Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-03364
StatusFinaled
Name SIMPLICTY HOMES LLC
Site Address 2007 S SURREY RD
Project NameJENKINS RESIDENCE
Customer Number 
ePlanReviewYes
Description
**PASSES USING UA TRADE OFF** Permit for the construction of a new 2438 sq. ft., two story (first story 1980 sq. ft., second story 458 sq. ft.) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 130 sq. ft. of covered patio/porch and a 482 sq. ft. attached garage per the approved plans and any notations. R-1A zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/6/20204/7/20204/7/2020APASS
DetailsMike Jordan
Screened- Sam Phone #: ###-####
BLD-Blower Door Test Results4/7/20204/7/20204/7/2020ADONE
DetailsMike Jordan
4.6
DOC - Permit Finaled4/7/20204/7/20204/7/2020PPASS
DetailsMike Jordan
Override - Parcel Holds4/6/20201/1/19004/6/2020  
final inspection on existing building permit
BLD-Energy code compliance1/21/20201/21/20201/21/2020PPASS
DetailsMike Jordan
Sam Phone #: ###-####
BLD-Framing/Rough-in1/15/20201/16/20201/16/2020APASS
DetailsMike Jordan
Sam Phone #: ###-####. All framing correction have been made. Ok to insulate.
Override - Parcel Holds1/15/20201/1/19001/15/2020  
override
BLD-Framing/Rough-in1/13/20201/13/20201/13/2020PFAIL
DetailsMike Jordan
Sam Phone #: ###-####. Complete lateral bracing on F04 and A02 trusses. Fireblock either side of archway in hall and concelled space at ceiling next to archway. Strap double top plate break at beam seat from beam in garage. Install the 4 simpson screws into each stud for the 2x12 ledger connection. Anchor bolts required for the interior bearing wall in garage. Did the inteior thickend footing get placed with slab? Correction notice posted. Ok to insulate.
BLD-Wall Bracing12/11/201912/12/201912/12/2019APASS
DetailsMike Jordan
Sam Phone #: ###-####
Override - Parcel Holds12/11/20191/1/190012/11/2019  
.
BLD-Foundation11/21/201911/21/201911/21/2019PCANC
DetailsMike Jordan
pour at 1:30 // SAm Phone #: ###-####
BLD-Footing11/21/201911/21/201911/21/2019PPASS
DetailsMike Jordan
pour at 1:30 // SAm Phone #: ###-####
BLD-Footing11/20/201911/21/201911/21/2019AFAIL
DetailsMike Jordan
Sam Phone #: ###-####. Column pad footings not the min. 10 inches deep per the approved plans. Also noted that ground, rebar and form work below the min. 34 degress required for concrete placement.
Override - Parcel Holds11/21/20191/1/190011/21/2019  
not splitting lot
Override - Parcel Holds11/21/20191/1/190011/21/2019  
parcel not being divided
Issue PAID IN FULL permit  11/19/2019 DONE
Inspection Record Card- Bld  11/19/2019 DONE
OVERRIDE  10/4/2019  
Plan assigned to (J_N)9/17/20199/17/201910/4/2019 DONE
DetailsJenny Nelson
09/26 sfd L1 ePlan. 1st complete 9/25, sheet size
Routing - PLAN CHECK10/4/2019 10/4/2019 PASS
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  10/4/2019 DONE
DetailsJenny Nelson
Override - Parcel Holds  10/4/2019  
Permit Ready to Issue  10/4/2019 DONE
met
1st review completed  9/25/2019 DONE
DetailsJenny Nelson
Routing - PLAN CHECK9/13/2019 9/25/2019 FAIL
DetailsJenny Nelson
see Brent Moore for questions on parcel hold, sheet sizes
Routing - MECHANICAL9/13/2019 9/17/2019 PASS
DetailsTroy James
Electric cadet wall heaters. No manual j report. Redlined floor plan to provide mechanical ventilation per the IRC section 1507.
Route to Impact Fee Review9/13/20199/16/20199/16/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Plan assigned to (RDP)9/13/20199/13/20199/13/2019 DEFR
DetailsRob Patrick
Routing - PLANNING9/13/2019 9/13/2019 PASS
DetailsJeff Lowe
Verified okay to approve (913-19)
Routing - Addressing9/13/2019 9/13/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS9/13/2019 9/13/2019 PASS
DetailsAngela Hardy
Intake Approval  9/13/2019 PASS
Brent Moore ok'd us to start review with the parcel hold on parcel buit wanted the parcel notes left in there
Override - Parcel Holds  9/13/2019  
Recd Pcfee & Taken To Pln CK  9/13/2019 DONE
Telephone call  9/12/2019 DONE
sent email to Cody R & Brent M to see if we can remove the parecel hold. PLEASE DO NOT PROCEED until we verify it's ok
9-13-19-Bent M ok'd us to take in the permit and start review - see attached email CAN
Application received  8/29/2019 DONE
Application submitted via PDS Online on Aug 29 2019 3:56PM