BLD-Final | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | PASS |
Dave Hannah
|
|
|
Julie Phone #: ###-####
|
FIRE-Final Inspection | 2/21/2020 | 2/21/2020 | 2/21/2020 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete, signatures provided on permit sign off card.
|
BLD-Framing/Rough-in | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | PASS |
Dave Hannah
|
|
|
Partial inspection for framing second half of 3rd floor. Phone #: ###-#### Inspection requested via web by Julie Edgar
|
BLD-Framing/Rough-in | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | PART |
Brandon Shaw
|
|
|
Phase II- Pending ELE rough-in cover approval...
|
BLD-Framing/Rough-in | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PART |
Brandon Shaw
|
|
|
first part of 3 north- Julie Phone #: ###-#### OK to cover...
|
Issue PAID IN FULL permit | | | 10/9/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 9/18/2019 | 9/21/2019 | 9/19/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Permit Ready to Issue | | | 9/19/2019 | | DONE |
|
|
|
ALL MET -NEED
GC FORM
REVISED VALUE
|
Plan assigned to (JG) | 9/16/2019 | 9/16/2019 | 9/18/2019 | | PASS |
Javier Guzman
|
|
|
09/18 L1 Boise Cascade 3rd floor ePlan
|
Routing - PLAN CHECK | 9/16/2019 | | 9/18/2019 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 9/18/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/16/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 9/5/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide or address the following:
1. Provide a completed form #304.
2. List Boise City current Codes that the plan will be reviewed under.
3. Hardware description should say what type it is, not just existing.
|
Intake Approval | | | 9/3/2019 | | FAIL |
Brian McGowan
|
|
|
The submittal Checklist must be uploaded with the Documents and all Documents required by the Checklist be provided. Please follow the directions on the Checklist.
Plans must be uploaded as individual Sheets.
|
Application received | | | 8/30/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 30 2019 2:52PM
|