BLD-Footing | 9/18/2019 | 9/20/2019 | 9/20/2019 | A | PART |
Tony Young
|
|
|
Inspection is for rebar in swimming pool in back yard. All plans and permits are on site in a PVC pipe secured to a T post near the pool equipment. If you have any questions please don''t hesitate to call. Thank you Phone #: ###-#### Inspection requested via web by Brandy McConkey// ok after removing debris and getting 3" clear on rebar
|
BLD-Footing | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | NR |
Tony Young
|
|
|
Inspection is for rebar in swimming pool in back yard. All plans and permits are on site in a PVC pipe secured to a T post near the pool equipment. If you have any questions please don''t hesitate to call. Thank you Phone #: ###-#### Inspection requested via web by Brandy McConkey// needs electrical pass 1st,, needs clearance from soils/rebar,, need to remove all roots and debris
|
OVERRIDE | | | 9/11/2019 | | |
|
|
|
|
Routing Walk-In (Zoning) | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | DONE |
Josh Bogle
|
|
|
make sure what was submitted on eplan is the same as paper plans being turned in
|
Plan assigned to (JAB) Josh | 9/4/2019 | 9/4/2019 | 9/11/2019 | | PASS |
Josh Bogle
|
|
|
09/10 pool, ePlan
|
Routing - PLAN CHECK | 9/4/2019 | | 9/11/2019 | | PASS |
Josh Bogle
|
|
|
|
Issue PAID IN FULL permit | | | 9/11/2019 | | DONE |
|
|
|
|
1st review completed | | | 9/11/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/11/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/11/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/11/2019 | | DONE |
Josh Bogle
|
|
|
ESc yes - Energy no
|
Permit Ready to Issue | | | 9/11/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 9/4/2019 | | 9/6/2019 | | PASS |
Sue Cummings
|
|
|
concret apron need to be 3 ft. fro P.L. see redline
|
Plans ACCEPTED BY PLAN TECH | | | 9/4/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/4/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/4/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/30/2019 | | FAIL |
|
|
|
drawings must be loaded as individual sheets
|
Application received | | | 8/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 29 2019 7:51PM
|