Print Statement | | | 7/22/2020 | | DONE |
|
|
|
1st past due
|
Print Statement | | | 4/15/2020 | | DONE |
|
|
|
|
Telephone call | | | 4/15/2020 | | DONE |
|
|
|
email the final fees to mramsey@lusardi.com
|
Third Notice | | 3/10/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Third Notice | | 2/12/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
Second Notice | | 1/9/2020 | 2/7/2020 | | DONE |
|
|
|
mailed 2-10-20
|
First Notice | | 11/30/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
BLD-Final | 11/19/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Collett
|
FIRE-Final Inspection | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Ryan Collett
|
Permanent Occupancy | | | 11/20/2019 | | DONE |
|
|
|
|
FIRE-Alarm Testing | 11/19/2019 | 11/20/2019 | 11/19/2019 | A | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ryan Collett Inspection cancelled from web by: Ryan Collett
|
BLD-Ceiling Grid Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Ceiling Grid Inspection | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | FAIL |
Jim Storey
|
|
|
call upon arrival Phone #: ###-#### Inspection requested via web by Ryan Collett missing support wirers max 8 inches ends of mains.
|
BLD-Framing/Rough-in | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Jim Storey
|
|
|
Framing Phone #: ###-#### Inspection requested via web by Ryan Collett
|
Plan assigned to (JG) | 10/1/2019 | 10/1/2019 | 10/15/2019 | | PASS |
Javier Guzman
|
|
|
Plan Mod Forsgren Associates Inc. ePlan
|
Routing - PLAN CHECK | 10/10/2019 | | 10/15/2019 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 10/15/2019 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 10/15/2019 | | DONE |
|
|
|
plan mod fees paid
|
(F) Reprint permit | | | 10/3/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/3/2019 | | DONE |
|
|
|
Plan mod started in e plan-infill existing wall opening, deleted preciously proposed interior soffit at new offices, new finish plan, addition to new ele data outlets-sheets A100, A200, A210, A300, A302, A303, E1.0 & E4.-assigned to JG
called both Ruben and Mike (Michael) to let know the signed doc need to come back before we can start that plan mod-left message on both phone ext
|
Route to Impact Fee Review | 10/1/2019 | 10/4/2019 | 10/2/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Issue PAID IN FULL permit | | | 9/25/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/25/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 9/5/2019 | 9/5/2019 | 9/18/2019 | | PASS |
Javier Guzman
|
|
|
09/17 L2 The Lusk Bldg 3rd Floor ePlan*
|
Routing - PLAN CHECK | 9/5/2019 | | 9/18/2019 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 9/18/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/18/2019 | | DONE |
|
|
|
all met-NEED
GC FORM-met
REVISED VALUE(don't need since the GC is the applicant) CAN
talked to Abel Paez on the phone-told him how much the fees due are
|
Routing - MECHANICAL | 9/5/2019 | | 9/10/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Flood Plain | 9/5/2019 | | 9/9/2019 | | PASS |
Jason C. Taylor
|
|
|
Project does not meet the Substantial Improvements section of Boise Floodplain Ordinance (B.C.C. 11-08). No floodplain requirements. If you have any questions, please call Jason Taylor at ###-####.
|
Routing - Addressing | 9/5/2019 | | 9/6/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/5/2019 | | 9/5/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 9/4/2019 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 9/3/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 3 2019 5:04PM
|