BLD-Final | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | PASS |
Dave Hannah
|
|
|
call ahead for access - blaine Phone #: ###-####
|
FIRE-Final Inspection | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are placed in common areas with current inspection tags. Final life fire safety inspection for area of work complete, signature card not available at time of inspection. Noted that area of work has been occupied before inspection process has been completed.
call ahead- blaine Phone #: ###-####
|
FIRE-Final Inspection | 12/23/2019 | 12/24/2019 | 12/24/2019 | A | FAIL |
Jim Page
|
|
|
Fire sprinkler modifications are required for the scope of work, a seperate permit is required for any and all modifications to fire sprinkler system.
call for access when you get there // Blaine Phone #: ###-####
|
BLD-Framing/Rough-in | 10/28/2019 | 10/29/2019 | 10/29/2019 | A | PASS |
Dave Hannah
|
|
|
call for access // Blaine Phone #: ###-####
|
Inspection Record Card- Bld | | | 10/17/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/17/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 9/14/2019 | 9/17/2019 | 9/16/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Permit Ready to Issue | | | 9/16/2019 | | DONE |
|
|
|
NEED
GC FORM
REVISED VALUE
|
Plan assigned to (JG) | 9/10/2019 | 9/10/2019 | 9/14/2019 | | PASS |
Javier Guzman
|
|
|
09/12 L1 IHFA ePlan
|
Routing - PLAN CHECK | 9/10/2019 | | 9/14/2019 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 9/14/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/6/2019 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 9/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 4 2019 3:06PM
|