BLD-Final | 5/19/2020 | 5/20/2020 | 5/20/2020 | A | PASS |
Tony Young
|
|
|
Building Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
DOC - Permit Finaled | 5/20/2020 | 5/20/2020 | 5/20/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 5/20/2020 | 5/20/2020 | 5/20/2020 | P | PASS |
Tony Young
|
|
|
Building Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk// 3.0
|
PubWorks Occupancy Approval | 5/20/2020 | 5/20/2020 | 5/20/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage (including roof drainage connection to the subdivision system and stabilization) is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
Routing - MECHANICAL | 5/1/2020 | | 5/1/2020 | | PASS |
Troy James
|
|
|
Resubmitted ACCA report
|
BLD-Energy code compliance | 2/6/2020 | 2/7/2020 | 2/7/2020 | A | PASS |
Tony Young
|
|
|
Insulation Inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
BLD-Framing/Rough-in | 1/31/2020 | 2/3/2020 | 2/3/2020 | A | PASS |
Tony Young
|
|
|
Final Framing Inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk// ok to insulate
|
BLD-Framing/Rough-in | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | PART |
Tony Young
|
|
|
Soffit Inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk,, soffits are work in progress,, needs electrical pass on some and insulation on floor overhang soffit areas
|
BLD-Wall Bracing | 12/9/2019 | 12/10/2019 | 12/10/2019 | A | PASS |
Tony Young
|
|
|
Shear Wall Inspection. Thank you Phone #: ###-#### Inspection requested via web by Clayton Conner// exterior ok
|
BLD-Wall Bracing | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PART |
Tony Young
|
|
|
Shear Wall Inspection. Thank you Phone #: ###-#### Inspection requested via web by Clayton Conner/// work in progress
|
BLD-Foundation | 11/1/2019 | 11/4/2019 | 11/4/2019 | A | PART |
Tony Young
|
|
|
edguar Phone #: ###-####,, work in progress,, ok
|
BLD-Footing | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | PASS |
Tony Young
|
|
|
Edgar Phone #: ###-####
|
BLD-Footing | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | PART |
Tony Young
|
|
|
Edgar Phone #: ###-####,, forms ok,, rebar has not been delivered yet
|
PubWorks Subgrade Approval | 10/21/2019 | 10/21/2019 | 10/21/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
(F) Reprint permit | | | 10/18/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/11/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/11/2019 | | DONE |
|
|
|
|
Telephone call | | | 10/11/2019 | | DONE |
|
|
|
Email permits to be signed to -connerconstruction@outlook.com
Eplan will need to be release
|
OVERRIDE | | | 10/9/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 9/11/2019 | 9/11/2019 | 10/9/2019 | | DONE |
Jenny Nelson
|
|
|
09/30 sfd L2 ePlan. 1st complete 9/30 - need engineering for patio cover
|
Routing - PLAN CHECK | 10/9/2019 | | 10/9/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 10/9/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/11/2019 | | 9/30/2019 | | FAIL |
Jenny Nelson
|
|
|
|
1st review completed | | | 9/30/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 9/12/2019 | | 9/20/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLANNING | 9/11/2019 | | 9/20/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - MECHANICAL | 9/11/2019 | | 9/17/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - FIRE | 9/11/2019 | 9/11/2019 | 9/16/2019 | | PASS |
Lee G Meredith
|
|
|
09/24-922 E Chardie Rd. 404 ePlan LGM - No sprinklers required
|
Route to Impact Fee Review | 9/11/2019 | 9/14/2019 | 9/12/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 9/11/2019 | | 9/12/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/11/2019 | | 9/12/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 9/11/2019 | | 9/12/2019 | | PASS |
Michael Zawacki
|
|
|
Builder is also owner of project and RP.
|
Intake Approval | | | 9/11/2019 | | FAIL |
|
|
|
NEED
FULL HEIGHT FOR ELEVATION
FOUNDATION PLANS NEED TO BE STAMPED AND SIGNED BY ENGINEER
|
Plans ACCEPTED BY PLAN TECH | | | 9/11/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/11/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/11/2019 | | DONE |
|
|
|
|
Application received | | | 9/5/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 5 2019 12:25PM
|