusses
|
Issue PAID IN FULL permit | | | 10/1/2019 | | DONE |
|
|
|
emailed empireconstructionllc@gmail.com to sign permits and send back
|
Inspection Record Card- Bld | | | 10/1/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/1/2019 | | 10/1/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 10/1/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/17/2019 | | 9/17/2019 | | FAIL |
Jenny Nelson
|
|
|
|
1st review completed | | | 9/10/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLANNING | 9/10/2019 | | 9/10/2019 | | PASS |
Ethan Mansfield
|
|
|
Site Plan approved via PUD18-00039 shows 3' west side setback
|
Routing - PLAN CHECK | 8/29/2019 | | 9/10/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Route to Impact Fee Review | 8/29/2019 | 9/1/2019 | 8/30/2019 | | PASS |
Eric Bilimoria
|
|
|
Can not find the parcel in the GIS system, the building permit may have been assigned a temporary parcel number
|
Routing - MECHANICAL | 8/29/2019 | | 8/30/2019 | | FAIL |
Troy James
|
|
|
Emailed corrections to Integrity.
|
Routing - Addressing | 8/29/2019 | | 8/30/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/29/2019 | | 8/30/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 8/30/2019 | | 8/30/2019 | | PASS |
Troy James
|
|
|
|
Application received | | | 8/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 29 2019 2:18PM
|
Plans ACCEPTED BY PLAN TECH | | | 8/29/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/29/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/29/2019 | | PASS |
|
|
|
|
Routing - PLANNING | 8/29/2019 | | | | FAIL |
|
|
|
West side setback must be 5', not 3' as shown on site plan.
|