BLD-Final | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | DONE |
Tell Riley
|
|
|
Larry Phone #: ###-####//final complete per the scope of work//demo of walls and plumbing, cabinets etc//the hot water heater is not installed, and a half bath remains//no living space, kitchen or full bath was present at time of inspection//Electrical work was inspected and passed//
|
DOC - Permit Finaled | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 1/28/2020 | 1/29/2020 | 1/29/2020 | P | NR |
Tell Riley
|
|
|
Larry Phone #: ###-####//still needs electrical permit, talked with Daryl, and any electrical termination, demo, or changes require a permit//
|
Routing Walk-In (BLD) | 1/28/2020 | 1/28/2020 | 1/28/2020 | P | PASS |
Josh Bogle
|
|
|
wants to submit a plan mod for this permit
|
Case Summary (BLD) | | | 1/28/2020 | | DONE |
Josh Bogle
|
|
|
|
BLD-Final | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | NR |
Tell Riley
|
|
|
Larry Phone #: ###-####//will need to get electrical permit and final inspection prior to building final//plumbing removed will need to be capped//if bathroom is allowed to stay, scope of permit needs to be updated, as there is no indication of approval for bathroom to stay in garage//
|
Routing Walk-In (BLD) | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 1/9/2020 | | 1/9/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 1/9/2020 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/9/2020 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/9/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 1/9/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/9/2020 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 12/2/2019 | 12/2/2019 | 12/2/2019 | A | FAIL |
Brian McGowan
|
|
|
Did not have any drawings.
|
Routing Walk-In (BLD) | 9/12/2019 | 9/12/2019 | 9/12/2019 | A | FAIL |
Brian McGowan
|
|
|
Larry came in to update the progress of this permit. He is beginning a new job as a long haul trucker and will hire the Architect in the next few weeks.
|
Routing - PLAN CHECK | 9/12/2019 | | 9/12/2019 | | FAIL |
Brian McGowan
|
|
|
Still working on getting plans for the proposed project.
|
Routing Walk-In (BLD) | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/30/2019 | | 8/30/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 8/30/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 8/30/2019 | | | |
|
|
|
|
Routing - PLAN CHECK | 12/2/2019 | | | | FAIL |
Brian McGowan
|
|
|
Larry did not bring in any plans again. He knows he needs to provide drawings. I gave him a list of the drawings we would need last time he came in.
|