BLD-Final | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | PASS |
Mike Jordan
|
|
|
Screened- Sam Phone #: ###-####
|
BLD-Blower Door Test Results | 4/7/2020 | 4/7/2020 | 4/7/2020 | A | DONE |
Mike Jordan
|
|
|
4.6
|
DOC - Permit Finaled | 4/7/2020 | 4/7/2020 | 4/7/2020 | P | PASS |
Mike Jordan
|
|
|
|
Override - Parcel Holds | 4/6/2020 | 1/1/1900 | 4/6/2020 | | |
|
|
|
final inspection on existing building permit
|
BLD-Energy code compliance | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Framing/Rough-in | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####. All framing correction have been made. Ok to insulate.
|
Override - Parcel Holds | 1/15/2020 | 1/1/1900 | 1/15/2020 | | |
|
|
|
override
|
BLD-Framing/Rough-in | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | FAIL |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Complete lateral bracing on F04 and A02 trusses. Fireblock either side of archway in hall and concelled space at ceiling next to archway. Strap double top plate break at beam seat from beam in garage. Install the 4 simpson screws into each stud for the 2x12 ledger connection. Anchor bolts required for the interior bearing wall in garage. Did the inteior thickend footing get placed with slab? Correction notice posted. Ok to insulate.
|
BLD-Wall Bracing | 12/11/2019 | 12/12/2019 | 12/12/2019 | A | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
Override - Parcel Holds | 12/11/2019 | 1/1/1900 | 12/11/2019 | | |
|
|
|
.
|
BLD-Foundation | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | CANC |
Mike Jordan
|
|
|
pour at 1:30 // SAm Phone #: ###-####
|
BLD-Footing | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PASS |
Mike Jordan
|
|
|
pour at 1:30 // SAm Phone #: ###-####
|
BLD-Footing | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | FAIL |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Column pad footings not the min. 10 inches deep per the approved plans. Also noted that ground, rebar and form work below the min. 34 degress required for concrete placement.
|
Override - Parcel Holds | 11/21/2019 | 1/1/1900 | 11/21/2019 | | |
|
|
|
not splitting lot
|
Override - Parcel Holds | 11/21/2019 | 1/1/1900 | 11/21/2019 | | |
|
|
|
parcel not being divided
|
Issue PAID IN FULL permit | | | 11/19/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/19/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 10/4/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 9/17/2019 | 9/17/2019 | 10/4/2019 | | DONE |
Jenny Nelson
|
|
|
09/26 sfd L1 ePlan. 1st complete 9/25, sheet size
|
Routing - PLAN CHECK | 10/4/2019 | | 10/4/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2019 | | DONE |
Jenny Nelson
|
|
|
|
Override - Parcel Holds | | | 10/4/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 10/4/2019 | | DONE |
|
|
|
met
|
1st review completed | | | 9/25/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 9/13/2019 | | 9/25/2019 | | FAIL |
Jenny Nelson
|
|
|
see Brent Moore for questions on parcel hold, sheet sizes
|
Routing - MECHANICAL | 9/13/2019 | | 9/17/2019 | | PASS |
Troy James
|
|
|
Electric cadet wall heaters. No manual j report. Redlined floor plan to provide mechanical ventilation per the IRC section 1507.
|
Route to Impact Fee Review | 9/13/2019 | 9/16/2019 | 9/16/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan assigned to (RDP) | 9/13/2019 | 9/13/2019 | 9/13/2019 | | DEFR |
Rob Patrick
|
|
|
|
Routing - PLANNING | 9/13/2019 | | 9/13/2019 | | PASS |
Jeff Lowe
|
|
|
Verified okay to approve (913-19)
|
Routing - Addressing | 9/13/2019 | | 9/13/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/13/2019 | | 9/13/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 9/13/2019 | | PASS |
|
|
|
Brent Moore ok'd us to start review with the parcel hold on parcel buit wanted the parcel notes left in there
|
Override - Parcel Holds | | | 9/13/2019 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/13/2019 | | DONE |
|
|
|
|
Telephone call | | | 9/12/2019 | | DONE |
|
|
|
sent email to Cody R & Brent M to see if we can remove the parecel hold. PLEASE DO NOT PROCEED until we verify it's ok
9-13-19-Bent M ok'd us to take in the permit and start review - see attached email CAN
|
Application received | | | 8/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 29 2019 3:56PM
|