Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-03412
StatusFinaled
Name LUSARDI CONSTRUCTION COMPANY
Site Address 917 S LUSK ST
Project NameForsgren Associates Inc.
Customer Number 
ePlanReviewYes
Description
(FORSGREN ASSOCIATES INC - THIRD FLOOR) //10-08-2019 PLAN MODIFICATION TO INFILL WALL OPENING, DELETE FROM SCOPE OF WORK THE SOFFIT AT NEW OFFICES, NEW FINISH PLAN, AND ADDITIONAL ELECTRICAL AND DATA OUTLETS. JG// Permit is to remodel within an existing 7,967 sq. ft. office tenant on the 3rd floor. Note: new tenant to occupy the entire third floor. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of floor finish, removal of ceiling tiles and replace with new, removal of ceiling soffit in room #335, removal of built-in seating in room #317, construction of interior non-bearing walls to create (6) offices, select new door/door frames, millwork, new floor finish, select new suspended acoustic ceiling and gypsum soffit, electrical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully fire sprinklered for story increase and area increase. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  7/22/2020 DONE
1st past due
Print Statement  4/15/2020 DONE
Telephone call  4/15/2020 DONE
email the final fees to mramsey@lusardi.com
Third Notice 3/10/20204/3/2020 DONE
mailed 4-6-2020
Third Notice 2/12/20203/5/2020 DONE
mailed 3-6-20
Second Notice 1/9/20202/7/2020 DONE
mailed 2-10-20
First Notice 11/30/201912/30/2019 DONE
mailed 1-1-20
BLD-Final11/19/201911/20/201911/20/2019PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Ryan Collett
FIRE-Final Inspection11/19/201911/20/201911/20/2019APASS
DetailsJim Page
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Ryan Collett
Permanent Occupancy  11/20/2019 DONE
FIRE-Alarm Testing11/19/201911/20/201911/19/2019ACANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Ryan Collett Inspection cancelled from web by: Ryan Collett
BLD-Ceiling Grid Inspection11/15/201911/15/201911/15/2019PPASS
DetailsJim Storey
BLD-Ceiling Grid Inspection11/14/201911/15/201911/15/2019AFAIL
DetailsJim Storey
call upon arrival Phone #: ###-#### Inspection requested via web by Ryan Collett missing support wirers max 8 inches ends of mains.
BLD-Framing/Rough-in10/22/201910/23/201910/23/2019APASS
DetailsJim Storey
Framing Phone #: ###-#### Inspection requested via web by Ryan Collett
Plan assigned to (JG)10/1/201910/1/201910/15/2019 PASS
DetailsJavier Guzman
Plan Mod Forsgren Associates Inc. ePlan
Routing - PLAN CHECK10/10/2019 10/15/2019 PASS
DetailsJavier Guzman
Permit Ready to Issue  10/15/2019 DONE
plan mod
CHANGE STATUS TO (ISS)  10/15/2019 DONE
plan mod fees paid
(F) Reprint permit  10/3/2019 DONE
Plan Modification Accepted  10/3/2019 DONE
Plan mod started in e plan-infill existing wall opening, deleted preciously proposed interior soffit at new offices, new finish plan, addition to new ele data outlets-sheets A100, A200, A210, A300, A302, A303, E1.0 & E4.-assigned to JG
called both Ruben and Mike (Michael) to let know the signed doc need to come back before we can start that plan mod-left message on both phone ext
Route to Impact Fee Review10/1/201910/4/201910/2/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Issue PAID IN FULL permit  9/25/2019 DONE
Print Occupancy Form  9/25/2019 DONE
Plan assigned to (JG)9/5/20199/5/20199/18/2019 PASS
DetailsJavier Guzman
09/17 L2 The Lusk Bldg 3rd Floor ePlan*
Routing - PLAN CHECK9/5/2019 9/18/2019 PASS
DetailsJavier Guzman
1st review completed  9/18/2019 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/18/2019 DONE
Permit Ready to Issue  9/18/2019 DONE
all met-NEED
GC FORM-met
REVISED VALUE(don't need since the GC is the applicant) CAN
talked to Abel Paez on the phone-told him how much the fees due are
Routing - MECHANICAL9/5/2019 9/10/2019 PASS
DetailsTroy James
Routing PW Flood Plain9/5/2019 9/9/2019 PASS
DetailsJason C. Taylor
Project does not meet the Substantial Improvements section of Boise Floodplain Ordinance (B.C.C. 11-08). No floodplain requirements. If you have any questions, please call Jason Taylor at ###-####.
Routing - Addressing9/5/2019 9/6/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS9/5/2019 9/5/2019 PASS
DetailsAngela Hardy
Intake Approval  9/4/2019 PASS
DetailsJavier Guzman
Application received  9/3/2019 DONE
Application submitted via PDS Online on Sep 3 2019 5:04PM