BLD-Final | 7/13/2020 | 7/16/2020 | 7/16/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 7/16/2020 | 7/16/2020 | 7/16/2020 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 7/13/2020 | 7/13/2020 | 7/13/2020 | P | PASS |
Mike Jordan
|
|
|
4 (This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Final | 7/6/2020 | 7/13/2020 | 7/13/2020 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall. Handrail does not extend to first or last riser. Everything else ok. (This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Blower Door Test Results | 7/6/2020 | 7/13/2020 | 7/13/2020 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Energy code compliance | 4/29/2020 | 5/6/2020 | 5/6/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/29/2020 | 5/4/2020 | 5/4/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 3/27/2020 | 3/27/2020 | 3/27/2020 | P | PART |
Tell Riley
|
|
|
Jorge Phone #: ###-####//need to add hot dip galvanized nails to pt//add blocking///add straps on 2nd story//
|
Place hold on job | 3/25/2020 | | 3/27/2020 | | DONE |
Tiffany Carson-Herker
|
|
|
reinspection fee per mike j. no inpsections until fee is paid
|
Fees Due Hold | 3/26/2020 | | 3/26/2020 | | DONE |
|
|
|
|
BLD-Wall Bracing | 3/26/2020 | 3/26/2020 | 3/26/2020 | P | CANC |
Jim Storey
|
|
|
jorge Phone #: ###-#### fee not paided
|
BLD-Wall Bracing | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | CANC |
Mike Jordan
|
|
|
jorge Phone #: ###-####086
|
BLD-Wall Bracing | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | FAIL |
Mike Jordan
|
|
|
Jorge Phone #: ###-####. No city approved plans on site. reinspection fee issued.
|
BLD-Foundation | 12/10/2019 | 12/10/2019 | 12/10/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Edgar Sanchez
|
BLD-Footing | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 12/4/2019 | 12/4/2019 | 12/4/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 11/8/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/8/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 10/3/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 10/2/2019 | 10/2/2019 | 10/3/2019 | | DONE |
Jenny Nelson
|
|
|
|
1st review completed | | | 10/3/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 10/3/2019 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 9/6/2019 | | 10/3/2019 | | PASS |
Jenny Nelson
|
|
|
|
Plan assigned to (RDP) | 9/6/2019 | 9/6/2019 | 10/2/2019 | | DEFR |
Rob Patrick
|
|
|
09/19 sfd L1 ePlan
|
Route to Impact Fee Review | 9/6/2019 | 9/9/2019 | 9/9/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 9/6/2019 | 9/6/2019 | 9/9/2019 | | PASS |
Lee G Meredith
|
|
|
09/19-1525 S Boulder View Ln Residential
Sprinklers are not required.
|
Routing - MECHANICAL | 9/6/2019 | | 9/9/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/6/2019 | | 9/9/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Application received | | | 9/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 6 2019 8:47AM
|
Plans ACCEPTED BY PLAN TECH | | | 9/6/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/6/2019 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 9/6/2019 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/6/2019 | | DONE |
|
|
|
|
Routing - Addressing | 9/6/2019 | | 9/6/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/6/2019 | | 9/6/2019 | | PASS |
Morgan Webb
|
|
|
|